Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹77.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹77.9 L+₹7,807.29 (0.10%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹78.0 L+₹12,491.67 (0.16%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹78.1 L
EMD Value
₹5.9 L
Closing Date
18 Jun 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD NO56 LALPUR MEERAPUR BASAHI ANTARGAT EDHE ME ABC CENTRE ME 20 ATIRIKT SAMUDAYIK SWANSHALA KA NAIRMAN KARYA.
2026_NNVAR_1160398_5
44_2026-27
Open Tender
Civil Works
Percentage
90 days
VARANASI NAGAR NIGAM
AS PER TD
3 documents required · 3 mandatory
₹7,807
TENDER COST, Account no- 50100642535388
₹5.9 L
13 Jul 2026
13 Jun 2026
18 Jun 2026
13 Jun 2026
18 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1वार्ड स०-56 लालपुर मीरापुर बसही के अन्तर्गत एढ़े में ,0ch0lh0 lsUVj esa 20 vfrfjDr lkeqnkf;d 'oku'kkyk का निर्माण कार्य | |||||
| 1.01 | Excavation foundation in ordinary soil including lift up to 1.5 m and lead up to 30m and including all compete work.SOR-251 | 124.29 | Cum | 130 | ₹16,157.7 |
| 1.02 | P/L Cement concrete in 1:6:12 with cement sand & brick ballast etc all complete (S.O.R. 2020 REF 305 SI NO. 4) & NNV-Sr No-1.04 | 71.06 | Cum | 4,060 | ₹2,88,503.6 |
| 1.03 | R.C.C work in 1:1.5:3 with cement ,c/sand and 20 mm stone grit with all complete, SOR SI No. 284 B | 194.24 | Cum | 9,100 | ₹17,67,584 |
| 1.04 | Mild steel work or iron in plain for R.C.C work etc. all complete. SOR SI No.504 | 152.48 | qtl | 6,350 | ₹9,68,248 |
| 1.05 | M-150 class brick work in 1:4 cement & f-sand etc all cpmlete.(Rate Tendar-I.N.1.10) | 184.28 | Cum | 5,500 | ₹10,13,540 |
| 1.06 | P/L D.P.C. work in 1:1.5:3 with cement c.sand & 13 mm gauge stone grit etc all complete .NNV-Sr No-1.15 | 71.46 | Sqm | 330 | ₹23,581.8 |
| 1.07 | Plaster work in 1:4 cement coase sand etc all compt. Work.SOR SI No.584 | 1,579.5 | sqr | 165 | ₹2,60,617.5 |
| 1.08 | C.C work in 1:2:4 with cement ,c/sand and 20 mm stone grit with all complete. NNV-Sr No-1.56 | 49.2 | Cum | 6,800 | ₹3,34,560 |
| 1.09 | Finishing walls one coat of the water proofing cement paint of approved etc all complete. | 1,579.5 | sqr | 30 | ₹47,385 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.53 MB
tdt2awasthapna.pdf
Tender Documents • 6.51 MB
BOQ_2174826.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .