Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-Finance | ₹8.1 L | L1 | Accepted-Finance L1 Accept |
| 2 | L2₹8.2 LRejected-Finance | ₹8.2 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | M. MOHAMED ANSARI RAJA L2 | K. ADHIVEL L1 |
|---|---|---|---|---|---|
| 1.00Construction of Bus Shelter at Koppampatti in Koppampatti Panchayat | |||||
| 2.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 21.16 | cum | 265 ₹5,607.40 | 263.5 ₹5,575.66 |
| 3.00 | Refilling the Excavated Earth including all cost and conveyance of all materials and all labour charges etc., compacte | 12.43 | cum | 46 ₹571.78 | 45.5 ₹565.57 |
| 4.00 | Supplying and filling in foundation and basement with FILLING M.SAND in layers not more 15 cm thick in layers, rammed watered and compacted., complete complying to standard specification. | 5.81 | cum | 1,980 ₹11,503.80 | 1,976.4 ₹11,482.88 |
| 5.00 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complying within standard specification and as directed. | 6.39 | cum | 5,550 ₹35,464.50 | 5,541 ₹35,406.99 |
| 6.00 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete. | 13.71 | Cum | 9,175 ₹1.3 L | 9,164 ₹1.3 L |
| 7.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 110.33 | Sqm | 1,120 ₹1.2 L | 1,095 ₹1.2 L |
| 8.00 | Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete | 1.22 | MT | 92,500 ₹1.1 L | 91,902.5 ₹1.1 L |
| 9.00 | Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor. | 16.39 | Cum | 6,200 ₹1.0 L | 6,191 ₹1.0 L |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete | 36.71 | Sq.m | 310 ₹11,380.10 | 308.5 ₹11,325.04 |
Tender Value
₹8.3 L
EMD Value
₹8,250
Closing Date
11 Mar 2026, 3:00 pmClosed
BDO, Kunnandarkoil
Pt. Union office, Kunnandarkoil
Construction of Bus Shelter at Koppampatti in Koppampatti Panchayat
2026_RDTN_673087_1
Kkoil/MLACDS/Koppampatti
Open Tender
Civil Works
Kunnandarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,250
27 Mar 2026
10 Mar 2026
11 Mar 2026
10 Mar 2026
11 Mar 2026
10 Mar 2026
Construction of Bus Shelter at Koppampatti in Koppampatti Panchayat
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Refilling the Excavated Earth including all cost and conveyance of all materials and all labour charges etc., compacte
Supplying and filling in foundation and basement with FILLING M.SAND in layers not more 15 cm thick in layers, rammed watered and compacted., complete complying to standard specification.
Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complying within standard specification and as directed.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete
Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete
Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification.
Supply and Fixing of Ceramic Tiles including cost and conveyance of all materials to site and all labour charges etc. complete
SUPPLY AND FIXING OF GLAZED TILES including cost and conveyance of all materials to site and all labour charges etc. complete
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers
Distember two coats over one coat of primary coat including cleaning preparing the surface one coat of primer.
Painting two coats with Exterior emulsion over one coat of primary coat including cleaning preparing the surface
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 16 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_808907.xls
BOQ • 0.46 MB
Kkoil_docKoppampatti.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid