Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹2,297.68 (0.46%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.0 L+₹2,497.48 (0.50%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹9,990
Closing Date
5 Sept 2026, 1:30 pmClosed
EE PWD HD
ONKARMAL JETIAROAD HOWRAH
Repair and restoration of 2 Nos Rooms at Bally Khal labour shed including bathroom and kitchen during the year 2026-2027.
2026_WBPWD_5020716_2
WBPWD/EE/HD/NIeT40/2026/27
Open Tender
CIVIL WORKS
Percentage
21 days
HOWRAH
Referred to Tender Documents.
4 documents required · 4 mandatory
₹9,990
29 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15.56
Dismantling old plaster or skirting raking out joints and cleaning the
surface for plaster including disposal of rubbish to the dumping ground
within 50 metres lead. | 0.6 | sq.m | 54.65 | ₹32.74 |
| 2 | 15.12
Dismantling doors, windows and clerestory windows (steel or wood)
shutter including chowkhats, architrave, holdfasts etc. complete and
stacking within 50 metres lead :
15.12.1 Of area 3 sq. metres and below | - | each | 367.2 | - |
| 3 | 15.23
Dismantling tile work in floors and roofs laid in cement mortar including
stacking material within 50 metres lead.
15.23.1 For thickness of tiles 10 mm to 25 mm | - | sq.m | 73.4 | - |
| 4 | 15.28
Dismantling roofing including ridges, hips, valleys and gutters etc., and
stacking the material within 50 metres lead of:
15.28.2 Asbestos Cement sheet | - | sq.m | 77.3 | - |
| 5 | 6.13
Half brick masonry with common burnt clay F.P.S. (non modular) bricks
of class designation 7.5 in superstructure above plinth level up to floor
V level.
6.13.2
Cement mortar 1:4 (1 cement :4 coarse sand) | 1 | sq.m | 1,123.8 | ₹1,122.68 |
| 6 | 13.6
20 mm cement plaster of mix :
13.6.2
1:6 (1 cement: 6 coarse sand) | 0.6 | sq.m | 466.05 | ₹279.16 |
| 7 | 9.1
Providing wood work in frames of doors, windows, clerestory windows
and other frames, wrought framed and fixed in position with hold fast lugs
or with dash fasteners of required dia & length (hold fast lugs or dash
fastener shall be paid for separately).
9.1.2
Sal wood | 1 | cu.m | 1,16,520 | ₹1,16,403.48 |
| 8 | 9.5
Providing and fixing panelled or panelled and glazed shutters for doors,
windows and clerestory windows, fixing with butt hinges of required
size with necessary screws, excluding panelling which will be paid
for separately, all complete as per direction of Engineer-in-charge.
(Note: Butt hinges and necessary screws shall be paid separately) 9.5.3
Kiln seasoned selected planks of sheesham wood
9.5.3.2
30 mm thick shutters | - | sq.m | 3,338.65 | - |
| 9 | 9.57
Providing and fixing ISI marked IS:1341 oxidised M.S. pressed butt
hinges with necessary screws etc. complete. (Copper oxidised as per
IS 1378)
9.57.2
100x58x1.90 mm | - | each | 48.2 | - |
| 10 | 9.62
Providing and fixing ISI marked oxidised M.S. sliding door bolts with nuts
and screws etc. complete (Copper oxidised as per IS 1378)
9.62.1
300x16 mm | - | each | 216.55 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 0.57 MB
BOQ_5096800.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .