Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7.2 L
EMD Value
₹14,500
Closing Date
27 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Aper mukhya Adhikari
Aper mukhya Adhikari Zila Panchayat Sonbhadra
ZILANIDHI
2026_UPPRD_1204541_1
743/NA/ZP SON/2026 -27-DATE 29 OCT 2026
Open Tender
Civil Works
Percentage
180 days
sonbhadra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,016
AMA Zila Panchyat Sonbhadra
₹14,500
6 Nov 2026
6 Nov 2026
27 Nov 2026
6 Nov 2026
27 Nov 2026
6 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CExcavation in foundation in soil mixed with moorum/kanker/B.C soil etc. requiring the use of special T&P such as pickaxe, subbals etc. including lift up to 1.50 M and lead up to 30 M complete as per direction of E/I. and as per S.I. No. 252 | 27 | M³ | 128 | ₹3,456 |
| 2 | Filling in Foundation | 40.22 | M³ | 159.9 | ₹6,431.18 |
| 3 | P.C.C with cement, coarse sand and 40 mm gauge stone ballast in the proportion of 1:4:8 respectively in foundation & plinth including cost of material, labour, T&P etc. required for proper completion of the work & as per S.I. No. 280 | 18.39 | M³ | 3,400 | ₹62,526 |
| 4 | R.C.C (1:1.5:3) For Footing and Column | 7.61 | M³ | 9,600 | ₹73,056 |
| 5 | R.C.C (1:1.5:3) For Plinth Beam and lintel Beam | 6.78 | M³ | 9,319 | ₹63,182.82 |
| 6 | R.C.C (1:1.5:3) For Slab and Seat | 12.14 | M³ | 8,627 | ₹1,04,731.78 |
| 7 | Brick Massonary with cement and coarse sand mortar in the proportion of 1:4 respectively in foundation & plinth including cost of all material, labour, T&P etc. required for proper completion of the work. | 11.26 | M³ | 7,730.1 | ₹87,040.93 |
| 8 | Supply fitting and placing MS bar reinforcement in supperstructure complete as per drawing and techanical specificatin Clauses 1002. | 23.33 | M³ | 8,525.6 | ₹1,98,902.25 |
| 9 | 12 mm thick cement Plaster | 74.05 | M³ | 161 | ₹11,922.05 |
| 10 | 25 mm Thick (1:2:4) floor | 165.69 | M³ | 345 | ₹57,163.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.45 MB
BOQ_2281543.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .