Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC 121004 | ₹31.5 L | L1 | Accepted-AOC BEING L1 BIDDER |
| 2 | L2₹32.1 L+₹61,191.62 (1.95%)Rejected-Finance | ₹32.1 L+₹61,191.62 (1.95%) | L2 | Rejected-Finance NOT BEING L1 BIDDER |
Tender Value
₹34.2 L
EMD Value
₹68,371
Closing Date
1 Jul 2026, 2:00 pmClosed
PIC, UWD
OFFICE OF PIC, UWD,BHU
Drainage Capacity enhancement and connectivity in Aurobindo Colony and Sunder Bagia, B.H.U.
2026_BHU_912871_3
UWD/2026/02062026-6
Open Tender
Civil Works
Works
75 days
BHU VARANASI
AS PER TENDER DOCUMENT
9 documents required · 9 mandatory
₹500
Registrar, BHU, Varanasi
₹68,371
21 Aug 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
24 Jun 2026 - 27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : (15.24) | 32.5 | cum | 1,282.07 | ₹41,667.28 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) (15.2.1) | 3 | cum | 2,368.53 | ₹7,105.59 |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar (15.7.4) | 4.25 | cum | 2,004.57 | ₹8,519.42 |
| 4 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: Asbestos Cement sheet (15.28.2) | 23 | Sqm | 75.21 | ₹1,729.83 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. : All kinds of soil. (2.8.1) | 275 | cum | 253.27 | ₹69,649.25 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (4.1.8) | 55 | cum | 6,628.08 | ₹3,64,544.4 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (5.1.2) | 73 | cum | 8,801.51 | ₹6,42,510.23 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (5.9.1) | 50 | Sqm | 381.56 | ₹19,078 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (5.9.2) | 598 | sqm | 819.75 | ₹4,90,210.5 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (5.9.3) | 224 | Sqm | 902.21 | ₹2,02,095.04 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_961133.xls
BOQ • 0.28 MB
TENDERDOC.pdf
Tender Documents • 1.92 MB
CorrigendumAurobindo.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .