Loading…
Loading…
Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.1 L+₹10,568.17 (1.75%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.2 L+₹11,775.96 (1.95%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹6.0 L
EMD Value
₹12,078
Closing Date
18 Feb 2026, 4:00 pmClosed
Executive Engineer
Darjeeling Irrigation Division, Saipatri Bhawan, Darjeeling
Emergent Jhora training work of New Jhora at west Jawahar road to lebong hill cart road Singmari Darjeeling GTA.
2026_GTA_999199_1
GTA/EE/DID/NIeT-10/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
Darjeeling
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹12,078
14 May 2026
4 Feb 2026
20 Feb 2026
4 Feb 2026
18 Feb 2026
4 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1500 mm. | 12 | Mtr. | 142.15 | ₹1,705.8 |
| 2 | Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion. | 102 | Mtr. | 4,725.25 | ₹4,81,975.5 |
| 3 | Hire and labour charge for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (upto roof of ground floor)(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht.shall be allowed under 12 (e) for every 4 m or part thereof) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge | 302 | Mtr. | 398.06 | ₹1,20,214.12 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.09 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_2447197.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .