Tender Value
₹98.7 L
EMD Value
₹2.0 L
Closing Date
31 Aug 2026, 2:00 pm4d left
Director,Works and Plant
Directorate of Works and Plant,BAU,Kanke,Ranchi
Renovation of the Administrative (Headquarter) Building including partial internal repair, Construction of Retaining Wall attached Toilet for the Director Administration (D.A.) Chamber and Record Room at BAU, Kanke, Ranchi
2026_BAU_117830_2
302 dated 19.08.2026
Open Tender
Civil Works
Percentage
180 days
BAU, Kanke
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.0 L
Yes
24 Aug 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Extra for cleaning the old surface by scrapping the entire old white wash or colour wash including cost of scaffolding all complete as per direction of E/I. | 3,019.53 | sqm | 12.59 | ₹38,015.88 |
| 2 | Dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth watering and disposal of unserviceable materials with all leads all complete as per direction of E/I | 329.92 | sqm | 21.46 | ₹7,080.08 |
| 3 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 17.71 | cum | 955.89 | ₹16,928.81 |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 40.8 | Sqm | - | - |
| 5 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 8.7 | cum | 1,993.04 | ₹17,339.45 |
| 6 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 23.44 | Cum | 541.67 | ₹12,696.74 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 6.79 | Cum | 4,961.73 | ₹33,690.15 |
| 8 | Providing 12mm thick water proof cement plaster (1:3) with clean coarse sand of F.M. 1.5 with 5% cico or any other approved water proofing compound including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. | 92.07 | Sqm | 189.13 | ₹17,413.2 |
| 9 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. | 388.62 | Sqm | 165.8 | ₹64,433.2 |
| 10 | Providing 6mm thick cement plaster (1:4) in ceiling with clean of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. | 64.72 | sqm | 184.06 | ₹11,912.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_159282.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].