Tender Value
₹1.8 Cr
EMD Value
₹2.4 L
Closing Date
23 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TECH TELE
17 conditions · 3 needing a document upload
: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-VIII given in tender document, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause No. 10.2 of Tender Form (second Sheet) of Annex. I of Part-I of GCC-2022, with up to date correction slip.
Note: (i) For Joint Venture (JV): The tenderer shall submit credentials as mentioned in Clause 17 of GCC April 2022 (Ammended upto date). (ii) In case, date of tender inviting is on or after date of statutory deadline for audit of balance sheet of previous Financial Year (i.e. 30th Sept. or as further extended for this FY), audited balance sheet of 4th previous year shall not be considered unless concerned CA certifies that balance sheet is not audited yet as on date of invitation of this tender. (iii) In case Audited Balance Sheet of any FY is not submitted alongwtih original offer, then Contractual turnover of that FY shall be considered NIL for calculation of average. 2)Please submit copies of Audited Balance sheets and Profit Loss Account for all 3/4 previous Financial Years 3)Please submit CA certificate for Contractual Turnover (Format given for reference in (Annexure- VIII)
13 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer has to opt for taking payment through letter of credit (LC)as per Railway Board's letter no. 2018/CE-I/CT/9 dated 4.6.18.
Tenderers are required to quote their Permanent Account Number in the tender document.
If tenderer submit/ upload Audited Balance sheet duly certified by the Chartered accountant to fulfill the Standard Financial Criteria, tenderer may also submit/ upload Form No.26AS /16A along with tender offer to certify the amount of contractual receipt.
No garbage, dry leaves, paper grass bushes or any other items shall be burnt. They shall Only be disposed at nominated disposal point by prescribed methods duly observing the Municipal solid wastes(Management and Handling) Rules,2000 indicates under Schedule II- Management of Municpal Solid Wastes: Para I.I vii that Waste(garbage, dry leaves) shall not be burnt. Any violation of the provisions of the MSW rules,2000, attracts the penal provisions of Environment(protection) ACT,1986.CPCB and SPCBs have also issued various guidelines/orders against the practice of such open burning. If the contractor or anybody deployed by him for this work is found guilty of irregulated open burning of plastic, rubber, waste and similar substances a fine of Rs.5000/- on each occasion shall be imposed in addition to the other rights and remedies available in the contract. Decision of Engineer in-charge shall be final and binding in this regard.
All the items/equipment related to CCTV surveillance system i.e. items covered in NS12, NS13, NS14, NS15, NS16, NS17, NS19, NS29, NS30, NS32, NS33 included in the work should carry a warranty of 03 years from the date of satisfactory commissioning of the system.
Telecom work in c/w augmentation of facilities at LAHLI, BNWC, KNL, BHT, BWC goods shad of Bikaner division.
SnT-BKN-25-26-41
SnT-BKN-25-26-41
Open
Works - General
6 Months
Bikaner, Rajasthan
₹0
₹2.4 L
23 Mar 2026
25 Feb 2026
9 Mar 2026
19 items across 3 schedules · ₹34,41,152.95 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | without using Auger shall be done at the the ground considered bank of the shall be insertion GI pipes Engineer In covered provide all adequate of cables cautiously due to on cable. Charges: Execution. | Metre | 1730.00 | 1,202.97 | 20,81,138.1 |
| 2 | pushing 1.5 meter as per Supply is Inspection: None. | Metre | 210.00 | 122.74 | 25,775.4 |
| 3 | cable route to 0.6 Mtr. sketch No. alongside soil/strata, cable route clearing of cable a layer of before be done as Western Engineer trench is not specific be required of 1.2m is of JA trenching will than 1.2m. Charges: Execution( | cum | 1000.00 | 274.28 | 2,74,280 |
| 4 | from rail to 0.6 Mtrs of DWC/ pipe disturbed be required by and crossing, for Road 5 of 11 are Consignee Terms: Meter) | cum | 180.00 | 274.28 | 49,370.4 |
| 5 | Deep and / Road / leveling surface of will be chase and rocky ground on layer of thickness the trench layer of sand In case can not be GI/ CI /PVC numbers of cables are In isolated surface by or cement be placed jointed with concrete with on top of rocky area normal depth it will be incharge Inspection 100% after | cum | 209.00 | 503.04 | 1,05,135.36 |
| 6 | cores/ pairs/ pipes/ DWC laying of crossings. of coloured any other to give Gantry will be laying by of Railway submit the Length of the cable Inspection: None. Execution(unit is | Metre | 7500.00 | 9.1 | 68,250 |
| Schedule total | ₹26,03,949.26 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCCS3.pdf
ATTACHMENT
GCCCS8.pdf
ATTACHMENT
GCCCS7.pdf
ATTACHMENT
IRGCCApril2022.pdf
ATTACHMENT
GCCCS1.pdf
ATTACHMENT
GCCCS2.pdf
ATTACHMENT
GCCCS9.pdf
ATTACHMENT
GCCCS4.pdf
ATTACHMENT
GCCCS5.pdf
ATTACHMENT
GCCCS6.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_10ACS.pdf
ATTACHMENT
earthingTAN3006Ver3_1dated30_06_2025.pdf
ATTACHMENT
SignedTenderbooklet5GoodSheds23022026.pdf Tender booklet
ATTACHMENT
SignedTenderbooklet5GoodSheds23022026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .