Pipeline Laying Contract on Rate Contract basis
2026_ONGC_268801_1
ZW1PC26001
Global Tenders
Pipe Laying Works
Turn-key
1826 days
As per tender
as per tender document
20 documents required · 20 mandatory
₹0
₹8 Cr
15th Floor Maker Towers-E Cuffe Parade Mumbai
7 Sept 2026
26 Feb 2026
8 Sept 2026
26 Feb 2026
7 Sept 2026
13 Apr 2026
26 Feb 2026 - 11 Mar 2026
10 Mar 2026
Project : Western Offshore Pipe laying Rate Contract (WOPL-RC)
Ref Activity Weightage Amount of Col. B in Quoated Currency derived for each season Milestone % Milestone % Milestone for Payment Milestone Amount
1.1 Insurance 3.11 % of I.A of instant season 85 85 a) Upon submission of certificate of insurance (Cover Note) for insurance policy(s) specific for the Season wise Value for the firm scope of work of the project and its acceptance by Company in terms of clause 7.3.13.1.(a),(b)&(c) of GCC and proof of 100% premium paid to Insurance Company.
15 15 b) Upon submission of insurance policy(s) specific for the Season wise Value for the firm scope of work of the project and its acceptance by Company in terms of clause 7.3 of GCC.
2.1 Submarine Pipelines and Risers/ OFC/Umbilical 92.89% of S.SURP of Table II-A3 of instant season 40 40 a) Upon completion of pre-engineering survey and submission of complete survey report and its acceptance by Company.
20 20 b) Upon completion of pre-installation survey and submission of complete survey report and its acceptance by Company.
40 40 c) Upon completion of post- installation survey and submission of complete survey report and its acceptance by Company.
*For pipeline segments, data of Pipeline route corridor survey will be shared by company and payment towards milestone no.2.1(a) shall be made along with milestone no.2.1(b).
3.0 DESIGN AND ENGINEERING
3.1 Submarine Pipelines and Risers 92.89% of S.DESP of Table II-A3 of instant season 100 100 a) Upon progressive completion of engineering as approved and certified by Company.
4.0 PROCUREMENT OF EQUIPMENT & MATERIALS
4.1 Subsea WN Flange/Subsea Swivel Flange/Subsea Ball Valve /Flow TEE/ Subsea Piggable wye TEE/Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) 20 % of 92.89% of I.A(i) b) of Table A-3 I.A, I.B, I.C & I.D of instant season 5 5 * a) Upon progressive placement of LOI and acceptance by vendor.
5 10 * b1). 5% Upon progressive approval of prelim Purchase Specifications at 1st Stage, for PS items, as applicable. #
5 b2). 5% Upon progressive approval of final Purchase Specification at 2nd Stage, for PS items, as applicable. #
60 60 c) Upon progressive dispatch from vendor works and submission of inspection & dispatch documents.
20 20 d) Upon progressive arrival at fabrication yard/site submission of material test certificates and test reports, verification by TPI/CA and acceptance by Company.
5 5 e) Upon progressive submission of release note of Certification Agency and clearance of punch points related to the above procurement milestones, if any
4.2 Procurement of material for crossings, (milestone will be paid after completion of all crossings of each segment) 20 % of 92.89% of S.CROSS of Table II-A3 of instant season 85 85 a) Procurement of Crossings Materials and arrival at yard/offshore
15 15 b) Completion of procurement related punch points.
4.3 Procurement of material for freespan (milestone will be paid after completion of all freespan of each segment) 20% of 92.89% of S.FREE of Table II-A3 of instant season 85 85 a) Procurement of Freespan Material and arrival at yard/offshore
15 15 b) Completion of procurement related punch points.
* Applicable where the selected vendor is from ONGC’s vendor list or where PQD has already been approved by ONGC before placement of LOI. For others, where PQD is not approved before LOI, payment against milestones a & b above (i.e placement of LOI & upon approval of PS) will be issued together and Contractor will get 15% on completion of milestone ‘a’ and ‘b’ together.
# For non-PS-items, 10% above (b1 & b2) shall be clubbed with dispatch of material milestone (c)
1) Basis for milestone achievement for Sl. No. 5.1 to 5.3 shall be as per PS/MTO quantity for order placement per pipeline segment scope of work, this shall be based on design and engineering.
5.0 FABRICATION - STRUCTURAL & NON-STRUCTURAL
5.1 New riser protectors / barge bumpers (Includes procurement & fabrication) 20 % of 92.89% of iv) of I.A(i) c) TABLE-I PART C of instant season 85 85 a) Upon progressive completion of fabrication as certified by Company.
10 10 b) Upon completion of respective sail out.
5 5 c) Upon completion of punch point related to the above fabrication milestones, if any.
5.2 Subsea Mudmats/Skids including Piling (Includes procurement & fabrication) 20 % of 92.89% of v) of I.A(i) c) of TABLE-I PART C of instant season 85 85 a) Upon progressive completion of fabrication as certified by Company.
10 10 b) Upon completion of respective sail out.
5 5 c) Upon completion of punch point related to the above fabrication milestones, if any.
5.3 Jacket Strengthning- Steel (Includes procurement & fabrication) 20% of 92.89% of xv) of I.A(i) c) of TABLE-I PART C of instant season 85 85 a) Upon progressive completion of fabrication as certified by Company.
10 10 b) Upon completion of respective sail out.
5 5 c) Upon completion of punch point related to the above fabrication milestones, if any.
5.4 Jacket Strengthening - Grout (Includes procurement & fabrication) 20 % of 92.89% of xvi) of I.A(i) c) of TABLE-I PART C of instant season 85 85 a) Upon progressive completion of fabrication as certified by Company.
10 10 b) Upon completion of respective sail out.
5 5 c) Upon completion of punch point related to the above fabrication milestones, if any.
6.0 TRANSPORTATION AND INSTALLATION
6.1 Submarine Pipelines/OFC/Umbilical 92.89% of S.INSP of Table II-A3 of instant season 5 5 a) Upon arrival of materials at offshore
85 85 b) Upon completion of installation/ laying of each pipeline segment.
10 10 c) Upon adjustments of variations and completion of punchpoints if any, of each pipeline segment /respective item.
6.2 Installation of risers (including fabrication of riser bends, riser clamps, sub-sea tie-in spools etc. ) 92.89% of S.INSRI of Table II-A3 of instant season 5 5 a) Upon arrival of materials at offshore
85 85 b) Upon progressive completion of riser and I/J Tube installation and spool tie in.
10 10 c) Upon submission of release note by certification agency and completion of punch points related to Installation, if any.
6.3 Installation of New riser protectors / New barge bumpers / 80% of 92.89% of iv) of I.A(i) c) of TABLE-I PART C of instant season 5 5 a) Upon arrival of materials at offshore
85 85 b) Upon progressive completion of riser and I/J Tube installation and spool tie in.
10 10 c) Upon submission of release note by certification agency and completion of punch points related to Installation, if any.
6.4 Installation of Subsea Mudmats/Skids including Piling (including 4 nos. Piling) 80% of 92.89% of v) of I.A(i) c) of TABLE-I PART C of instant season 5 5 a) Upon arrival of materials at offshore
85 85 b) Upon progressive completion of riser and I/J Tube installation and spool tie in.
10 10 c) Upon submission of release note by certification agency and completion of punch points related to Installation, if any.
6.5 Jacket Strengthning- Steel 80% of 92.89% of xv) of I.A(i) c) of TABLE-I PART C of instant season 5 5 a) Upon arrival of materials at offshore
85 85 b) Upon progressive completion of riser and I/J Tube installation and spool tie in.
10 10 c) Upon submission of release note by certification agency and completion of punch points related to Installation, if any.
7.8 Jacket Strengthening - Grout 92.89% of xvi) of I.A(i) c) of TABLE-I PART C of instant season 5 5 a) Upon arrival of materials at offshore
85 85 b) Upon progressive completion of riser and I/J Tube installation and spool tie in.
10 10 c) Upon submission of release note by certification agency and completion of punch points related to Installation, if any.
7.9 Demolition of riser 92.89% of S.DEMR of I.A(i) c) of Table II-A3 of instant season 90 90 a) Upon demolition of riser and two pipe-lengths
10 10 b) Upon submission of proof of receipt for demolished material at NHAVA and completion of punch points.
7.10 Installation of crossings, (milestone will be paid after completion of all crossings of each segment) 80% of 92.89% of S.CROSS of Table II-A3 of instant season 85 85 a) Progressive payment segmentwise upon Installation of crossings
15 15 b) Upon adjustments of variations and completion of punch points if any, of each pipeline segment /respective item
7.11 Installation of freespan (milestone will be paid after completion of all freespan of each segment) 80 % of 92.89% of S.FREE of Table II-A3 of instant season 85 85 a) Progressive payment segmentwise upon Installation of freespan.
15 15 b) Upon adjustments of variations and completion of punchpoints if any, of each pipeline segment /respective item
7.12 Installation of SPRUs (as applicable) 92.89% of S.SPRU of Table II-A3 of instant season 5 5 a) Upon arrival of materials at offshore
85 85 b) Upon completion of installation on each pipeline segment
10 10 c) Upon completion of punch points, if any
7.13 Burial/Flush Burial/Dredging 92.89% of vi- xiv of TABLE-I PART C of instant season 100% 100% Upon progressive Completion and acceptance by Company
Note: 1. Basis of milestone achievement shall be per segment for pipelines, per demolition of riser and of riser protector with associated topside facilities. Milestones 7.1(c ), 7.4(b) and 7.5(b) to be raised after completion of all these activities of each pipeline.
8.0 Testing/Pre- Commissioning and Commissioning assistance (wherever applicable and as per scope of work)
8.1 Submarine Pipelines along with Riser/OFC/Umbilical 92.89% of S.PRE of Table II-A3 of instant season 80 80 a) Upon completion of Hook-up, testing, pre-commissioning work of each segment
10 10 b) Upon submission of test reports & its acceptance by Company
10 10 c) Upon submission of Certificate of Approval for the respective facility from Certification Agency
9.0 Liquidation of punch points
9.1 Liquidation of punch points 2.00% of I.A. of instant season 100 100 Upon completion of Punch Points related to Hookup, Pre-commissioning, commissioning activity, if any
10.0 AS-BUILT DOCUMENTATION
10.1 As Built for work to be completed in the scope of Contractor 2.00% of I.A. of instant season 100 100 Payment upon submission of As-built drawing, documents, Software Files (as applicable) , Vendor dossiers, Operation & Maintenance Manuals etc. for the respective line segment in the project Scope and acceptance by Company as per GCC 5.1.9.3.
11 Customs Duty 100% of I.B. of Appendix A3 of instant season 100 100 Reimbursement at actual limited to the amount indicated herein on submission of documentary proof viz. bill of entry in original duly addressed by the Custom Authority and the amount of duty paid thereof along with relevant supporting documents subject however to provisions of change in law as per clause 7.6 (subsequent legislation) of GCC.
12 Goods and Service Tax 100% of I.C. of Appendix A3 of instant season 100 100 Payable at actual, limited to the amount indicated herein, along with relevant milestone as per invoice under Goods and Service Tax rules subject however to provisions of change in law as per clause no. 7.6 (Sub-sequent legislation) of GCC.
1 The line segments, along with their respective sizes and lengths as detailed in the A3/ Schedule of Rates (SOR), represent the indicative scope of work considered for evaluation of bids across three seasons. These quantities are used solely for comparative assessment during the bidding process. However, the actual scope of work—as identified and finalized by Company shall be communicated to the successful bidder prior to commencement of seasonal activities. Values for above Activities will be worked out based on finalized scope of work for each season for making payments as per above MPF. Payment shall be actual executed quantity based on unit rates quoted in Price Shcedule (A-3) and above MIlestone Payment Formula.
2 Taxes and duties shall be paid in INR only.
3 The requirement of dispatch / sail out wherever referred shall be the "Bill of Lading" for dispatch (as applicable) and certificate of carrier for sail out (as applicable).
4 All yard and offshore related activities to be inspected and certified by Certification Agency / Third Party Inspection Agency.
5 Release notes shall be issued by Certification Agency.
6 Milestone to be submitted platform wise, pipeline segment wise and riser wise.
7 Payment of transportation of pipelines and installation of pipeline with / without Robotic arm will be done together.
Pipeline Unit rates
Pipeline Segment Nom. Dia. in Inches Approx. length, km. (l) Design Engineering Survey Procurement of Coated Line Pipe/ Flexible Transportation from coating yard to offshore Installation Hook-Up with existing facilities/Testing/Pre- Commissioning and Commissioning
NON NACE NACE Flexible
Pipelines including Risers Pipelines including Risers Internally coated (liquid epoxy) Internally coated (FBE with robotic arm) Not internally coated Pipeline Flexibles Riser Freespan Crossing Pipelines including Risers
Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per freespan Unit rate per crossing Unit rate per m
Pipeline Laying Project (PLP)
Name of Bidder:
SL. NO. SHEET NAME DESCRIPTION
1 A-3 I.A, I.B, I.C & I.D CURRENCYWISE CALCULATION OF TOTAL PRICE
2 A-3 TABLE-I PART A PIPELINE LAYING PRICE
3 A-3 TABLE-I PART B SUBSEA ITEMS PRICE
4 A-3 TABLE-I PART C MISCELLANEOUS PRICE, MOB-DEMOB CHARGES & MARINE SPREAD FOR LOADING OF BIDS.
5 A-3 TABLE-II PRICE CALCULATION EXCLUDING MOB-DEMOB, SUBSEA ITEMS COST, CUSTOM DUTIES & GST
6 A-3 PART D ADDITIONAL ITEMS IN A-3
1 Do not change the name of any excel file as formulas under A3 and A10 are interlinked.
2 Bidders need to fill data in applicable yellow tabs only. Bidder are not to temper with any tab.
3 The price indicated at I.A shall be currency-wise price, derived from calculations in Table-II and based on the rates quoted by the bidders in Table-I-Part A , Table-I-Part B and Table-I-Part C. Bidder shall submit separate excel file for each currency. This shall be subject to provisions laid out in ITB Cl.13 and Note 10 in Sheet A-3 I.A,I.B,I.C & I.D
Pipeline Laying Project (PLP)
Currency of Quote
I.A. TOTAL PRICE
Sl. No. Item (a) Unit rate (per MT) (b) Weight in MT (c) AMOUNT (d)
I.A(i) a) Total of Segment Prices under A-3 TABLE-II Not Applicable Not Applicable Error
b) SOR for Subsea items under A-3 TABLE-I Part B Not Applicable Not Applicable 0.00
c) Total of Other Items Under A-3 TABLE-I Partc C Not Applicable Not Applicable 0.00
I.A(ii) Total Price of Marine Spread Mobilisation/Demobilisation underA-3 TABLE-I PART C Not Applicable Not Applicable 0.00
I.A(iii) Total price for "Marine Spread Proposed to be deployed by the contractor" under A-3 TABLE-I PART C Not Applicable Not Applicable 0.00
Sub total I.A=I.A(i) + I.A(ii)+ I.A(III) Error
I.B. CUSTOMS DUTY (Basic Customs Duty)
Sl. No. ITEM AMOUNT
I.B i) Customs duty on “imported materials/equipment/items” under A-3 PART D as per Clause 3.4.1.1 of GCC 0.00
ii) Custom duty on “Constructional Plant and equipment” A-3 PART D as per Clause 3.4.1.3 of GCC 0.00
iii) Custom duty on “As built Documents” A-3 PART D as per Clause 3.4.1.4 of GCC 0.00
Sub Total I.B. [I.B.(i) + I.B.(ii) + I.B.(iii)] 0.00
I.C. GST as applicable on {I.A(i) + I.A(ii) + I.B} 0.00
I.D. Total price for execution of the indicative scope of work as detailed in Bid Document (I.A. + I.B. + I.C.)- I.A(III) #VALUE!
I.E. Price Including I.A (iii) (Marine Spread Proposed to be deployed by the contractor) for arriving at Evaluated Pice (I.D + I.A (iii)) #VALUE!
Percentage of Local Content (LC) as per the PPP-MII policy in the bid of ____________ (name of bidder) is ______ %.
% of Local Content [prices for goods, works, or services (including Indian Agent Commission and GST amount) sourced in India] {For Foreign Bidders} x
% of Import Content {For Indian Bidders} x
1 Bidder shall fill out details in cells highlighted in yellow in tabs 'A-3 I.A, I.B,I.C &I.D' ,'A-3 Table-I Part A''A-3 Table-I Part B''A-3 Table-I Part C'&'A-3 Table-I Part D'.
2 The price indicated at I.A shall be currency-wise cost, derived from calculations in Table-II based on the rates quoted by the bidders in Table-I-Part A , Table-I-Part B and Table-I-Part C. Bidder shall submit separate excel file for each currency. This shall be subject to provisions laid out in ITB Cl.13 and Note 10 in Sheet A-3 I.A,I.B,I.C & I.D
3 Bidder to note that price at I.A.(i) will be auto computed based on bidder's unit rates' quotes (in highlighted cells) from tabs 'A-3 Table-I Part A' 'Part B'' & 'Part C'
5 Bidder to note that price at I.A.(ii) will be auto computed based on bidder's mob-demob charges (in highlighted cells) from tabs 'A-3 Table-I Part C'.
6 Bidder to note that price at I.B. and I.C. will be auto computed based on bidder's rates' quotes (in highlighted cells) from tabs 'A-3 Table-I Part D'.
7 The price indicated at I.D for all different currency(which will be created in different file) will be summed up for calculations and arriving at the total rate contract price.
8 Bidder to note that Prie at I.E. will be autocomputed based on Total price I.D. and I.A (iii) (Marine Spread Proposed to be deployed by the contractor) for arriving at Evaluated Pice
9 Total price quoted by the bidder shall be inclusive of all cost, taxes & duties inter alia, insurance.
10 The Bidders are to quote firm prices. Foreign bidders can quote the price and receive payments either in Indian Rupees or US Dollars or Euros or Pound Sterling or Yen or other relevant currencies, or a combination thereof. However, prices for goods, works, or services (including Indian Agent Commission) sourced in India must be quoted and shall be paid by ONGC only in Indian Rupees to the extent of their Local Content indicated in the bid. In all cases, Indian Agent commission shall be paid in INR only. Indian bidders are required to quote in INR only, however Indian bidders can quote and receive payment in foreign currency to the extent of their import content indicated in the bid. The freight and insurance elements must be quoted by Indian bidders in Indian Rupees only and payment will be made accordingly. The payment towards GST will be made by ONGC in Indian Rupees as per actuals, irrespective of Indian or Foreign bidder. For this purpose, the amount of GST paid as per the invoice signed by the officer duly authorized for this purpose will be taken into account. Currency once quoted will not be allowed to be changed.
TABLE-I PART A - PIPELINE LAYING COSTS
Sl. No. Dia. in Inches Survey (S.SURP) Transportation & Installation Precommissioning Fixed Effort Charges for Set-up of pipe-lay of each Segment
Pipeline/OFC/Umbilical Riser
Pipeline with Robotic arm FBE coating (S.INSP) Pipeline with FBE Sleeve coating(S.INSP) Pipeline without Robotic arm LE/NO coating/OFC installation/ Umbilical Installation (S.INSP) Riser(S.INSRI) Freespan(S.FREE) Crossing(S.CROSS) SPRU (S.SPRU) Precommissioning(S.PRE) Effort(S.EFFORT)
Unit rate per m Unit rate per riser Unit rate per m Unit rate per m Unit rate per m Unit rate per riser Unit rate per freespan Unit rate per crossing Unit rate per no. Unit rate per m Unit rate per segment
1 2"(piggy back) NA
13 OFC (Piggy Back) NA
Notes For sub marine pipelines:
1 All rates are excluding mob-demob, GST & Custom duty
2 Bidder has to quote for the submarine pipeline segments as per indicative scope of work as described in the Bid document considering the following notes also:
3 Bidder to note that unit rates against each line size shall be quoted for Pipeline with and without Robotic arm FBE coating. The above rate should include all consummables, required materials to complete the scope of work as per bid except the items indicated at A-3 TABLE-I PART B and FIMs to be issued by Company as per Scope of work.
4 The price of activities shall be calculated in Table II by using the unit rates of activities quoted by Bidder in Table-I Part A of A-3.
5 The length of pipes mentioned in Table II is indicative only, the length shall be firmed up during detailed engineering for the scope as per actual pipeline route survey.
6 Riser length is considered as 100 m at ends of each segment. Unit price of riser - Installation shall include cost for additional support members (needed to be installed on the jacket) for installation of riser and I/J Tube clamps at existing platforms as per the Bidding Documents and design requirement. There shall be no Adjustment on account of Changes inRiser length.
7 There shall be no Adjustment on account of clamps (hanger, fixed or adjustable) for risers and I/J Tubes. Unit rates included for riser related activities shall account for these items.
8 "Transportation & Installation" unit rate mentioned at Table –I part A shall also include internal coating inlcuding sleeves for FBE & LE (wherever applicable) as per details given in the bidding documents.
9 The unit rate mentioned at Table-I part A shall also include the cost of materials, equipment, providing all labor, services, inspections, input required for procurement, cost of all activities specified to be carried out at the contractor’s/sub-contractor’s yard {viz. fabrication, erection/assembly, all transportation upto onshore/offshore installation sites, weather risk, in –transit insurance from vendor’s/ sub- contractor’s works to the contractor’s yard /offshore installation site and landing charges, if any, at the port of destination. The above cost will also include all associated cost incidental to delivery of materials to the offshore site including all taxes and duties except GST ,BCD & Mob- Demob.
10 Survey unit rates in Table-I Part A shall include complete Pipeline & Riser/ I/J tube system and related facilities as per detail given in the bidding documents.
11 Riser Installation cost shall also include cost for Design, fabrication, Transportation & installation of Riser clamps etc for completing installation of riser activity. However it is to be noted that seperate cost for Riser demolition per riser basis and Cost for new riser protectors / new barge bumpers per Tonne basis are considered under Table-I Part C.
12 For the purpose of pipeline quantity variation, the riser length shall include zone-2(12.2 m horizontal length from the bottom end of the riser bend) and not to be considered as part of pipeline length for adjustment purpose.
13 Fixed Effort Charges for Set-up of pipe-lay of each Segment. Contractor has to quote against one segment i.e. 4" Pipeline for effort charges and the same rate will be populated for other segments except piggy back line
14 Survey Cost S.SURP cannot be more than 3% of the total price of each line item in A-3 Table II
Item Rate Schedule-SOR for Subsea items
Pipeline Laying Project (PLP)
Sr No Description Unit Quantity Unit Rate inclusive of all applicable taxes & duties except GST Total amount inclusive of all applicable taxes & duties except GST
Currency Currency
A Subsea Items SOR for 1500 Class
1.00 Supply & Installation of Subsea items for 4" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
2.00 Supply & installation of Subsea Material for 6" Line Pipes
a) Subsea WN Flange No. 8 0.00
b) Subsea Swivel Flange No. 8 0.00
c) Subsea Ball Valve (Full bore) with blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 8 0.00
3.00 Supply & installation of Subsea Material for 8" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
4.00 Supply & installation of Subsea Material for 10" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
5.00 Supply & installation of Subsea Material for 12" Line Pipes
a) Subsea WN Flange No. 8 0.00
b) Subsea Swivel Flange No. 8 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 8 0.00
6.00 Supply & installation of Subsea Material for 14" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
7.00 Supply & installation of Subsea Material for 16" Line Pipes
a) Subsea WN Flange No. 8 0.00
b) Subsea Swivel Flange No. 8 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 8 0.00
8.00 Supply & installation of Subsea Material for 18" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
9.00 Supply & installation of Subsea Material for 20" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
10.00 Supply & installation of Subsea Material for 22" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
11.00 Supply & installation of Subsea Material for 24" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
Sub Total for A 0.00
Sr No Description Unit Quantity Unit Rate inclusive of all applicable taxes & duties except GST Total amount inclusive of all applicable taxes & duties except GST
Currency Currency
B Subsea Items SOR for 900 Class
1.00 Supply & Installation of Subsea items for 4" Line Pipes
a) Subsea WN Flange No. 12 0.00
b) Subsea Swivel Flange No. 12 0.00
c) Subsea Ball Valve (Full bore) with blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 12 0.00
2.00 Supply & installation of Subsea Material for 6" Line Pipes
a) Subsea WN Flange No. 32 0.00
b) Subsea Swivel Flange No. 32 0.00
c) Subsea Ball Valve (Full bore) with blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 32 0.00
3.00 Supply & installation of Subsea Material for 8" Line Pipes
a) Subsea WN Flange No. 24 0.00
b) Subsea Swivel Flange No. 24 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 24 0.00
4.00 Supply & installation of Subsea Material for 10" Line Pipes
a) Subsea WN Flange No. 40 0.00
b) Subsea Swivel Flange No. 40 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 10 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 10 0.00
e) Subsea Piggable wye TEE No. 10 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 40 0.00
5.00 Supply & installation of Subsea Material for 12" Line Pipes
a) Subsea WN Flange No. 76 0.00
b) Subsea Swivel Flange No. 76 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 10 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 10 0.00
e) Subsea Piggable wye TEE No. 10 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 76 0.00
6.00 Supply & installation of Subsea Material for 14" Line Pipes
a) Subsea WN Flange No. 32 0.00
b) Subsea Swivel Flange No. 32 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 4 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 4 0.00
e) Subsea Piggable wye TEE No. 4 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 32 0.00
7.00 Supply & installation of Subsea Material for 16" Line Pipes
a) Subsea WN Flange No. 32 0.00
b) Subsea Swivel Flange No. 32 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 32 0.00
8.00 Supply & installation of Subsea Material for 18" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
9.00 Supply & installation of Subsea Material for 20" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
10.00 Supply & installation of Subsea Material for 22" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
11.00 Supply & installation of Subsea Material for 24" Line Pipes
a) Subsea WN Flange No. 4 0.00
b) Subsea Swivel Flange No. 4 0.00
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 0.00
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 0.00
e) Subsea Piggable wye TEE No. 1 0.00
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 0.00
Subtotal for B) 0.00
Notes for A & B above: 1) The above material is to be NACE 2) The above material should meet the FS provided along wth the Bid 3) The quantity mentioned above is indicative. 4) The above unit rates incudes cost for survey, procurment, fabircation, inspection, transportation, installation & Pre-Commissioning and Commissioning (If required) 5)The unit rate mentioned shall also inclusive of all cost including cost of materials, equipment, providing all labor, services, inspections, input required for procurement, cost of all activities specified to be carried out at the contractor’s/sub-contractor’s yard {viz. fabrication, erection/assembly, all transportation upto onshore/offshore installation sites, weather risk, in –transit insurance from vendor’s/ sub- contractor’s works to the contractor’s yard /offshore installation site and landing charges, if any, at the port of destination. The above cost will also include all associated cost incidental to delivery of materials to the offshore site including all taxes and duties except GST ,BCD & Mob- Demob.
Total {I.A(i) b)} 0.00
TABLE-I PART C - MISCELLANEOUS COSTS
S.no. Other Costs Estimated qty Unit All inclusive Unit Rate excl GST Total Rate for Estimate Quantity
i) Riser Demolition(S.DEMR) 152 per riser 0.00
ii) Design Engineering Pipeline segment(S.DESP) 147 per segment Error
iii) Design Engineering Risers(S.DESP) 230 per riser Error
iv) New riser protectors / new barge bumpers / per Tonne basis 200 Per Tonne 0.00
v) Subsea Mudmats/Skids including Piling (including Piling) 100 Per Tonne 0.00
vi) Burial (4" to 10") 1000 Per mtr 0.00
vii) Burial (12" to 18") 1000 Per mtr 0.00
viii) Burial (20" to 24") 1000 Per mtr 0.00
ix) Flush Burial (4" to 10") 1000 Per mtr 0.00
x) Flush Burial (12" to 18") 1000 Per mtr 0.00
xi) Flush Burial (20" to 24") 1000 Per mtr 0.00
xii) Dredging (4" to 10") 1000 Per mtr 0.00
xiii) Dredging (12" to 18") 1000 Per mtr 0.00
xiv) Dredging (20" to 24") 1000 Per mtr 0.00
xv) Jacket Strengtheing- Steel 50 Per Tonne 0.00
xvi) Jacket Strengthening - Grout 200 Per Cubic Meter 0.00
Total of Other Costs{I.A(i) c)} 0.00
1 Above rates are all inclusive UNIT RATES including material + services cost excl GST and customs duty.
2 Total Value of {Design Engineering Pipeline segment(S.DESP) + Design Engineering Risers(S.DESP)} cannot be more than 2% of I.A minus (S.DESP+I.A(iii))
3 Unit Rate for items iv) to xvi)includes cost for engineering, procurement, fabrication, transportation, installation, etc. so as to complete the item wise activity.
Sr. No Marine Spread Mobilisation/Demobilisation** (one Mobilisation and corresponding Demobilisation will be taken as one unit) No. For Mob/Demob during schedule completion period Unit rate Quoted Price
I.A (ii) a. Survey Spread 5.00 0.00
b. Dive Survey Spread 5.00 0.00
c. Riser Installation Barge Spread 5.00 0.00
d. Saturation Diving Spread (DP Vessel) for diving Works e.g. for Riser Clamp Installation/ Free Span Correction/Crossings Installation / Sub-sea Tie-in of preinstalled risers. 5.00 0.00
e. Transportation Spread (Cargo Barge + Tow Tug). 5.00 0.00
f. Pipe lay Barge Spread 5.00 0.00
g. Hydro test Spread 5.00 0.00
h. Flush Burial Spread 5.00 0.00
Sub Total I.A (ii) 0.00
** This is Rate Contract. Individual mob & demob rates quoted in Table IA(ii) above is part of the bid evaluation and same shall also be referred for calculating the applicable Rate for mob & demob , if any, with reference to the original scope of work.
Notes for I.A(ii): Above each Marine Spread rate is inclusive of towing/anchor handlings, Work boats, material barge, manpower, etc as required to perform the intended work by that marine spread.
Sr. No ( Column1) Marine Spread Proposed to be deployed by the contractor** ( Column 2) Estimated no of days for loading of bids ( Column 3) Unit rate ( Column 4) Quoted Price ( Column 5 )
I.A (iii) a. Survey Spread 45 0.00
b. Dive Survey Spread 45 0.00
c. Riser Installation Barge Spread 45 0.00
d. Saturation Diving Spread (DP Vessel) for diving Works e.g. for Riser Clamp Installation/ Free Span Correction/Crossings Installation / Sub-sea Tie-in of preinstalled risers. 45 0.00
e. Transportation Spread (Cargo Barge + Tow Tug). 45 0.00
f. Pipe lay Barge Spread 45 0.00
g. Pigging & Hydro test Spread 45 0.00
h. Flush Burial Spread 45 0.00
Sub Total (iii) 0.00
Day rate for extended standby shall be based on vessel laid-up with all equipment used for work but only a care and maintenance (skeleton) crew and in no case can be more than what is quoted in column 4 above.
Notes for item iii
1 Mobilization / demobilization charges of above spreads shall be included in total price I.A.
2 Adjustment shall be computed, wherever applicable on pro-rata basis for actual time.
3 All spreads shall be inclusive of towing/Anchor handling tugs, work boats, supply boats, material barge, man power etc. as required.
4 The number of days indicated in column 3 in table Sl IA (iii) above, is an internal assessment of the company for the limited purpose of loading of bids for evaluation. These numbers of days are in no way to be taken for any purpose other than that as specified here.
5 The day rate quoted above shall be inclusive of all costs, taxes and duties including GST.
6 Contractor is to mention day rates for all the items mentioned above in Column 4 individually.
7 For admission of this cost, refer to Special conditions of the Contract.
8 Above each Marine Spread rate is inclusive of towing/anchor handlings. Work boats, material barge, manpower, etc as required to perform the intended work by that marine spread.
Table-II - COST CALCULATION EXCLUDING CUSTOM DUTIES & GST
Segment wise Details Survey Survey Transportation & Installation Pre- Commissioning Cost for Effort Charges for Set-up of pipe-lay of each Segment Total Cost
Sl.No. Nom. Dia. in Inches No of segments for FBE coated Pipe No of segments for Non FBE & LE coated Pipe /OFC/Umbilical Total Segments Indicative FB Coated Pipe length for Robotic arm welding, km. (l) Pipeline with FBE Sleeve coating(S.INSP Indicative Non FB & LE Pipe length,/OFC/Umbilical km. (l) Total Length No. of Risers/ I-J tube No. of risers to be removed Nos. of Crossing Nos. of Free Span No of SPRU Pre-Comm Required Rigid Pipeline(S.SURP) Riser(S.SURP) Pipeline with Robotic arm FBE coating(S.INSP) Pipeline with FBE Sleeve coating(S.INSP) Pipeline without Robotic arm LE/NO coating/OFC installation/ Umbilical Installation (S.INSP) Riser(S.INSRI) Freespan(S.FREE) Crossing(S.CROSS) SPRU Precommissioning(S.PRE) Effort(S.EFFORT)
Note: 1) The line segments, along with their respective sizes, lengths,etc. as detailed above, represent the indicative scope of work considered for evaluation of bids across five seasons. These quantities are used solely for arriving at comparative Price Evaluation during the bidding process. However, the actual scope of work—as identified and finalized by Company shall be communicated to the successful bidder well in advance for the commencement of each seasonal activities along with the priority list of segments.
I. COST REIMBURSABLE ADDITIONAL ITEMS: (COST PLUS PERCENTAGE)
1. Percentage fee applicable to equipment subcontracts for extra work. 7.50%
2. Percentage fee applicable for supply of corrosion inhibitor 7.50%
3 Percentage of fee applicable Shutdown valves, Flow tee, Spectacle Blind,Umbilicals, SPRU,OFC etc. 7.50%
4 Percentage fee applicable to equipment, material & Services of subcontracts for sub sea Hot tapping work. (excluding sub-sea tie in activity) 7.50%
Notes for item I:
I. The above percentage will also be used by the Company to order bought-out items and extra equipment not included in the Bidding Documents.
II. In respect of item 1 above, the percentage shall be applicable on CIF price (Offshore supply base/Contractors yard) for imported items / For Destination (Offshore supply base/contractors yard price) for indigenous items. However, the same shall not be applicable on duties & taxes.
III. Bidders to raise invoices for material and services separately.
II. CUSTOMS DUTY (BCD):
Bidder shall furnish break-up of the amount included in the price towards meeting his obligation as per clause 3.4.1.3 & 3.4.1.4 of General Conditions of Contract pertaining to Customs Duty.
Currency of Quote 0
ITEM (1) Laws/Acts/Rules/regulations reference (2) Tariff indicating rate of tax/duty/fee/charge/levy (3) Amount indicating currency/ currencies (4)
A) Marine Spread (as per Table-I Part C of Appendix A-3)
i. Survey Spread
ii. Dive Survey Spread
iii. Riser Installation Barge Spread
iv. Saturation Diving Spread ( DP Vessel) for diving Works e.g. for Riser Clamp Installation/ Free Span Correction/Crossings Installation / Sub-sea Tie-in of preinstalled riser/ PLEM
v. Pipe lay Barge Spread
vi. Transportation Spread (Cargo Barge + Tow Tug)
vii. Hydro test Spread
viii. Flush Burial Spread
B) Bidder’s Constructional Plant (other than “a” above), Tools & tackles, consumables etc. likely to be imported into India with the undertaking to re-export (less quantities actually consumed in execution of Works)
Total amount A (i) to B 0
NOTES FOR ITEM II :
1 The break-up furnished above form the basis for adjustment in terms of clauses 7.6 (Change in Law) of General Conditions of Contract so far as it pertains to Customs Duty.
2 Bidder agrees that in case the Custom Duty actually levied/imposed on the above mentioned Marine Spread and Bidder’s material consumables after deducting the admissible duty drawback/exemption is less that the amount(s) indicated above, then Company shall recover the difference between the net Custom Duty levied/Imposed, after taking into account the admissible duty drawback and the amount(s) indicated by the Bidder.
Bidder to refer customs notification no. 50/2017 (including Sl no 557B) dated 30.06.2017 and 72/2017 dated 16.08.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022, 23/2008-Cus. Dated 01.03.2008 (As amended from time to time) of Govt. of India and all other amendments in the Act. Company shall reimburse custom duty on account of change in law against documentary evidence as per provisions of the contract in clause 3.4 subject to clause 7.6 of GCC. Bidder to also refer ITB clause 10.11 in this regard.
Company shall bear the additional custom duty only if it becomes payable in terms of provisions of clause 7.6 of General Conditions of Contract.
3 Bidder shall indicate the details of Customs Law reference and Tariff indicating rate of customs under column (2) and (3) respectively in the un-priced bid also.
4 The total amount quoted above shall be auto-populated in lump sum price I-B(ii) of custom duty.
5 Change in law shall be applicable only in case of variation of rate of taxes and duties on supply of services to ONGC and not applicable on taxes and duties on input (Goods and Services), in line with clause 7.6.6 of GCC.
6 Change in law shall not be applicable to taxes and duties in respect of subcontractors, vendors etc. of contractors.
III. CHANGE IN LAWS AND REGULATIONS (Refer clause 3.4 of GCC of tender Documents)
Laws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the Bidder while estimating the incidence of taxes, duties, fees, charges, levies etc. included in the Bidder's prices for the Works (as quoted in the Appendix A-3, I.B.(i) & (iii) and I.C.) as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment of Contract Price in the event of change of Law in terms of Clause 7.6 of General Conditions of Contract are as under:
ITEM Bidding Documents Clause Reference Tax Laws reference Tariff indicating rate of duty Amount included in the Price at I.D
1 Customs duty on “imported material/ equipment/items” 3.4.1.1
2 Customs duty (CD)-on As Built Documents 3.4.1.4
1 Bidders to go through Clause 7.6 of General Conditions of Contract carefully, while furnishing the above table. Strike out the items which are not applicable or write `not applicable’.
2 The GST shown above shall be auto-populated in price – I.C. and BCD in I.B.(i) & (iii)
3 Bidder shall indicate the details of Laws/Acts/Rules/regulations reference and tariff indicating rate of tax/duty/fee/charge/levy column 3 and 4 respectively in the un-priced bid also.
4 Bidder to also refer Customs notification No. 50/2017 (including Sl no 557B) dated 30.06.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time) and GST Rate notification 3/2017 under GST Act. Bidder to also refer any another relevant notifications and its amendments till date issued under Customs Act and GST Act.
5 Change in law shall not be applicable to taxes and duties in respect of subcontractors, vendors etc of contractors.
6 Changes in law shall be applicable only in case of variation in rate of taxes and duties on supply of services to ONGC and not applicable on taxes and duties on input (goods and services), in line with clause no 7.6.6 of GCC.
IV. Disclosure for availing Deemed Export Benefit for domestic materials and Concessional custom duty for import of materials:
Bidder shall disclose the following:
Sl. No. ITEM Amount ( Currency to be mentioned by the Bidder)
1 Value of domestic materials for which Bidder intend to avail Deemed Export Benefit / GST at concessional rates.
2 CIF Value of Imported materials for which Bidder intend to avail Concessional rate of Customs Duty / GST.
1 The total value of domestic materials and imported materials at above table shall be restricted to the quoted price as per I.A.
2 Bidder is allowed to change the indicated amount shown above during the execution based on detailed engineering but the sum of value of goods on which concessional Customs duties and GST is leviable shall be restricted to the sum of quoted price at table I.A.
3 For items under clause 3.4 of Part - II GCC, Certificate and/or Undertaking shall be issued by Company for items covered under list 33 of Notification 50/2017-Cus (including Sl no 557B) as amended by Notification 02/2022-Cus.
4 For items under clause 3.6 of Part - II GCC, PAC as per Deemed Export Policy and recommendatory letter for obtaining EC from DGH shall be issued by Company.
5 Bidder shall refer Customs notification No. 50/2017 (including Sl no 557B) dated 30.06.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time) and GST Rate notification 3/2017 under GST Act. Bidder shall also refer any another relevant notifications and its amendments till date issued under Customs Act and GST Act.
Adjustment and Non Adjustment Items of Structural Steel
Items under Adjustment Items Not under Adjustment
Aids for fabrication, Transportation & Installation
A) Deck extension at Existing platforms(as listed in Basic bid work, Vol-II : 1. Lifting accessories including trunnions lifting eyes, slings, shackles, sister plates, spreader bars/ frames etc.
1. Addition of Primary Beams, 2. Rigging platforms
2. Addition of secondary Beams, 3. Temporary Members
3. Addition of any knee braces for Extension. 4. Sea fastening/ Tie-down members
B) New riser protectors /new barge bumpers / per Tonne basis , 5. All kinds of bumpers, guides required for fabrication and installation
6. Nuts Bolts/ fasteners
7. Floor platings
10. Plates, stiffener, ring stiffeners, gusset, doubler plate etc. for Extension.
11. Wall Sheeting/ cladding
12. Roof sheeting /cladding
VI. Rental Rate Schedule
(Company has furnished Rate Sheet and Fee Schedules in accordance with Clause 11.2 (d) of Part I – Instructions to Bidders and Clause 8.1 & 8.2.3 of Part II – General Conditions of Contract)
1 Rental Rate Schedule shall be as per day basis, if required same shall be calculated on pro rata basis. Rental rate schedule is attached at Annexure 1, 2 and 3.
Rental Rate Schedule of Appendix A-3 Schedule of Rates
(a) Rental rate schedule
A) Equipment: Day Rates (INR)
1 Air Compressors:
2 Generator Sets:
3 Nitrogen Generator 14,315
4 Hydraulic Jack 50T & Pump 10,581
Hydraulic Jack 25T & Pump 8,092
5 Welding Machines:
Diesel upto 400A 5,601
Electric 300-600 A 1,493
6 Cutting and Burning Outfits:
Multi head Plate Cutting Torch 1,743
7 Miscellaneous :
Punch machine 1,245
Pipe cut off. machine 1,805
UT machine 5,228
Fitter tool box 934
Welder tool box 1,245
B) TOOLS AND MISCELLANEOUS :
High Pressure 10,892
Centrifugal 13,693
Scaffolding Pipe 33
Scaffolding wooden plank 43
Scaffolding Clamp 18
11 Sand blasting & Painting 15,810
With Air Compressor (excluding sand and/or paint)
Chain Block 10T 374
Chain Block 20 T 1,058
The rates are inclusive of Percentage fee.
Description Day Rates (INR)
Worker/Technician/welder/operator etc. 1820
Supervisor 6209
The rates are inclusive of Percentage fee.
Rates of Engineering Deliverables:
Engineering Deliverable Price in INR
Drawings 86,076.00
Local Analysis of Deck 232,962.00
Calculations 106,739.00
Purchase Specifications 421,388.00
report 119,693.00
Data Sheet 93,784.00
Loop Diag 46,892.00
Control Architecture 179,539.00
a. Engineer per day 12,954.00
b. Draftsman per day 10,492.00
c. Senior Engineer per day 15,738.00
The rates are inclusive of Percentage fee. However, all above rates are exclusive of GST. For Annexure-3 above, please note that site survey rates are on per day basis whereas for others it is based on number of engineering deliverables.
Pipeline Unit rates
Pipeline Segment Nom. Dia. in Inches Approx. length, km. (l) Design Engineering Survey Procurement of Coated Line Pipe/ Flexible Transportation from coating yard to offshore Installation Hook-Up with existing facilities/Testing/Pre- Commissioning and Commissioning
NON NACE NACE Flexible
Pipelines including Risers Pipelines including Risers Internally coated (liquid epoxy) Internally coated (FBE with robotic arm) Not internally coated Pipeline Flexibles Riser Freespan Crossing Pipelines including Risers
Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per m Unit rate per freespan Unit rate per crossing Unit rate per m
Pipeline Laying Project (PLP)
Name of Bidder:
SL. NO. SHEET NAME DESCRIPTION
1 A-3 I.A, I.B, I.C & I.D CURRENCYWISE CALCULATION OF TOTAL PRICE
2 A-3 TABLE-I PART A PIPELINE LAYING PRICE
3 A-3 TABLE-I PART B SUBSEA ITEMS PRICE
4 A-3 TABLE-I PART C MISCELLANEOUS PRICE, MOB-DEMOB CHARGES & MARINE SPREAD FOR LOADING OF BIDS.
5 A-3 TABLE-II PRICE CALCULATION EXCLUDING MOB-DEMOB, SUBSEA ITEMS COST, CUSTOM DUTIES & GST
6 A-3 PART D ADDITIONAL ITEMS IN A-3
1 Do not change the name of any excel file as formulas under A3 and A10 are interlinked.
2 Bidders need to fill data in applicable yellow tabs only. Bidder are not to temper with any tab.
3 The price indicated at I.A shall be currency-wise price, derived from calculations in Table-II and based on the rates quoted by the bidders in Table-I-Part A , Table-I-Part B and Table-I-Part C. Bidder shall submit separate excel file for each currency. This shall be subject to provisions laid out in ITB Cl.13 and Note 10 in Sheet A-3 I.A,I.B,I.C & I.D
Pipeline Laying Project (PLP)
Currency of Quote Quoted
I.A. TOTAL PRICE
Sl. No. Item (a) Unit rate (per MT) (b) Weight in MT (c) AMOUNT (d)
I.A(i) a) Total of Segment Prices under A-3 TABLE-II Not Applicable Not Applicable Quoted
b) SOR for Subsea items under A-3 TABLE-I Part B Not Applicable Not Applicable Quoted
c) Total of Other Items Under A-3 TABLE-I Partc C Not Applicable Not Applicable Quoted
I.A(ii) Total Price of Marine Spread Mobilisation/Demobilisation underA-3 TABLE-I PART C Not Applicable Not Applicable Quoted
I.A(iii) Total price for "Marine Spread Proposed to be deployed by the contractor" under A-3 TABLE-I PART C Not Applicable Not Applicable Quoted
Sub total I.A=I.A(i) + I.A(ii)+ I.A(III) Quoted
I.B. CUSTOMS DUTY (Basic Customs Duty)
Sl. No. ITEM AMOUNT
I.B i) Customs duty on “imported materials/equipment/items” under A-3 PART D as per Clause 3.4.1.1 of GCC Quoted
ii) Custom duty on “Constructional Plant and equipment” A-3 PART D as per Clause 3.4.1.3 of GCC Quoted
iii) Custom duty on “As built Documents” A-3 PART D as per Clause 3.4.1.4 of GCC Quoted
Sub Total I.B. [I.B.(i) + I.B.(ii) + I.B.(iii)] Quoted
I.C. GST as applicable on {I.A(i) + I.A(ii) + I.B} Quoted
I.D. Total price for execution of the indicative scope of work as detailed in Bid Document (I.A. + I.B. + I.C.)- I.A(III) Quoted
I.E. Price Including I.A (iii) (Marine Spread Proposed to be deployed by the contractor) for arriving at Evaluated Pice (I.D + I.A (iii)) Quoted
Percentage of Local Content (LC) as per the PPP-MII policy in the bid of ____________ (name of bidder) is ______ %. Quoted
% of Local Content [prices for goods, works, or services (including Indian Agent Commission and GST amount) sourced in India] {For Foreign Bidders} Quoted
% of Import Content {For Indian Bidders} Quoted
1 Bidder shall fill out details in cells highlighted in yellow in tabs 'A-3 I.A, I.B,I.C &I.D' ,'A-3 Table-I Part A''A-3 Table-I Part B''A-3 Table-I Part C'&'A-3 Table-I Part D'.
2 The price indicated at I.A shall be currency-wise cost, derived from calculations in Table-II based on the rates quoted by the bidders in Table-I-Part A , Table-I-Part B and Table-I-Part C. Bidder shall submit separate excel file for each currency. This shall be subject to provisions laid out in ITB Cl.13 and Note 10 in Sheet A-3 I.A,I.B,I.C & I.D
3 Bidder to note that price at I.A.(i) will be auto computed based on bidder's unit rates' quotes (in highlighted cells) from tabs 'A-3 Table-I Part A' 'Part B'' & 'Part C'
5 Bidder to note that price at I.A.(ii) will be auto computed based on bidder's mob-demob charges (in highlighted cells) from tabs 'A-3 Table-I Part C'.
6 Bidder to note that price at I.B. and I.C. will be auto computed based on bidder's rates' quotes (in highlighted cells) from tabs 'A-3 Table-I Part D'.
7 The price indicated at I.D for all different currency(which will be created in different file) will be summed up for calculations and arriving at the total rate contract price.
8 Bidder to note that Prie at I.E. will be autocomputed based on Total price I.D. and I.A (iii) (Marine Spread Proposed to be deployed by the contractor) for arriving at Evaluated Pice
9 Total price quoted by the bidder shall be inclusive of all cost, taxes & duties inter alia, insurance.
10 The Bidders are to quote firm prices. Foreign bidders can quote the price and receive payments either in Indian Rupees or US Dollars or Euros or Pound Sterling or Yen or other relevant currencies, or a combination thereof. However, prices for goods, works, or services (including Indian Agent Commission) sourced in India must be quoted and shall be paid by ONGC only in Indian Rupees to the extent of their Local Content indicated in the bid. In all cases, Indian Agent commission shall be paid in INR only. Indian bidders are required to quote in INR only, however Indian bidders can quote and receive payment in foreign currency to the extent of their import content indicated in the bid. The freight and insurance elements must be quoted by Indian bidders in Indian Rupees only and payment will be made accordingly. The payment towards GST will be made by ONGC in Indian Rupees as per actuals, irrespective of Indian or Foreign bidder. For this purpose, the amount of GST paid as per the invoice signed by the officer duly authorized for this purpose will be taken into account. Currency once quoted will not be allowed to be changed.
TABLE-I PART A - PIPELINE LAYING COSTS
Sl. No. Dia. in Inches Survey (S.SURP) Transportation & Installation Precommissioning Fixed Effort Charges for Set-up of pipe-lay of each Segment
Pipeline/OFC/Umbilical Riser
Pipeline with Robotic arm FBE coating (S.INSP) Pipeline with FBE Sleeve coating(S.INSP) Pipeline without Robotic arm LE/NO coating/OFC installation/ Umbilical Installation (S.INSP) Riser(S.INSRI) Freespan(S.FREE) Crossing(S.CROSS) SPRU (S.SPRU) Precommissioning(S.PRE) Effort(S.EFFORT)
Unit rate per m Unit rate per riser Unit rate per m Unit rate per m Unit rate per m Unit rate per riser Unit rate per freespan Unit rate per crossing Unit rate per no. Unit rate per m Unit rate per segment
1 2"(piggy back) Quoted Quoted Quoted Quoted Quoted Quoted NA
2 4" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
3 6" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
4 8" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
5 10" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
6 12" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
7 14" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
8 16" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
9 18" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
10 20" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
11 22" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
12 24" Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
13 OFC (Piggy Back) Quoted Quoted Quoted Quoted Quoted NA
14 Umbilical Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
Notes For sub marine pipelines:
1 All rates are excluding mob-demob, GST & Custom duty
2 Bidder has to quote for the submarine pipeline segments as per indicative scope of work as described in the Bid document considering the following notes also:
3 Bidder to note that unit rates against each line size shall be quoted for Pipeline with and without Robotic arm FBE coating. The above rate should include all consummables, required materials to complete the scope of work as per bid except the items indicated at A-3 TABLE-I PART B and FIMs to be issued by Company as per Scope of work.
4 The price of activities shall be calculated in Table II by using the unit rates of activities quoted by Bidder in Table-I Part A of A-3.
5 The length of pipes mentioned in Table II is indicative only, the length shall be firmed up during detailed engineering for the scope as per actual pipeline route survey.
6 Riser length is considered as 100 m at ends of each segment. Unit price of riser - Installation shall include cost for additional support members (needed to be installed on the jacket) for installation of riser and I/J Tube clamps at existing platforms as per the Bidding Documents and design requirement. There shall be no Adjustment on account of Changes inRiser length.
7 There shall be no Adjustment on account of clamps (hanger, fixed or adjustable) for risers and I/J Tubes. Unit rates included for riser related activities shall account for these items.
8 "Transportation & Installation" unit rate mentioned at Table –I part A shall also include internal coating inlcuding sleeves for FBE & LE (wherever applicable) as per details given in the bidding documents.
9 The unit rate mentioned at Table-I part A shall also include the cost of materials, equipment, providing all labor, services, inspections, input required for procurement, cost of all activities specified to be carried out at the contractor’s/sub-contractor’s yard {viz. fabrication, erection/assembly, all transportation upto onshore/offshore installation sites, weather risk, in –transit insurance from vendor’s/ sub- contractor’s works to the contractor’s yard /offshore installation site and landing charges, if any, at the port of destination. The above cost will also include all associated cost incidental to delivery of materials to the offshore site including all taxes and duties except GST ,BCD & Mob- Demob.
10 Survey unit rates in Table-I Part A shall include complete Pipeline & Riser/ I/J tube system and related facilities as per detail given in the bidding documents.
11 Riser Installation cost shall also include cost for Design, fabrication, Transportation & installation of Riser clamps etc for completing installation of riser activity. However it is to be noted that seperate cost for Riser demolition per riser basis and Cost for new riser protectors / new barge bumpers per Tonne basis are considered under Table-I Part C.
12 For the purpose of pipeline quantity variation, the riser length shall include zone-2(12.2 m horizontal length from the bottom end of the riser bend) and not to be considered as part of pipeline length for adjustment purpose.
13 Fixed Effort Charges for Set-up of pipe-lay of each Segment. Contractor has to quote against one segment i.e. 4" Pipeline for effort charges and the same rate will be populated for other segments except piggy back line
14 Survey Cost S.SURP cannot be more than 3% of the total price of each line item in A-3 Table II
Item Rate Schedule-SOR for Subsea items
Pipeline Laying Project (PLP)
Sr No Description Unit Quantity Unit Rate inclusive of all applicable taxes & duties except GST Total amount inclusive of all applicable taxes & duties except GST
Currency______QUOTED Currency_____QUOTED
A Subsea Items SOR for 1500 Class
1.00 Supply & Installation of Subsea items for 4" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
2.00 Supply & installation of Subsea Material for 6" Line Pipes
a) Subsea WN Flange No. 8 Quoted Quoted
b) Subsea Swivel Flange No. 8 Quoted Quoted
c) Subsea Ball Valve (Full bore) with blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 8 Quoted Quoted
3.00 Supply & installation of Subsea Material for 8" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
4.00 Supply & installation of Subsea Material for 10" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
5.00 Supply & installation of Subsea Material for 12" Line Pipes
a) Subsea WN Flange No. 8 Quoted Quoted
b) Subsea Swivel Flange No. 8 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 8 Quoted Quoted
6.00 Supply & installation of Subsea Material for 14" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
7.00 Supply & installation of Subsea Material for 16" Line Pipes
a) Subsea WN Flange No. 8 Quoted Quoted
b) Subsea Swivel Flange No. 8 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 8 Quoted Quoted
8.00 Supply & installation of Subsea Material for 18" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
9.00 Supply & installation of Subsea Material for 20" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
10.00 Supply & installation of Subsea Material for 22" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
11.00 Supply & installation of Subsea Material for 24" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
Sub Total for A Quoted
Sr No Description Unit Quantity Unit Rate inclusive of all applicable taxes & duties except GST Total amount inclusive of all applicable taxes & duties except GST
Currency__QUOTED Currency__QUOTED
B Subsea Items SOR for 900 Class
1.00 Supply & Installation of Subsea items for 4" Line Pipes
a) Subsea WN Flange No. 12 Quoted Quoted
b) Subsea Swivel Flange No. 12 Quoted Quoted
c) Subsea Ball Valve (Full bore) with blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 12 Quoted Quoted
2.00 Supply & installation of Subsea Material for 6" Line Pipes
a) Subsea WN Flange No. 32 Quoted Quoted
b) Subsea Swivel Flange No. 32 Quoted Quoted
c) Subsea Ball Valve (Full bore) with blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 32 Quoted Quoted
3.00 Supply & installation of Subsea Material for 8" Line Pipes
a) Subsea WN Flange No. 24 Quoted Quoted
b) Subsea Swivel Flange No. 24 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 24 Quoted Quoted
4.00 Supply & installation of Subsea Material for 10" Line Pipes
a) Subsea WN Flange No. 40 Quoted Quoted
b) Subsea Swivel Flange No. 40 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 10 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 10 Quoted Quoted
e) Subsea Piggable wye TEE No. 10 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 40 Quoted Quoted
5.00 Supply & installation of Subsea Material for 12" Line Pipes
a) Subsea WN Flange No. 76 Quoted Quoted
b) Subsea Swivel Flange No. 76 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 10 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 10 Quoted Quoted
e) Subsea Piggable wye TEE No. 10 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 76 Quoted Quoted
6.00 Supply & installation of Subsea Material for 14" Line Pipes
a) Subsea WN Flange No. 32 Quoted Quoted
b) Subsea Swivel Flange No. 32 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 4 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 4 Quoted Quoted
e) Subsea Piggable wye TEE No. 4 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 32 Quoted Quoted
7.00 Supply & installation of Subsea Material for 16" Line Pipes
a) Subsea WN Flange No. 32 Quoted Quoted
b) Subsea Swivel Flange No. 32 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 32 Quoted Quoted
8.00 Supply & installation of Subsea Material for 18" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
9.00 Supply & installation of Subsea Material for 20" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
10.00 Supply & installation of Subsea Material for 22" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
11.00 Supply & installation of Subsea Material for 24" Line Pipes
a) Subsea WN Flange No. 4 Quoted Quoted
b) Subsea Swivel Flange No. 4 Quoted Quoted
c) Subsea Ball Valve (Full bore) with actuator, blind, gasket, studs etc No. 1 Quoted Quoted
d) Flow TEE with companion flanges, studs, gaskets etc. No. 1 Quoted Quoted
e) Subsea Piggable wye TEE No. 1 Quoted Quoted
f) Associated subsea Bulk Item ( KAMOS gasket or equavalent gasket, fastners etc.) Set 4 Quoted Quoted
Subtotal for B) Quoted
Notes for A & B above: 1) The above material is to be NACE 2) The above material should meet the FS provided along wth the Bid 3) The quantity mentioned above is indicative. 4) The above unit rates incudes cost for survey, procurment, fabircation, inspection, transportation, installation & Pre-Commissioning and Commissioning (If required) 5)The unit rate mentioned shall also inclusive of all cost including cost of materials, equipment, providing all labor, services, inspections, input required for procurement, cost of all activities specified to be carried out at the contractor’s/sub-contractor’s yard {viz. fabrication, erection/assembly, all transportation upto onshore/offshore installation sites, weather risk, in –transit insurance from vendor’s/ sub- contractor’s works to the contractor’s yard /offshore installation site and landing charges, if any, at the port of destination. The above cost will also include all associated cost incidental to delivery of materials to the offshore site including all taxes and duties except GST ,BCD & Mob- Demob.
Total {I.A(i) b)} #VALUE!
TABLE-I PART C - MISCELLANEOUS COSTS
S.no. Other Costs Estimated qty Unit All inclusive Unit Rate excl GST Total Rate for Estimate Quantity
i) Riser Demolition(S.DEMR) 152 per riser Quoted Quoted
ii) Design Engineering Pipeline segment(S.DESP) 147 per segment Quoted Quoted
iii) Design Engineering Risers(S.DESP) 230 per riser Quoted Quoted
iv) New riser protectors / new barge bumpers / per Tonne basis 200 Per Tonne Quoted Quoted
v) Subsea Mudmats/Skids including Piling (including Piling) 100 Per Tonne Quoted Quoted
vi) Burial (4" to 10") 1000 Per mtr Quoted Quoted
vii) Burial (12" to 18") 1000 Per mtr Quoted Quoted
viii) Burial (20" to 24") 1000 Per mtr Quoted Quoted
ix) Flush Burial (4" to 10") 1000 Per mtr Quoted Quoted
x) Flush Burial (12" to 18") 1000 Per mtr Quoted Quoted
xi) Flush Burial (20" to 24") 1000 Per mtr Quoted Quoted
xii) Dredging (4" to 10") 1000 Per mtr Quoted Quoted
xiii) Dredging (12" to 18") 1000 Per mtr Quoted Quoted
xiv) Dredging (20" to 24") 1000 Per mtr Quoted Quoted
xv) Jacket Strengtheing- Steel 50 Per Tonne Quoted Quoted
xvi) Jacket Strengthening - Grout 200 Per Cubic Meter Quoted Quoted
Total of Other Costs{I.A(i) c)} Quoted
1 Above rates are all inclusive UNIT RATES including material + services cost excl GST and customs duty.
2 Total Value of {Design Engineering Pipeline segment(S.DESP) + Design Engineering Risers(S.DESP)} cannot be more than 2% of I.A minus (S.DESP+I.A(iii))
3 Unit Rate for items iv) to xvi)includes cost for engineering, procurement, fabrication, transportation, installation, etc. so as to complete the item wise activity.
Sr. No Marine Spread Mobilisation/Demobilisation** (one Mobilisation and corresponding Demobilisation will be taken as one unit) No. For Mob/Demob during schedule completion period Unit rate Quoted Price
I.A (ii) a. Survey Spread 5.00 Quoted Quoted
b. Dive Survey Spread 5.00 Quoted Quoted
c. Riser Installation Barge Spread 5.00 Quoted Quoted
d. Saturation Diving Spread (DP Vessel) for diving Works e.g. for Riser Clamp Installation/ Free Span Correction/Crossings Installation / Sub-sea Tie-in of preinstalled risers. 5.00 Quoted Quoted
e. Transportation Spread (Cargo Barge + Tow Tug). 5.00 Quoted Quoted
f. Pipe lay Barge Spread 5.00 Quoted Quoted
g. Hydro test Spread 5.00 Quoted Quoted
h. Flush Burial Spread 5.00 Quoted Quoted
Sub Total I.A (ii) Quoted
** This is Rate Contract. Individual mob & demob rates quoted in Table IA(ii) above is part of the bid evaluation and same shall also be referred for calculating the applicable Rate for mob & demob , if any, with reference to the original scope of work.
Notes for I.A(ii): Above each Marine Spread rate is inclusive of towing/anchor handlings, Work boats, material barge, manpower, etc as required to perform the intended work by that marine spread.
Sr. No ( Column1) Marine Spread Proposed to be deployed by the contractor** ( Column 2) Estimated no of days for loading of bids ( Column 3) Unit rate ( Column 4) Quoted Price ( Column 5 )
I.A (iii) a. Survey Spread 45 Quoted Quoted
b. Dive Survey Spread 45 Quoted Quoted
c. Riser Installation Barge Spread 45 Quoted Quoted
d. Saturation Diving Spread (DP Vessel) for diving Works e.g. for Riser Clamp Installation/ Free Span Correction/Crossings Installation / Sub-sea Tie-in of preinstalled risers. 45 Quoted Quoted
e. Transportation Spread (Cargo Barge + Tow Tug). 45 Quoted Quoted
f. Pipe lay Barge Spread 45 Quoted Quoted
g. Pigging & Hydro test Spread 45 Quoted Quoted
h. Flush Burial Spread 45 Quoted Quoted
Sub Total (iii) Quoted
Day rate for extended standby shall be based on vessel laid-up with all equipment used for work but only a care and maintenance (skeleton) crew and in no case can be more than what is quoted in column 4 above.
Notes for item iii
1 Mobilization / demobilization charges of above spreads shall be included in total price I.A.
2 Adjustment shall be computed, wherever applicable on pro-rata basis for actual time.
3 All spreads shall be inclusive of towing/Anchor handling tugs, work boats, supply boats, material barge, man power etc. as required.
4 The number of days indicated in column 3 in table Sl IA (iii) above, is an internal assessment of the company for the limited purpose of loading of bids for evaluation. These numbers of days are in no way to be taken for any purpose other than that as specified here.
5 The day rate quoted above shall be inclusive of all costs, taxes and duties including GST.
6 Contractor is to mention day rates for all the items mentioned above in Column 4 individually.
7 For admission of this cost, refer to Special conditions of the Contract.
8 Above each Marine Spread rate is inclusive of towing/anchor handlings. Work boats, material barge, manpower, etc as required to perform the intended work by that marine spread.
Table-II - COST CALCULATION EXCLUDING CUSTOM DUTIES & GST
Segment wise Details Survey Survey Transportation & Installation Pre- Commissioning Cost for Effort Charges for Set-up of pipe-lay of each Segment Total Cost
Sl.No. Nom. Dia. in Inches No of segments for FBE coated Pipe No of segments for Non FBE & LE coated Pipe /OFC/Umbilical Total Segments Indicative FB Coated Pipe length for Robotic arm welding, km. (l) Pipeline with FBE Sleeve coating(S.INSP Indicative Non FB & LE Pipe length,/OFC/Umbilical km. (l) Total Length No. of Risers/ I-J tube No. of risers to be removed Nos. of Crossing Nos. of Free Span No of SPRU Pre-Comm Required Rigid Pipeline(S.SURP) Riser(S.SURP) Pipeline with Robotic arm FBE coating(S.INSP) Pipeline with FBE Sleeve coating(S.INSP) Pipeline without Robotic arm LE/NO coating/OFC installation/ Umbilical Installation (S.INSP) Riser(S.INSRI) Freespan(S.FREE) Crossing(S.CROSS) SPRU Precommissioning(S.PRE) Effort(S.EFFORT)
1 2"(piggy back) 0 1 1 0 0 3.8 3.80 2 0 0 0 2 Yes Rigid Quoted Quoted 0.00 0.00 Quoted Quoted 0.00 0.00 Quoted Quoted Quoted
2 4" 0 4 4 0 0 31.9 31.90 12 4 21 31 2 Yes Rigid #VALUE! #VALUE! 0.00 0.00 Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
3 6" 0 25 25 0 0 209.4 209.40 46 28 130 210 6 Yes Rigid #VALUE! #VALUE! 0.00 0.00 Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
4 8" 11 1 12 27.1 31.1 9.8 68.00 20 14 70 68 4 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
5 10" 18 2 20 85.53 31.21 2 118.74 36 28 211 117 4 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
6 12" 39 0 39 181.23 94.77 0 276.00 54 44 397 275 14 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
7 14" 13 2 15 29.6 94.7 2 126.30 18 4 133 125 8 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
8 16" 16 1 17 57.59 62.17 1 120.76 28 20 154 123 2 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
9 18" 4 1 5 2 23.2 1 26.20 8 4 27 27 2 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
10 20" 1 2 3 2 0 2 4.00 2 2 3 3 2 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
11 22" 1 2 3 2 0 2 4.00 2 2 3 3 2 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
12 24" 1 2 3 2 0 2 4.00 2 2 3 3 2 Yes Rigid Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
Subtotal 104 43 147 389.05 337.15 266.9 993.1 230 152 1152 985 50 Quoted Quoted Quoted
13 OFC (Piggy Back) 0 2 2 0 0 10 10.00 4 0 0 0 0 Yes Quoted Quoted 0.00 0.00 Quoted Quoted 0.00 0.00 0.00 Quoted Quoted
14 Umbilical 0 2 2 0 0 1 1.00 2 0 0 0 0 Yes Quoted Quoted 0.00 0.00 Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted
Total 104 47 151 389.05 337.15 277.9 1004.1 236 152 1152 985 50 Quoted Quoted 0.00 0.00 Quoted Quoted Quoted Quoted Quoted Quoted Quoted Quoted COST EXCL CUSTOMS, GST {I.A(i) a)}
Note: 1) The line segments, along with their respective sizes, lengths,etc. as detailed above, represent the indicative scope of work considered for evaluation of bids across five seasons. These quantities are used solely for arriving at comparative Price Evaluation during the bidding process. However, the actual scope of work—as identified and finalized by Company shall be communicated to the successful bidder well in advance for the commencement of each seasonal activities along with the priority list of segments.
I. COST REIMBURSABLE ADDITIONAL ITEMS: (COST PLUS PERCENTAGE)
1. Percentage fee applicable to equipment subcontracts for extra work. 7.50%
2. Percentage fee applicable for supply of corrosion inhibitor 7.50%
3 Percentage of fee applicable Shutdown valves, Flow tee, Spectacle Blind,Umbilicals, SPRU,OFC etc. 7.50%
4 Percentage fee applicable to equipment, material & Services of subcontracts for sub sea Hot tapping work. (excluding sub-sea tie in activity) 7.50%
Notes for item I:
I. The above percentage will also be used by the Company to order bought-out items and extra equipment not included in the Bidding Documents.
II. In respect of item 1 above, the percentage shall be applicable on CIF price (Offshore supply base/Contractors yard) for imported items / For Destination (Offshore supply base/contractors yard price) for indigenous items. However, the same shall not be applicable on duties & taxes.
III. Bidders to raise invoices for material and services separately.
II. CUSTOMS DUTY (BCD):
Bidder shall furnish break-up of the amount included in the price towards meeting his obligation as per clause 3.4.1.3 & 3.4.1.4 of General Conditions of Contract pertaining to Customs Duty.
Currency of Quote Quoted
ITEM (1) Laws/Acts/Rules/regulations reference (2) Tariff indicating rate of tax/duty/fee/charge/levy (3) Amount indicating currency/ currencies (4)
A) Marine Spread (as per Table-I Part C of Appendix A-3)
i. Survey Spread Quoted Quoted Quoted Quoted Quoted Quoted Quoted
ii. Dive Survey Spread Quoted Quoted Quoted Quoted Quoted Quoted Quoted
iii. Riser Installation Barge Spread Quoted Quoted Quoted Quoted Quoted Quoted Quoted
iv. Saturation Diving Spread ( DP Vessel) for diving Works e.g. for Riser Clamp Installation/ Free Span Correction/Crossings Installation / Sub-sea Tie-in of preinstalled riser/ PLEM Quoted Quoted Quoted Quoted Quoted Quoted Quoted
v. Pipe lay Barge Spread Quoted Quoted Quoted Quoted Quoted Quoted Quoted
vi. Transportation Spread (Cargo Barge + Tow Tug) Quoted Quoted Quoted Quoted Quoted Quoted Quoted
vii. Hydro test Spread Quoted Quoted Quoted Quoted Quoted Quoted Quoted
viii. Flush Burial Spread Quoted Quoted Quoted Quoted Quoted Quoted Quoted
B) Bidder’s Constructional Plant (other than “a” above), Tools & tackles, consumables etc. likely to be imported into India with the undertaking to re-export (less quantities actually consumed in execution of Works) Quoted Quoted Quoted Quoted Quoted Quoted Quoted
Total amount A (i) to B Quoted
NOTES FOR ITEM II :
1 The break-up furnished above form the basis for adjustment in terms of clauses 7.6 (Change in Law) of General Conditions of Contract so far as it pertains to Customs Duty.
2 Bidder agrees that in case the Custom Duty actually levied/imposed on the above mentioned Marine Spread and Bidder’s material consumables after deducting the admissible duty drawback/exemption is less that the amount(s) indicated above, then Company shall recover the difference between the net Custom Duty levied/Imposed, after taking into account the admissible duty drawback and the amount(s) indicated by the Bidder.
Bidder to refer customs notification no. 50/2017 (including Sl no 557B) dated 30.06.2017 and 72/2017 dated 16.08.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022, 23/2008-Cus. Dated 01.03.2008 (As amended from time to time) of Govt. of India and all other amendments in the Act. Company shall reimburse custom duty on account of change in law against documentary evidence as per provisions of the contract in clause 3.4 subject to clause 7.6 of GCC. Bidder to also refer ITB clause 10.11 in this regard.
Company shall bear the additional custom duty only if it becomes payable in terms of provisions of clause 7.6 of General Conditions of Contract.
3 Bidder shall indicate the details of Customs Law reference and Tariff indicating rate of customs under column (2) and (3) respectively in the un-priced bid also.
4 The total amount quoted above shall be auto-populated in lump sum price I-B(ii) of custom duty.
5 Change in law shall be applicable only in case of variation of rate of taxes and duties on supply of services to ONGC and not applicable on taxes and duties on input (Goods and Services), in line with clause 7.6.6 of GCC.
6 Change in law shall not be applicable to taxes and duties in respect of subcontractors, vendors etc. of contractors.
III. CHANGE IN LAWS AND REGULATIONS (Refer clause 3.4 of GCC of tender Documents)
Laws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the Bidder while estimating the incidence of taxes, duties, fees, charges, levies etc. included in the Bidder's prices for the Works (as quoted in the Appendix A-3, I.B.(i) & (iii) and I.C.) as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment of Contract Price in the event of change of Law in terms of Clause 7.6 of General Conditions of Contract are as under:
ITEM Bidding Documents Clause Reference Tax Laws reference Tariff indicating rate of duty Amount included in the Price at I.D
1 Customs duty on “imported material/ equipment/items” 3.4.1.1 Quoted Quoted Quoted
2 Customs duty (CD)-on As Built Documents 3.4.1.4 Quoted Quoted Quoted
3 GST 3.4 Quoted Quoted Quoted
1 Bidders to go through Clause 7.6 of General Conditions of Contract carefully, while furnishing the above table. Strike out the items which are not applicable or write `not applicable’.
2 The GST shown above shall be auto-populated in price – I.C. and BCD in I.B.(i) & (iii)
3 Bidder shall indicate the details of Laws/Acts/Rules/regulations reference and tariff indicating rate of tax/duty/fee/charge/levy column 3 and 4 respectively in the un-priced bid also.
4 Bidder to also refer Customs notification No. 50/2017 (including Sl no 557B) dated 30.06.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time) and GST Rate notification 3/2017 under GST Act. Bidder to also refer any another relevant notifications and its amendments till date issued under Customs Act and GST Act.
5 Change in law shall not be applicable to taxes and duties in respect of subcontractors, vendors etc of contractors.
6 Changes in law shall be applicable only in case of variation in rate of taxes and duties on supply of services to ONGC and not applicable on taxes and duties on input (goods and services), in line with clause no 7.6.6 of GCC.
IV. Disclosure for availing Deemed Export Benefit for domestic materials and Concessional custom duty for import of materials:
Bidder shall disclose the following:
Sl. No. ITEM Amount ( Currency to be mentioned by the Bidder)
1 Value of domestic materials for which Bidder intend to avail Deemed Export Benefit / GST at concessional rates. Quoted
2 CIF Value of Imported materials for which Bidder intend to avail Concessional rate of Customs Duty / GST. Quoted
1 The total value of domestic materials and imported materials at above table shall be restricted to the quoted price as per I.A.
2 Bidder is allowed to change the indicated amount shown above during the execution based on detailed engineering but the sum of value of goods on which concessional Customs duties and GST is leviable shall be restricted to the sum of quoted price at table I.A.
3 For items under clause 3.4 of Part - II GCC, Certificate and/or Undertaking shall be issued by Company for items covered under list 33 of Notification 50/2017-Cus (including Sl no 557B) as amended by Notification 02/2022-Cus.
4 For items under clause 3.6 of Part - II GCC, PAC as per Deemed Export Policy and recommendatory letter for obtaining EC from DGH shall be issued by Company.
5 Bidder shall refer Customs notification No. 50/2017 (including Sl no 557B) dated 30.06.2017 and amended vide Customs Notification No. 02/2022-Cus dated 01.02.2022 (As amended from time to time) and GST Rate notification 3/2017 under GST Act. Bidder shall also refer any another relevant notifications and its amendments till date issued under Customs Act and GST Act.
Adjustment and Non Adjustment Items of Structural Steel
Items under Adjustment Items Not under Adjustment
Aids for fabrication, Transportation & Installation
A) Deck extension at Existing platforms(as listed in Basic bid work, Vol-II : 1. Lifting accessories including trunnions lifting eyes, slings, shackles, sister plates, spreader bars/ frames etc.
1. Addition of Primary Beams, 2. Rigging platforms
2. Addition of secondary Beams, 3. Temporary Members
3. Addition of any knee braces for Extension. 4. Sea fastening/ Tie-down members
B) New riser protectors /new barge bumpers / per Tonne basis , 5. All kinds of bumpers, guides required for fabrication and installation
6. Nuts Bolts/ fasteners
7. Floor platings
10. Plates, stiffener, ring stiffeners, gusset, doubler plate etc. for Extension.
11. Wall Sheeting/ cladding
12. Roof sheeting /cladding
VI. Rental Rate Schedule
(Company has furnished Rate Sheet and Fee Schedules in accordance with Clause 11.2 (d) of Part I – Instructions to Bidders and Clause 8.1 & 8.2.3 of Part II – General Conditions of Contract)
1 Rental Rate Schedule shall be as per day basis, if required same shall be calculated on pro rata basis. Rental rate schedule is attached at Annexure 1, 2 and 3.
Rental Rate Schedule of Appendix A-3 Schedule of Rates
(a) Rental rate schedule
A) Equipment: Day Rates (INR)
1 Air Compressors:
2 Generator Sets:
3 Nitrogen Generator 14,315
4 Hydraulic Jack 50T & Pump 10,581
Hydraulic Jack 25T & Pump 8,092
5 Welding Machines:
Diesel upto 400A 5,601
Electric 300-600 A 1,493
6 Cutting and Burning Outfits:
Multi head Plate Cutting Torch 1,743
7 Miscellaneous :
Punch machine 1,245
Pipe cut off. machine 1,805
UT machine 5,228
Fitter tool box 934
Welder tool box 1,245
B) TOOLS AND MISCELLANEOUS :
High Pressure 10,892
Centrifugal 13,693
Scaffolding Pipe 33
Scaffolding wooden plank 43
Scaffolding Clamp 18
11 Sand blasting & Painting 15,810
With Air Compressor (excluding sand and/or paint)
Chain Block 10T 374
Chain Block 20 T 1,058
The rates are inclusive of Percentage fee.
Description Day Rates (INR)
Worker/Technician/welder/operator etc. 1820
Supervisor 6209
The rates are inclusive of Percentage fee.
Rates of Engineering Deliverables:
Engineering Deliverable Price in INR
Drawings 86,076.00
Local Analysis of Deck 232,962.00
Calculations 106,739.00
Purchase Specifications 421,388.00
report 119,693.00
Data Sheet 93,784.00
Loop Diag 46,892.00
Control Architecture 179,539.00
a. Engineer per day 12,954.00
b. Draftsman per day 10,492.00
c. Senior Engineer per day 15,738.00
The rates are inclusive of Percentage fee. However, all above rates are exclusive of GST. For Annexure-3 above, please note that site survey rates are on per day basis whereas for others it is based on number of engineering deliverables.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
AppLimitingCharges.pdf
Tender Documents • 0.38 MB
ListofAppendices.pdf
Tender Documents • 2.27 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Elect- Functional Specification_FS 4002 cp pipeline rev-9.pdf
Tender Documents • 0.13 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Elect- Functional Specification_FS 4020 Subsea Composite Cable Rev-7.pdf
Tender Documents • 0.08 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Elect- Functional Specification_FS 4043 Elect. Cables Glands Rev.0.pdf
Tender Documents • 0.04 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_FO-SPECS.docx
Tender Documents • 0.02 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_General spec_1050.pdf
Tender Documents • 0.07 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_General spec_5006.pdf
Tender Documents • 0.06 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3201 Flow Totaliser Rev 4a Dtd 31.03.2010.pdf
Tender Documents • 0.23 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3202-FT-Rev 7.pdf
Tender Documents • 0.97 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3203 Rev 05 Orifice Plate & Flange Assembly-29.04.16.pdf
Tender Documents • 0.89 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3205 Rev 4 Online Retractable Type Orifice Assembly Dtd. 29.04.pdf
Tender Documents • 0.74 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3211-Flow Computer Rev-5 07.03.16 .pdf
Tender Documents • 0.73 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3213 Mag Flow Meter Rev 1 Dated 09.02.2010.pdf
Tender Documents • 0.14 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3214 Cone 20.12..12 Rev 1.pdf
Tender Documents • 0.16 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3300 TG Rev 6 dated 26.03.18.pdf
Tender Documents • 1.74 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3302-TT-Rev.6 Dtd 14.12.2017.pdf
Tender Documents • 0.71 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3400-DPG -7-07.03.16.pdf
Tender Documents • 0.77 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3401 -PG Rev 08 Dated 25-03-19.pdf
Tender Documents • 0.47 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3402 PS Rev 2 date 18.02.08.pdf
Tender Documents • 0.24 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3403-PT-Rev 6.pdf
Tender Documents • 0.99 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3404 I to P Rev 0 Dtd 21-12-2010.pdf
Tender Documents • 0.23 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3500 - Fire & Gas Detection System - Rev 6.pdf
Tender Documents • 0.32 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3501 SDP Rev 5 Dated 31-08-2012.pdf
Tender Documents • 0.47 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3507 FS BULK MATERIAL REV 7.pdf
Tender Documents • 0.46 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3508 Instt Cables Rev 2 Dated 02May11.pdf
Tender Documents • 0.38 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3512 Rev 0 -Topside Actuator-08.09.pdf
Tender Documents • 0.74 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3601- PIC- Rev 5 DTD 04.05.18.pdf
Tender Documents • 0.51 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3602 P to I Rev 2 date 18.02.08.pdf
Tender Documents • 0.09 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3606 for AFR Rev 4.pdf
Tender Documents • 0.11 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3700 Control valve Rev 4 Dated 23.02.2010 .pdf
Tender Documents • 0.34 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_INSTT FS_3701 PRV Rev. 07 Dated 20.03.19.pdf
Tender Documents • 0.49 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_IRT_17.04.05 IRT_All (1).pdf
Tender Documents • 4.63 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_IRT_21. IRT_Rev0 -Installation of Rigid Pipelines & Risers (1).pdf
Tender Documents • 0.24 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_IRT_22. IRT_Rev0 -Pipeline Pigging and Hydrotesting.pdf
Tender Documents • 0.24 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Mechanical FS_5101-safety studies-rev 3.pdf
Tender Documents • 0.28 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Mechanical FS_5102 Functional safety Spec Rev 4.pdf
Tender Documents • 0.40 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Mechanical FS_5103 Clean Agent-rev 2.pdf
Tender Documents • 0.58 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Mechanical FS_5104 HSE REQUIREMENT.doc-rev 1.pdf
Tender Documents • 0.10 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_PIPING-FS_FS 2004 A-Rev-9.pdf
Tender Documents • 0.69 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_PIPING-FS_FS 2004B Rev.3.pdf
Tender Documents • 0.30 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_PIPING-FS_FS 2004D Rev.08 latest .pdf
Tender Documents • 0.47 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_PIPING-FS_FS 2006 Rev.2.pdf
Tender Documents • 0.46 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_PIPING-FS_FS 2008-Rev.3.pdf
Tender Documents • 0.90 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Structural FS_4. Spec.6001F_Rev.11.pdf
Tender Documents • 0.84 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Structural FS_5. SPEC_6011-REV.6.pdf
Tender Documents • 0.44 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Structural FS_6. Spec_2005_rev.8.pdf
Tender Documents • 0.51 MB
VOLUME3_TBP Vol III_TBP Vol III_Section-6B_Welding_FS 2009 F Rev.8 -FS for Welding & NDT + DSS 1..1 (1).pdf
Tender Documents • 1.38 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 1_Background & General WOPL RC 03rd Nov.docx
Tender Documents • 0.34 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 2_Basic Bid Work PLP .docx
Tender Documents • 0.39 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 2_~$aft SOW for PLC 07.10.2024 Rev1.docx
Tender Documents • 0.00 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 4_4A Design Criteria Pipeline-Rigid Rev.5.pdf
Tender Documents • 0.15 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 4_Annexures to Section 4A.docx
Tender Documents • 0.37 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 5_Section 5 - Hook up & Pre Com.docx
Tender Documents • 0.34 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2011 Rev 2 .pdf
Tender Documents • 0.22 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2012A Rev 0.pdf
Tender Documents • 0.40 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2013 Rev 1.pdf
Tender Documents • 0.23 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2013-ADDENDUM TO 2013 Rev1.pdf
Tender Documents • 0.03 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2014 Rev 0 .pdf
Tender Documents • 0.28 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2014-ADDENDUM TO 2014 Rev0.pdf
Tender Documents • 0.03 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2015 Rev 1.pdf
Tender Documents • 0.60 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2018 Rev 0 .pdf
Tender Documents • 0.22 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020A- ADDENDUM TO SPEC 2020A.pdf
Tender Documents • 0.02 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020ARev5.pdf
Tender Documents • 0.26 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020B Rev 5 .pdf
Tender Documents • 0.24 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020B- ADDENDUM-2 TO 2020B.pdf
Tender Documents • 0.02 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020B-ADDENDUM TO 2020B Rev.5.pdf
Tender Documents • 0.02 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020D Rev 2.pdf
Tender Documents • 0.20 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020D- Addendum-2 to 2020D.pdf
Tender Documents • 0.02 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020D-Addendum to 2020D Rev.2.pdf
Tender Documents • 0.02 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020E Rev 4 - UNBONDED FLEXIBLE PIPE FOR SUBMARINE APPLICATION.pdf
Tender Documents • 0.13 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2020E-ADDENDUM TO 2020E Rev 4.pdf
Tender Documents • 0.02 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2021 Rev 0.pdf
Tender Documents • 0.35 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2022 Rev 0, hydrostatic testing of submarine pipelines.pdf
Tender Documents • 0.23 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2024A Rev 0.pdf
Tender Documents • 0.08 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2024B rev 0.pdf
Tender Documents • 0.12 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2025B Rev 2- SSBV .pdf
Tender Documents • 0.21 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2025B-DS Rev 0 DS ball valves (PRP).pdf
Tender Documents • 0.21 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2028B-DS Rev 0 DS Flow TEE (PRP).pdf
Tender Documents • 0.23 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_2028B__Rev_0.pdf
Tender Documents • 0.11 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_Pipeline Mech Connectors spec (PRP) Sour Service.pdf
Tender Documents • 0.71 MB
VOLUME2_27.01.2026TBP Vol II_27.01.2026TBP Vol II_Section 6A_Pipeline Specifications_Pipeline Mech Connectors spec Non Sour service.pdf
Tender Documents • 0.71 MB
VOLUME2_Annexure - 40 Appendix A16 Rev 10.7.pdf
Tender Documents • 0.45 MB
VOLUME2_Annexure - 42 Addendum to TBP (PPE TO BE ISSUED).pdf
Tender Documents • 0.01 MB
VOLUME2_Appendix A10 - Milestone Payment Formula.xlsx
Tender Documents • 0.43 MB
VOLUME2_Basic Bid Scope of Work.docx
Tender Documents • 0.39 MB
VOLUME2_Offshore SVL Revision 12.1.pdf
Tender Documents • 1.28 MB
VOLUME2_Revised Appendix A9_WOPL-RC.docx
Tender Documents • 0.04 MB
VOLUME2_Revised Appendix B-5 & B-6.docx
Tender Documents • 0.04 MB
VOLUME2_SCC PLP 5 yrs.docx
Tender Documents • 0.37 MB
VOLUME2_TBEC.pdf
Tender Documents • 0.24 MB
VOLUME1_A3_PLP_Final.xlsx
Tender Documents • 0.09 MB
VOLUME1_AppendixTPIA1andTPIA2.pdf
Tender Documents • 0.15 MB
VOLUME1_Bidders Response Sheet-Upload in Unpriced Bid.xlsx
Tender Documents • 0.09 MB
VOLUME1_Integrity_Pact.pdf
Tender Documents • 0.38 MB
VOLUME1_PLP_Vol I 04 GCC_Final.pdf
Tender Documents • 1.14 MB
VOLUME1_PLP_Vol I_BEC Commercial.pdf
Tender Documents • 0.51 MB
VOLUME1_PLP_Vol I_Bid Matrix.pdf
Tender Documents • 0.42 MB
VOLUME1_PLP_Vol I_ITB.pdf
Tender Documents • 0.70 MB
VOLUME1_SCC PLP 5 yrs.docx
Tender Documents • 0.37 MB
Corrigendum13Extension040826.pdf
PDF • 0.40 MB
Corrigendum12TBOExt14072026.pdf
PDF • 0.32 MB
Corrigendum11Extension230626.pdf
PDF • 0.20 MB
CorrigendumNo10Dt11062026CommAmds.rar
PDF • 1.06 MB
CorrigendumNo9Dt110626AddTQsandTAs.rar
PDF • 2.64 MB
Corrigendum8TenderExtension10062026.pdf
PDF • 0.20 MB
ReplyandRevisedAppendixA3.rar
PDF • 0.45 MB
CorrigendumNo5Dt120526.pdf
PDF • 0.13 MB
Prebid_Rep_Amend_210426.rar
PDF • 1.72 MB
CorrigendumNo4Dt210426.pdf
PDF • 0.13 MB
CorrigendumNo3Dt110326.pdf
PDF • 0.13 MB
Change_venue_PBC.pdf
PDF • 0.07 MB
Corrigendum_queries_extension_date.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].