Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹24.3 L+₹3.7 L (17.9%)Accepted-Finance | ₹24.3 L+₹3.7 L (17.9%) | 2 | Accepted-Finance Qualified |
| 2 | 2₹24.3 L+₹3.7 L (17.9%)Accepted-Finance AT WARD 19 PO PADHUAMPADA DIST BALESWAR PIN 756001 ODISHA | PADHUAMPADA | BALESWAR | ODISHA | 756001 | ₹24.3 L+₹3.7 L (17.9%) | 2 | Accepted-Finance Qualified |
| 3 | 2₹24.3 L+₹3.7 L (17.9%)Accepted-Finance AT P O NATI P S NIALI DIST CUTTACK PIN 754294 | NATI | CUTTACK | ODISHA | 754294 | ₹24.3 L+₹3.7 L (17.9%) | 2 | Accepted-Finance Qualified |
| 4 | 2₹24.3 L+₹3.7 L (17.9%)Accepted-Finance | ₹24.3 L+₹3.7 L (17.9%) | 2 | Accepted-Finance Qualified |
| 5 | 2₹24.3 L+₹3.7 L (17.9%)Accepted-Finance | ₹24.3 L+₹3.7 L (17.9%) | 2 | Accepted-Finance Qualified |
Tender Value
₹24.3 L
EMD Value
₹24,400
Closing Date
22 Jun 2026, 5:00 pmClosed
Superintending Engineer minor Irrigation
Office of the Superintending Engineer minor Irrigation Division, Balasore, Near Phandi Chhaka, Balasore, 756001
Improvement to Chheliabandha MIP (D/W) in Soro Block of Balasore District under the Scheme Improvement to Diversion Weir for the FY 2026-27.
2026_CEMIB_131881_2
SEMID-02/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Soro Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹24,400
Yes
3 Sept 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungle uprooting stumps and small bushes and trees below 1m girth on premeasurement required etc. with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. | - | sqm | - | - |
| 2 | Dismantling and removing cement concrete for all height including stacking the useful materials for reuse and removing the debris within all lead and lifts including all labour & T&P materials required for the item etc. complete as directed by the Engineer-in charge. | - | cum | - | - |
| 3 | Earth work , excavation loading, unloading and carriage for approach channel etc cutting by mechanical means of all kinds of soil interspread with boulders upto 1/2 cum size with all leads, lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site including depositing the excavated earth in proper profile etc as per the specification and as directed by the Engineer- in-charge within an initial lead from the place of excavation complete as per the direction of the Engineer-in-charge. (Measurement to be taken at finished level section). | - | cum | - | - |
| 4 | Earth work in excavation of foundation in all kinds of soil with all leads and lifts including dressing and leveling the bed of foundation to proper slope and level and making it fit for laying concrete including depositing the excavated materials clear of work site with all leads, lifts and delifts etc. complete including dewatering from foundation if required etc. with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. | - | cum | 1 | - |
| 5 | Providing Cement Concrete M-15 grade ( for plain or RCC works on approved surface or shape as per estimate where required) and using 20mm down grade crusher broken hard granite stone aggregate of approved quality quarried free from weathered skin, quarry debris and foreign materials using clean and sharp sand of approved grading and quality confirming to the design specification including hoisting, lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with Vibrators and finishing the exposed surface smooth including watering, curing for required period providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials with all cost of tools & plant, cost and carriage of water etc with supply of all labour, taxes as per prevailing norm and supervision charges including mobilisation and de-mobilisation of men & machineries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. | 0.4 | cum | 1 | ₹0.4 |
| 6 | Providing Cement Concrete M-20 grade for RCC works on approved surface or shape and size using 20mm down grade crusher broken hard granite stone aggregate of approved quality quarried free from weathered skin,quarry debris and foreign materials using clean and sharp sand of approved grading and quality confirming to the design specification including hoisting, lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with Vibrators and finishing the exposed surface smooth including watering, curing for required period providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials with (excluding cost of M.S. rod carriage and labour for cutting, binding, binding and fixing of M.S. rod) all cost of tools & plant, cost and carriage of water etc with supply of all labour, taxes as per prevailing norm and supervision charges including mobilisation and de-mobilisation of men & machineries, T&P with all incidental charges required for the work complete in all respect as directed by the Engineer-in-charge. | - | cum | - | - |
| 7 | Supplying, Straightening, cutting, bending , binding and tying the grills and placing HYSD bars reinforcement in position as per approved design & drawing for fabrication and fixing of reinforcement including lapping where necessary including cost, conveyance & supply of binding wires of 18 to 20 gauge with supply of all labour , with all leads, lifts from bending yard to placement spot with cost & conveyance and all taxes of steel bars of any reinforcement supplying all labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in-charge. (weight of the binding wire will not be included in the measurement of for payment) | - | qntl | 1 | - |
| 8 | Providing rigid smooth centering & shuttering (with box type steel shuttering plates with keys for intermediate construction joints in rafts, wherever required) for concrete works as per site requirement including false work and including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delifts including supply of all labour, all taxes as per prevailing norm and T&P required for the items etc complete in all respect as directed by Engineer-in-charge . | - | sqm | 1 | - |
| 9 | Providing & removing rigid smooth centring and shuttering for CC/RCC work in R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas including cost of materials,labour,T&P etc. complete as directed by the Engineer-in-charge. | - | sqm | - | - |
| 10 | 12mm thick cement plaster (1 : 4 ) over brick work including all cost, carriage, Royality, T & P etc complete as per direc-tion of Engineer in Charage. | 1 | sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_596140.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.82 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tendernotice_2.pdf
PDF • 5.06 MB
BOQ_596140.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .