| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | ₹37.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹38.9 LRejected-AOC | ₹38.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹39.7 LRejected-AOC | ₹39.7 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | malaiammanconstruction L3 | Maki Construction L2 | ADHI & CO L1 |
|---|---|---|---|---|---|---|
| 1.00 | Strengthening the Road from Vanavarayanallur-karaiputhur road to puliyampatti km 0/0-2/0 (Working Reach 0/0-1/22) | 1 | no | - | - | - |
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete. | 1,464 | sqm | 6 ₹8,784 | 6 ₹8,784 | 6 ₹8,784 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A | 464.4 | cum | 135 ₹62,694 | 140 ₹65,016 | 140 ₹65,016 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS km 0/0-1/0 | 225 | cum | 430 ₹96,750 | 430 ₹96,750 | 430 ₹96,750 |
| 5.00 | km 1/0-1/22 | 49.5 | cum | 450 ₹22,275 | 450 ₹22,275 | 450 ₹22,275 |
| 6.00 | Picking 5cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,407.1 | sqm | 23 ₹32,363.30 | 23 ₹32,363.30 | 23 ₹32,363.30 |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/750 | 527.66 | cum | 2,500 ₹13.2 L | 2,400 ₹12.7 L | 2,275 ₹12.0 L |
| 8.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 4,221.25 | sqm | 85 ₹3.6 L | 85 ₹3.6 L | 80 ₹3.4 L |
| 9.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 4,221.25 | sqm | 20 ₹84,425 | 20 ₹84,425 | 20 ₹84,425 |
| 10.00 | Providing and laying Tack coat over BT surface(treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 375 | sqm | 34 ₹12,750 | 34 ₹12,750 | 30 ₹11,250 |
Tender Value
Refer Docs
EMD Value
₹40,541
Closing Date
6 Jan 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP)
Block Development Officer (VP) Kundadam
Strengthening the Road from Vanavarayanallur-Karaiputhur road to puliyampatti km 0/0-2/0 (Working Reach 0/0-1/22)
2025_RDTN_635914_1
932/2024/A3 dt 30/08/25
Open Tender
Civil Works
180 days
Kundadam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹40,541
13 Jan 2026
24 Dec 2025
6 Jan 2026
24 Dec 2025
6 Jan 2026
24 Dec 2025
Amount
Strengthening the Road from Vanavarayanallur-karaiputhur road to puliyampatti km 0/0-2/0 (Working Reach 0/0-1/22)
Clearing the Scrub jungle including all labour charges for burrying and burning etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS km 0/0-1/0
Picking 5cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-0/750
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Tack coat over BT surface(treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for KM stone
Provision for HM stone
Photography Charges
NAME BOARD
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Maki Construction (BID ID -1554608)
malaiammanconstruction (BID ID -1553699)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_761084.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
tenderdocument.pdf
Tender Documents • 3.31 MB
tendernotice.pdf
Additional Documents • 0.15 MB
BOQ_761084.xls
BOQ • 0.28 MB