New Construction work of the Jaharveer Baba Talhaita to Talhaita Fazalgarh Sampark road
2026_CEMRT_1185490_8
8307/96M/E-TENDER/BSR- CIRCLE/2026-27 Dated 17.08.2026
Open Tender
Civil Works - Roads
Percentage
365 days
ghaziabad
New Construction work of the Jaharveer Baba Talhaita to Talhaita Fazalgarh Sampark road
2 documents required · 2 mandatory
₹2,714
₹7.4 L
SE, BSR-O, PWD, BULANDSHAHAR
15 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
22 Sept 2026
15 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A BITUMINOUS WORK
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete but excluding GST | 165 | Cum | 37 | ₹6,105 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete but excluding GST | 4,100 | Cum | 110 | ₹4,51,000 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. as per Technical Specification Clause 401. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. | 971 | Cum | 3,000 | ₹29,13,000 |
| 4 | Cement Treated Sub base
Providing, laying and speading material on a prepared sub grade, adding cement @ 2% by weight to the spread materaial manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete but excluding GST | 562.5 | Cum | 4,500 | ₹25,31,250 |
| 5 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular/ Bituminous surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. | 7,500 | Sqm | 24 | ₹1,80,000 |
| 6 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508 Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. | 7,500 | Sqm | 220 | ₹16,50,000 |
| 7 | Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. | 7,500 | Sqm | 85 | ₹6,37,500 |
| 8 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Patri work) Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete but excluding GST | 1,400 | Cum | 100 | ₹1,40,000 |
| 9 | PART B CC/RCC WORK
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete but excluding GST | 16 | Cum | 37 | ₹592 |
| 10 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 340 | Cum | 110 | ₹37,400 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
BOQ_2231101.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .