Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC NADIA KRISHNA NAGAR PATRA MARKET 20 MM GHOSH STREET | KRISHNA NAGAR | NADIA | ₹2.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 LRejected-Finance BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | ₹2.4 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹2.5 LRejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | ₹2.5 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | B T PROJECTS PRIVATE LIMITED H1 | M/S.S.S.ENTERPRISE H2 | ABHISEK ENGINEERING CONCERN H3 |
|---|---|---|---|---|---|---|
| 1.00N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1% | ||||||
| 2.00 | Carrying charges of electrical motor driven air compressor with oil tank 50mm dia hose pipe from Sagar store to worksite time to time at different location as per direction | 2 | Sets | 661 ₹1,322 | 658 ₹1,316 | 659 ₹1,318 |
| 3.00 | Lowering the hose pipe 150 ft from the tube well and connection of air compressor delivery pipe as per direction in different location | 2 | Sets | 1,337 ₹2,674 | 1,331 ₹2,662 | 1,312.3 ₹2,624.60 |
| 4.00 | Running and maintenance and guarding of 30 HP electric motor driven air compressor by engaging of skilled mechanic and unskilled labour continue running 6 hrs per day and guarding 24hrs basis[air compressor supplied by department] [ 2 Nos. x 17 Days] I .e. 34 unit | 34 | Units | 737 ₹25,058 | 735 ₹24,990 | 723.3 ₹24,592.20 |
| 5.00 | Running of 40 BHP diesel engine driven generator set including supply of diesel oil , lubricants and sundry materials etc for power supply of electrical motor driven air compressor of 17 days x 6hrs x 2 Nos. | 204 | Hrs | 553 ₹1.1 L | 550 ₹1.1 L | 542.75 ₹1.1 L |
| 6.00 | Carrying charges of electric driven compressor with fuel tank and all other materials from work site to store after complete the job including loading and unloading all complete. | 2 | Sets | 200 ₹400 | 199 ₹398 | 196.5 ₹393 |
| 7.00 | Washing the tube well by bucket wash system with the help of 1.5” dia. G.I. Pipe, check valve and other materials on hire basis incl. lowering the tube well by engaging – skilled and unskilled labour with supply of chemicals and other necessary materials required to complete the work as per direction of E.I.C. | 2 | Nos | 1,604 ₹3,208 | 1,597 ₹3,194 | 1,574 ₹3,148 |
| 8.00 | Making delivery line connection with fitting fixing of sluice valve, reflux valve etc. incl. supply of nuts & bolts, rubber insertion etc. all complete. | 2 | Sets | 401 ₹802 | 399 ₹798 | 393.45 ₹786.90 |
| 9.00 | Carrying of submersible pump set, column pipe, valves and specials from Ganga Sagar Store to work site for installation at Kachuberia new tube well and back after mela period as per direction of EIC. | 2 | Item | 4,627 ₹9,254 | 4,607 ₹9,214 | 4,539 ₹9,078 |
| 10.00 | Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department) | 2 | Item | 3,410 ₹6,820 | 3,395 ₹6,790 | 3,345 ₹6,690 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
13 Nov 2025, 9:00 amClosed
Executive Engineer ,SMD , PHED
Chetla , Kolkata-700027
Water supply arrangement from new tube well at Kachuberia in connection with Ganga Sagar Mela -2026
2025_PHED_921918_6
WBPHE/EE/SMD/NIeT-33 of 2025-26
Open Tender
MISC ELECTRICAL WORKS
60 days
Kachuberia, Sagar, South 24 Pgs
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
25 Mar 2026
24 Oct 2025
15 Nov 2025
24 Oct 2025
13 Nov 2025
24 Oct 2025
Amount
Carrying charges of electrical motor driven air compressor with oil tank 50mm dia hose pipe from Sagar store to worksite time to time at different location as per direction
Lowering the hose pipe 150 ft from the tube well and connection of air compressor delivery pipe as per direction in different location
Running and maintenance and guarding of 30 HP electric motor driven air compressor by engaging of skilled mechanic and unskilled labour continue running 6 hrs per day and guarding 24hrs basis[air compressor supplied by department] [ 2 Nos. x 17 Days] I .e. 34 unit
Running of 40 BHP diesel engine driven generator set including supply of diesel oil , lubricants and sundry materials etc for power supply of electrical motor driven air compressor of 17 days x 6hrs x 2 Nos.
Carrying charges of electric driven compressor with fuel tank and all other materials from work site to store after complete the job including loading and unloading all complete.
Washing the tube well by bucket wash system with the help of 1.5” dia. G.I. Pipe, check valve and other materials on hire basis incl. lowering the tube well by engaging – skilled and unskilled labour with supply of chemicals and other necessary materials required to complete the work as per direction of E.I.C.
Making delivery line connection with fitting fixing of sluice valve, reflux valve etc. incl. supply of nuts & bolts, rubber insertion etc. all complete.
Carrying of submersible pump set, column pipe, valves and specials from Ganga Sagar Store to work site for installation at Kachuberia new tube well and back after mela period as per direction of EIC.
Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department)
Running of submersible pump sets at tube well by supplying skilled operating staff as per direction From 01-01-2026 to 17-01-2026= 17 days x 20 Hrs. x 2 nos.
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 01-01-2026 to 17-01-2026 [for 2 Nos. Machine]
Withdrawing of submersible pump motor set after mela period from the tube well by supplying necessary Tools on hire basis and skilled labour as per direction of EIC.
Guarding arrangement of the whole installation of the above item for the entire period round the clock from 01-01-2026 to 17-01-2026
M/S.S.S.ENTERPRISE (BID ID -7331574)
ABHISEK ENGINEERING CONCERN (BID ID -7341406)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_2182441.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid