Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | L1 | Accepted-AOC Funds lowest bidder | |
| 2 | L2₹6.6 L+₹26,796.20 (4.26%)Rejected-Finance | L2 | Rejected-Finance Quoted high rate as compare to L1 bidder | |
| 3 | L3₹6.7 L+₹37,165.98 (5.91%)Rejected-Finance | L3 | Rejected-Finance Quoted high rate as compare to L1 bidder | |
| 4 | L4₹69,999.95−₹5.6 L (88.9%)Rejected-Finance R O HANUTHANG | L4 | Rejected-Finance Quoted high rate as compare to L1 bidder | |
| 5 | L5₹7.8 L+₹1.5 L (23.8%)Rejected-Finance | L5 | Rejected-Finance Quoted high rate as compare to L1 bidder |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
19 Feb 2021, 2:00 pmClosed
Executive Engineer
Rural Engineering Wing Leh
Development of sport infrastructure at HS Hanu-Yokma
2021_RDD_2277_8
NIT 183 UTLeh REW of 2020-21
Open Tender
Civil Works - Others
Item Rate
120 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
Executive Engineer
₹16,000
Yes
25 Mar 2021
12 Feb 2021
22 Feb 2021
12 Feb 2021
19 Feb 2021
12 Feb 2021
Amount
Earth work in excavati..;n by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed.All kind of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work upto plinth level.1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size.(A)crushed
Centring and shuttermg including strutting, propping etc. and removal of form for·walls attached pillaters buttresses,plinth and string courses etc
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 em in depth, breaking clods, ,-watering, rolling each layer with half tonne roller or wooden L-or steel rammers, and rolling every third and top -most layer with power roller of minimun 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or tilling up ground depressions lead upto 50 mtr and lift upto 1. 5 mtr. in.All kind of soil
Preparation of subgrade by excavating earth to an average of 22.5 em depth, dressing to camber and consolidation with road roller including making good the undulation etc. and disposal of surplus earth upto 50 m~tres.
providing and laying 40mm thick factory made cement concrete interlocked tile paver of M30grade made of block making machine with strong vibratory compaction and of approved size and design /shape laid in required colour and pattern ,including 50mm thick compacted bed of course sand filling joint with course sand etc all complete as per direction of Engineer in charge
Add cost of cement concrete 40mm thick interlock tile
Carriage of cement by MT average lead upto120km
Carriage of sand/bajri by MT average lead upto15km
Carriage of earth by MT average lead upto 4km
M/S TSERING ANGCHUK
TSEWANG NURBOO
M/S MOHD ISMAIL
M/S STANZIN GYALPO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .