Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.7 L+₹43,451.71 (33.6%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.0 L+₹68,598.48 (53.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.0 L+₹70,597.02 (54.5%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
3 Jul 2026, 6:00 pmClosed
XEN REW JAMMU
OFFICE OF THE XEN REW JAMMU
Construction of Lane/Drain from Krishan Lal house to Transformer ward no. 1 Pyt. Sarora Block Marh under scheme CDF for the year 2026-27
2026_RDPR_313798_1
eNIT No.82-REWJ of 2026-27 Dated 27-06-2026 (2nd Call)
Open Tender
Civil Works
Percentage
30 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹4,000
4 Jul 2026
27 Jun 2026
4 Jul 2026
27 Jun 2026
3 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in A.K.O.S. | 7.35 | cum. | 479.2 | ₹3,522.12 |
| 2 | P/L in position Cement conc. (1:5:10) 1 cement:5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 9.7 | cum. | 4,826.5 | ₹46,817.05 |
| 3 | P/L in position Cement conc. (1:3:6) 1 cement:3fine sand:6graded crushed stone agg. 20 mm for foundation excluding the cost of centring & shuttering all work upto plinth level. | 5.25 | cum. | 5,733.6 | ₹30,101.4 |
| 4 | Centring & shuttering including strutting, propping etc. and removal of the formwork.Foundtion & Plinth | 27.5 | sqm. | 286.35 | ₹7,874.63 |
| 5 | Providing and Laying 60mm thick P.Block M-30 grade made by block making machine with strong vibratory compaction and of approved size and design | 125.5 | sqm. | 816.15 | ₹1,02,426.83 |
| 6 | Carriage of bajree aggregate and Sand 15 KM by MT | 22.62 | cum. | 279.04 | ₹6,311.88 |
| 7 | provision for display board | 1 | nos | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1015768.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .