Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.1 L+₹31,988.46 (1.01%)Rejected-Finance | L2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | Jamuna rani L1 | S.ABUSALI L2 |
|---|---|---|---|---|---|
| 1.00Construction of OHT (60000 Litre in) Keelamoongiladi colony at Keelamoongiladi Panchayat in Magalur Block | |||||
| 2.00 | Earthwork Excavation and depositing on bank wiyh initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. | 122.57 | cum | 264 ₹32,358.48 Lowest | 267 ₹32,726.19 |
| 3.00 | Second Depth. OF 2m from 2m to 4m below GL For column footing | 21.29 | cum | 275 ₹5,854.75 Lowest | 278 ₹5,918.62 |
| 4.00 | Sand Filling with clear River sand including cost of sand,watering,ramming,and consolidation etc. | 6.08 | cum | 2,230 ₹13,558.4 Lowest | 2,252 ₹13,692.16 |
| 5.00 | C.C.1:4:8 Mix using 40mm iss metal for leveling course including cost of mixing concrete, ramming, curing etc. | 9.13 | cum | 6,018 ₹54,944.34 Lowest | 6,078 ₹55,492.14 |
| 6.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical viarator, finishing, curing etc., complete as directed by TWAD Board officers. | 34.66 | cum | 9,534 ₹3,30,448.44 Lowest | 9,629 ₹3,33,741.14 |
| 7.00 | For items 0 to 1.50m below GL | 2.53 | cum | 9,534 ₹24,121.02 Lowest | 9,629 ₹24,361.37 |
| 8.00 | For items 0 m to 4.5m above GL | 3.79 | cum | 9,675 ₹36,668.25 Lowest | 9,772 ₹37,035.88 |
| 9.00 | For items 4.51 m to 7.32m above GL | 2.97 | cum | 10,509 ₹31,211.73 Lowest | 10,614 ₹31,523.58 |
| 10.00 | For items 7.32m 10.98m above GL | 3.38 | cum | 10,787 ₹36,460.06 Lowest | 10,895 ₹36,825.1 |
Tender Value
₹32.1 L
EMD Value
₹33,000
Closing Date
10 Feb 2026, 3:00 pmClosed
Additional Collector
Drda,Cuddalore
Construction of OHT (60000 Litre in) Keelamoongiladi colony at Keelamoongiladi Panchayat TN 03 52
2026_RDTN_646889_127
A14/6010/2025 PMKKKY
Open Tender
Civil Works - Others
Item Wise
180 days
DRDA
As per tender
3 documents required · 3 mandatory
₹0
₹33,000
4 Apr 2026
7 Feb 2026
10 Feb 2026
7 Feb 2026
10 Feb 2026
7 Feb 2026
Construction of OHT (60000 Litre in) Keelamoongiladi colony at Keelamoongiladi Panchayat in Magalur Block
Earthwork Excavation and depositing on bank wiyh initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers.
Second Depth. OF 2m from 2m to 4m below GL For column footing
Sand Filling with clear River sand including cost of sand,watering,ramming,and consolidation etc.
C.C.1:4:8 Mix using 40mm iss metal for leveling course including cost of mixing concrete, ramming, curing etc.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical viarator, finishing, curing etc., complete as directed by TWAD Board officers.
For items 0 to 1.50m below GL
For items 0 m to 4.5m above GL
For items 4.51 m to 7.32m above GL
For items 7.32m 10.98m above GL
For items 10.98m to 14.64m above GL
For items 14.64m to 18.3m above GL
Supplying Fabricating and Placing in Possition of HSD Steel rods for Reinforcement including cost of Steel and binding wire etc.
Supplying and Erecting Steel Centering for sides and soffits including necessary supports and shuttering to the required height for R.C.C. ITEM Using M.S.Sheets including labour charges etc. Below Gl
GL to 3.30m (B1)
From 3.30 to 4.30m
11.30 to 12.30m above GL
Curved surface 0 to 3.30 Mtr
Square column 0 to 3.30 Mtr
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Fabrication, supply,delivery and fixing of out side MS Ladder of 45cm wide made out of 50x50x6 mmMS angle for sides and steps in 16mm MS Plain rod fixed at 30cm centre tocentre welded, jointedetc,Providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint etc.
Providing and fixing of R.C.C. inner access ladder in R.C.C. 1:1.5:3 mix using 20mm ISS Metal including cost of reinforcement ,placing in grill in possition ,centering,shuttering charges mixing concrete curing etc.
Providing Ac vent cowl arrangements mosquito proof nylon net with 110mm dia Cowl etc.
Providing Cut Stone Slab in cm 1:3 mix
Providing man hole cover of size 0.60x0.60 in R.C.C. 1:1.5:3 mix with suitable reinforcement, 50x50x6mm MS Angle fixed along edges etc.
Provision for pipe connection arrangements for inlet, outlet, scour and overflow etc., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc. complete as detailed below. 65mm dia GI pipes for inlet connection.
65mm dia GI elbow
65mm dia GI Flange set
65mm dia GI coupling
80mm dia GI pipes
90mm dia PVC Threaded coupler
80mm dia GI Tee
80mm dia GI elbow
80mm dia GM Gate valve
80mm dia GI Flange set
80mm dia GI coupling
80mm dia GI Dummy
Labour charges for GI pipe connection to the OHT , for inlet,outlet,overflow and scour arrangements including cutting and threading earth work excavation and refilling
Providing hand rails over the roof slab by using 32mm GI pipe with 40mm x 6mm MS flat and fixed with 12mm dia fastner bolt 75mm long and as directed by TWAD officers
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers.
PLATFORM
Earthwork excavation and depositing on bank with an intial lesd & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation
Sand filling with good river sand including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:2:4 mix using 20 mm metal used for Wearing Coat including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Brick Work in Cement Mortar 1:5 using Country Bricks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Plastering with cement mortar 1:4mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Filling the stones in soakpit incluiding the cost and conveyance of materials 40mm
Rcc Precast rings
Ring and RCC Cover Slab
PUMP ROOM
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture.
Special ceiling plastering in CM 1:3 –10mm thick including cost and conveyance of all materials and all labour charges etc., complete.
Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Flooring with Granolithic flooring to 25mm thick using CC 1:2:4 mix using 20mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Painting the newly plastered wall surface with two coats of Plastic Emulsion Paint outside the building over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification.
Painting two coats with ready mix paint of approved colour and trade for doors & windows including cost and conveyance of all materials and all other labour charges etc., complete.
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
Supplying Steel Door and windows as per standard specification
Towards Labour charges for Fixing of Steel Doors
Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductor of 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accessaries with TW Switch box with 5 A F . T . Switch with painting of suitable colour for Light Point and Fan Point ( For Electronic Regulator ) S D N o 18
Supply and fixing of 15w CFL Lamp (spiral lamp) for existing holder on wall etc complete.
Supply and fixing of 16amps DP Switch with metal clod of 500v with tube connection 32Amps and netural on suitable T.W Plug plante with supplying on reeper on Either side With PWD Earthen etc.
Supply and run of 2 of 6s.qm 84/100 pvc SC Unstrenthed on condition of 1100v grade in 25mm side GI Pipe lend with both ends with necssary angles etc
Supply and run of 2 of 6s.qm 84/103 pvc SC Unstrenthed on condition of 1100v on 7/70 GI Reducer with fuse service connection etc
Provision for EB Service connection charges
Towards cost and supply of RCC Jolly of size 0.60*0.60m
Provision for Epl And pumping Main Arrangements
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_782398.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
52.pdf
Tender Documents • 0.82 MB
BOQ_782398.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .