| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-1₹65.4 LAccepted-Finance | ₹65.4 L | H-1 | Accepted-Finance Bid rank decided as per Combined score based on Technical and Financial Score |
| 2 | H-2₹79.6 L+₹14.2 L (21.7%)Accepted-Finance | ₹79.6 L+₹14.2 L (21.7%) | H-2 | Accepted-Finance Bid rank decided as per Combined score based on Technical and Financial Score |
| 3 | H-3₹93.7 L+₹28.3 L (43.2%)Accepted-Finance | ₹93.7 L+₹28.3 L (43.2%) | H-3 | Accepted-Finance Bid rank decided as per Combined score based on Technical and Financial Score |
| 4 | H-4₹89.4 L+₹23.9 L (36.6%)Accepted-Finance | ₹89.4 L+₹23.9 L (36.6%) | H-4 | Accepted-Finance Bid rank decided as per Combined score based on Technical and Financial Score |
| 5 | H-5₹1.1 Cr+₹40.8 L (62.3%)Accepted-Finance ARTEFACT TOWER PLOT NO 54 3 CHHATRAPATI SQUARE WARDHA ROAD NAGPUR | NAGPUR | ₹1.1 Cr+₹40.8 L (62.3%) | H-5 | Accepted-Finance Bid rank decided as per Combined score based on Technical and Financial Score |
Tender Value
Refer Docs
Closing Date
4 Feb 2025, 3:00 pmClosed
Regional Officer, MoRTH Bhubaneswar
Regional Office MoRTH Bhubaneswar
Consultancy Services for preparation of Detailed Project Report for Widening to 4L from km 235.00 to km 300.300 of Nayagarh Khordha on NH 57 in the State of Odisha
2025_MoRTH_842755_1
08-ROBBSR-2024-25
Open Tender
Civil Works - Highways
Item Rate
360 days
Nayagarh Khordha
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
Pay and accounts officer, Kolkata
Exempted
Regional Office MoRTH Bhubaneswar
1 Jul 2025
3 Jan 2025
5 Feb 2025
3 Jan 2025
4 Feb 2025
3 Jan 2025
14 Jan 2025
Amount
Key Personnel (Professional Staff)
Team Leader cum Highway Engineer
Bridge Engineer
Highway Engineer
Material-cum-Geo-technical Engineer
Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor
Land Acquisition Expert
Utility Expert
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
Support Staff
Office Manager
Typist
Office Boy
Night Watchman
III. Transportation (Fixed costs)
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Duty Travel to Site (Fixed Costs)
Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc.
Office Supplies, Utilities and Communication ( Fixed Costs )
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment ( Rental )
Office Furniture and Equipment
Reports and Document Printing
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
IX Survey and Investigation
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology
B. Investigation (Fixed cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub-Soil Investigation (Boring)
(a) Boaring in all type of soils (other than hard rock)
(b) Boaring in hard rock
NET WORK SURVEY AND GPR
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Cost of supply and fixing boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Land acquisition Team including support staff and logistics/transportation
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Logistic for Land Acquisition Team
Computer including necessary peripherals
Printer
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Indian Technocrat Limited (BID ID -3164142)
CMEC CONSULTING ENGINEERS PVT. LTD. (BID ID -3166340)
AYOLEEZA CONSULTANTS PVT. LTD. (BID ID -3166162)
Almondz Global Infra Consultant Limited (BID ID -3166334)
Artefact Projects Ltd. (BID ID -3166326)
Geo Designs and Reserch Pvt. Ltd. (BID ID -3166343)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .