Tender Value
₹84.4 L
EMD Value
₹7.2 L
Closing Date
12 Oct 2026, 2:00 pm
Executive Officer
Nagar Palika Parishad Bhinga, District Shravasti Pincode 271831
Ward No-09 Me Bahraich Bhinga Marg Per Pramod Nishad Ke Makan Se Awashyak Sambandh Gali Hote Hue Ramdarshan Ke Makan Tak CC Marg Ewm Nali Nirman Kary.
2026_DOLBU_1188265_1
273/NPP Bhinga/E-Tender/2026-27 Date 18-09-2026
Open Tender
Civil Works
Percentage
180 days
BHINGA
2 documents required · 2 mandatory
₹8,440
EO
₹7.2 L
21 Sept 2026
21 Sept 2026
12 Oct 2026
21 Sept 2026
12 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance and other unforeseen works | 1 | Job | 45,000 | ₹45,000 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.15.7.4 In cement mortar | 104.65 | cum | 1,559.57 | ₹1,63,209.15 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 218.75 | cum | 197.05 | ₹43,104.05 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 39.38 | cum | 1,607.68 | ₹63,302.35 |
| 5 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded Brick aggregate 40 mm nominal size) | 61.25 | cum | 5,156.68 | ₹3,15,846.9 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth Cement mortar 1:4 (1 cement : 4 coarse sand) | 24.15 | cum | 5,579.58 | ₹1,34,746.91 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 136.5 | cum | 6,847.63 | ₹9,34,701.87 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 910 | sqm | 557.45 | ₹5,07,283.87 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars | 133.94 | qtl | 8,107.47 | ₹10,85,919.6 |
| 10 | Excavating, supplying, stacking and filling of local earth by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides offoundation etc. complete for all lift. | 321.56 | cum | 530.28 | ₹1,70,517.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.01 MB
BOQ_2238375.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .