| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.0 L+₹27,189.69 (9.93%)Admitted-Fee/PreQual/Technical/Finance | ₹3.0 L+₹27,189.69 (9.93%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.1 L+₹33,573.49 (12.3%)Admitted-Fee/PreQual/Technical/Finance 145 B SOUTH MASI STREET TENKASI DISTRICT | TENKASI | TAMIL NADU | 627412 | ₹3.1 L+₹33,573.49 (12.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Sree Kanishka Constructions L2 | Guna Construction L3 | K.CHITRA TRADERS L1 |
|---|---|---|---|---|---|---|
| 1.00Tirupathur District - Construction of Ecart Shed Near Kailasagiri Panchayat office in Kailasagiri Panchayat at Madhanur Under Panchayat GF-2026-27 | ||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small boulders and hard gravelly soil as per SS 20B. | 3.88 | Cum | 246.52 ₹956.5 | 246.52 ₹956.5 | 114.61 ₹444.69 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyence of all materials and labour charges etc. completed | 0.64 | Cum | 5,150 ₹3,296 | 5,200 ₹3,328 | 4,693.11 ₹3,003.59 Lowest |
| 4.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum. | 19.54 | Cum | 6,100 ₹1,19,194 | 6,300 ₹1,23,102 | 5,961.34 ₹1,16,484.58 Lowest |
| 5.00 | Cost and Supplying of GI Squre Tube Pipe the fixing the Iteam including charges | 612.42 | Kgs | 101 ₹61,854.42 | 101 ₹61,854.42 | 86.9 ₹53,219.3 Lowest |
| 6.00 | Supplying and fixing colour galvalume sheet roof of steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. | 73.5 | Sqm | 930 ₹68,355 | 950 ₹69,825 | 782.1 ₹57,484.35 Lowest |
| 7.00 | Providing Name Board Charegs | 1 | Each | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest | 1,042.8 ₹1,042.8 |
| 8.00 | Providing Photo Charegs | 1 | Each | 500 ₹500 | 500 ₹500 | 434.5 ₹434.5 Lowest |
| 9.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | 45,928.07 ₹45,928.07 | 46,901.87 ₹46,901.87 | 41,780.49 ₹41,780.49 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,400
Closing Date
22 Sept 2026, 3:00 pmClosed
The BDO (VP), Madhanur
The BDO (VP), Madhanur
Tirupathur District - Construction of Ecart Shed Near Kailasagiri Panchayat office in Kailasagiri Panchayat at Madhanur Under Panchayat GF-2026-27
2026_RDTN_701788_1
B1/01/2026
Open Tender
Civil Works
Item Rate
The BDO (VP), Madhanur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,400
Yes
23 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Tirupathur District - Construction of Ecart Shed Near Kailasagiri Panchayat office in Kailasagiri Panchayat at Madhanur Under Panchayat GF-2026-27 | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small boulders and hard gravelly soil as per SS 20B. | 3.88 | Cum | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyence of all materials and labour charges etc. completed | 0.64 | Cum | - | - |
| 4 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum. | 19.54 | Cum | - | - |
| 5 | Cost and Supplying of GI Squre Tube Pipe the fixing the Iteam including charges | 612.42 | Kgs | - | - |
| 6 | Supplying and fixing colour galvalume sheet roof of steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. | 73.5 | Sqm | - | - |
| 7 | Providing Name Board Charegs | 1 | Each | - | - |
| 8 | Providing Photo Charegs | 1 | Each | - | - |
| 9 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | - | - |
stage.html
html • 0.02 MB
finance_843603.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.61 MB
Tendernotice_2.pdf
PDF • 0.53 MB
BOQ_843603.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .