| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC | ₹3.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹3.4 Cr+₹5.0 L (1.50%)Rejected-Finance | ₹3.4 Cr+₹5.0 L (1.50%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹3.9 Cr+₹58.9 L (17.8%)Rejected-Finance | ₹3.9 Cr+₹58.9 L (17.8%) | L3 | Rejected-Finance 3rd Lowest |
Tender Value
₹2.3 Cr
EMD Value
₹2.6 L
Closing Date
25 Mar 2020, 4:00 pmClosed
Executive Engineer Division No-I HPPWD Shimla-3
Executive Engineer Division No-I HPPWD Shimla-3
C/O R/ wall and B/wall, C/O Wire crate wall, CD work including W/W , P/L WBM G-I, WBM G-II and G-III , premix carpet, C/O V.Shape Drain, C/O PCC parapet and logo sign board and kilometre stone km. 0/00 to 6/255)Under NABARD RIDF-XXV
2020_PWD_35357_2
SD-I-VTR-24774 dt 14-2-2020
Open Tender
Civil Works
Item Rate
545 days
Shimla
As per SBD
14 documents required · 14 mandatory
₹5,000
Executive Engineer Division No-I HPPWD Shimla-3
₹2.6 L
29 Aug 2020
27 Feb 2020
26 Mar 2020
27 Feb 2020
25 Mar 2020
27 Feb 2020
Amount
Earth work in excavation for structure in all depths as per drawing and technical specification for rural roads August 2004 clause 305.1 including setting out, construction of shoring abd bracing, removal of stumps and other deleterious materials and disposal in all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where balsting is prohibited) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width , camber super elevation and level as shown on the drawings or as directed by the Engineer-in-charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost).Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dully compensated by him at his on cost in all cases. including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying plain cement concrete 1:4:8(One cement: four sand :eight graded crushed stone aggregate 25mm(twenty five miliemtre)nominal size) mechanically mixed and vibrated in open foundation complete as per drawing and MORD technical specification clauses 802,803,1202 & 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying plain cement concrete 1:4:8(One cement: four sand :eight graded crushed stone aggregate 40mm(forty miliemtre)nominal size) mechanically mixed and vibrated in open foundation complete as per drawing and MORD technical specification clauses 802,803,1202 & 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying cement concrete grade M-10 (Ten) nominal mix 1:3:6(One cement:three sand:six graded crushed stone aggregate 40mm (forty milimetre) nominal size) mechanically mixed and vibrated in open foundation complete as per drawing and MORD technical specification clause 802,803,1202 and 1203 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying of boulder apron laid in wire crates with 4mm(four milimetre) dia GI wire conforming to IS:280 and IS:4826 in 100mm x 100mm (one hundred milimetre into one hundred milimetre)mesh (woven diagonally) including 10 per cent(ten percent) extra for laps and joints laid with stone boulders weighing not less than 25 kg.(twenty five kilogram) each as per drawing and technical specifications clause 1301 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Back filling behind abutment, wing wall and return wall and retaining wall with granular material complete as per drawings and MORD technical specification Clause 1204.3.8 (One thousand Two hundred four point Three point eight) including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm (One hundred milimetre) dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providng and laying reinforced cement concrete pipe NP2 (Two) 900mm (nine hudnred milimetre) dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2(One cement:two sand) but excluding excavation, protection work, back filling, concrete and masonry work in head walls and parapets complete as per drawing and MORD technical specification clause 1108 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying rubble stone flooring laid in cement mortar 1:3(One cement:three sand) over cement concrete bedding complete as per drawing and technical specification and MORD technical specification clause 1303.(Bedding concrete to be measured and paid for separately) including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Preparation of sub-graded by dressing to camber (earth work for the cutting involved for sub grade to be paid for separately depending upon the classification of soil) completed as per HP PWD Specifications including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Consolidation of sub grade with road roller including making good the undulations etc. with earth or quarry soil etc. and re-rolling the sub-grade completed as per HP PWD Specifications 1990 volume-I including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing, laying,spreading and compacting by mechanical means crushed stone aggregates of specific sizes 90 to 40mm (Ninety to Forty milimetres) to water bound macadum specification including spreading and compacting crushed stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing and rolling with three wheel roller 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening type-I to fill-up the interstices of coarse aggregate watering and compacting to the required density grading-I (one) as per Technical Specification Clause 405 including carriage of materials within all leads and lifts and other incidentals and direction of Engineer in charge .
Providing, laying , spreading and compacting by mechanical means crushed stone aggregates of specific sizes 63mm to 40mm(Sixty three milimetre to forty milimetre) to water bound macadum specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN (Kilo Newton) static roller in stages to proper grade and camber, applying and brooming, stone screening Type B 11.2mm (Eleven point two milimetres) binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 (Two) as per MORD Technical specification Clause 405 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing, laying, spreading and compacting by mechanical means crushed stone aggregates of specific sizes 50mm to 25mm(Fifty milimetre to Twenty five milimetre) to water bound macadum specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 KN(Kilo Newton) static roller in stages to proper grade and camber, applying and brooming, stone screening Type B 11.2mm (Eleven point two milimetres) binding materials to fill up the interstices of coaarse aggregate, watering and compacting to the required density Grading 3 (Three) as per MORD Technical Specification Clause 405 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and applying tack coat with Bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.275Kg per (Zero point two seven five kilogramme) per square metre on the prepared granular surface treated with primer and clean with Hydraulic broom as per MORD technical Specfication Clause 503 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Provdiing and applying primer coat with Bitumen emulsion (SS-I) on prepared surface of granular base including cleaning of road surface with hydraulic broom and spraying primer at the rate of 0.85 kg.(Zero point eighty five kilogramme) per square metre using mechanical means as per MORD technical Specification Clause 502 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing laying and rolling by mechanical means of open -graded premix carpet of 20mm(Twenty milimeter) compacted thickness composed of 13.2mm to 5.6mm (Thirteen point Two milimeter to Five point six millimeter) crushed stone aggregates @ 0.27 cum (Zero point Two Seven cubic metre) mixed with 14.6 Kg. (Fourteen point Six Kilogramme) penetration grade bitumen VG-10 (viscostin grade-ten) per 10 (Ten) square metre to required line, grade and level to serve as wearing course on a previously prepared base, including mixing and heating binder and aggregate in a suitable hot mix plant 30/40 (Thirty/Forty) Tonne per hour capacity, transporting mixed material and laying with paver finisher and rolling with a three wheel 80-100 KN (Eighty to one hundred Kilo-Newton) static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per MORD technical specification Clause 508 with anti stiffing agent (Zycothen)@ 1% of Bitumen weight including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying by mechanical means Type-B seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using 6.8 KG (Six point Eight Kilogramme) penetration grade bitumen VG-10 (viscosting grade-ten) mixed with 0.06cum (Zero point zero six cubic metre) crushed sand 2.36mm to 180 micron (Two point Thirty six milimetre to One hundred eighty micron) per 10 (Ten) square metre premixed in a suitable hotmix plant 30/40 (Thirty/Forty) Tonne per hour capacity, transporting and rolling complete with a three wheel 80/100 KN (Eighty to one Hundred Kilo-Newton) static road roller as per MORD technical specification clause 510 using VG-10 (viscosting grade ten) at the rate 6.8 Kg.(Six point Eight kilogramme) premixed with 0.06 (zero point zero six) cubic metre of fine aggreggate per 10 (ten) Square metre by mechanical means and rolling with power road roller 8-10 (eight to ten) tonne capacity including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Reinforced cement concrete M-15 grade kilometre stone/local stone of standard design as per IRC-25 fixing in position including finishing and lettering but excluding painting as per drawing and technical specification clause-1703 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) Ordingly/ Kilometre stone
(ii) 200metre stone
Providing and fixing of retro reflectorised cautionary, mandatory and informtory board with logo as per MORD specifications and drawing as per IRC:67 made of encapsulated lens type reflective sheering vide clause 1701.2.3 fixed over aluminium sheeting 1.5mm(one point five milimetre) thick (10.2)including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and fixing typica NABARD informatory sign board with Logo as per MORD specification and drawing. Three MS plates of 1.6mm (one point sixty six milimetre) thick, top and middle plate duly welded with MS flat iron 25mmx5mm(twentyfive milimetre into five milimetre)size on back on edges. The lower plate will be welded with MS angle iron frame of 25mmx25mmx5mm(twenty five milimetre into twenty five milimetre into five milimetre) The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 Nos(two numbers)75mmx75mm (seventy five milimetre into seventy five milimetre) of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mmx450mmx600mm(four hundred fifty milimetre into four hundred fifty milimetre into six hundred milimetre) below ground level etc. as per drawing clause 1701 and Annexure-1700.1.including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and erecting direction and place identification retro reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 2mm (two milimetre) thick with area exceeding 0.9 sqm(zero point nine suqare metre) supported on mild on dia G.I. pipe firmly fixed to the ground by means of properly designed foundation with M-15 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
kapoor sanjee
CHANDAN SWAROOP
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .