| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 CrAccepted-AOC | ₹28.4 Cr Quoted ₹34.7 Cr | L1 | Accepted-AOC Being the L1 |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹21.9 Cr
EMD Value
₹43.8 L
Closing Date
21 Nov 2023, 3:00 pmClosed
Superintending Engineer - Cum - HOD
Electricity Department, No. 137, NSC Bose Rd, Puducherry - 1.
Survey, Design, Supply, Installation, Testing and Commissioning of energy efficient DTs of various capacities and its associated HT/LT line, UG /AB cables and HVDS works, in all four regions of U.T. of Puducherry under RDSS.
2023_EDHD_13018_1
RFB 01/SE-HOD/EHV/RDSS/DT/2023-24
Open Tender
Electrical Works
455 days
U.T. of Puducherry
Please refer Tender Document Part - I Commercial Terms and condition document Section -2
3 documents required · 3 mandatory
₹5,900
Drawing and Disbursing Officer, EHV Div, ED Pdy
₹43.8 L
O/o Superintending Engineer - Cum - HOD
9 Sept 2024
23 Jun 2023
22 Nov 2023
23 Jun 2023
21 Nov 2023
23 Jun 2023
23 Jun 2023 - 11 Jul 2023
4 Jul 2023
Amount
Total Price Schedule No. 1
Supply of Plant and Equipments/ materials
Total Price Schedule No. 2
Installation / Erection, testing and commissioning Charges
Description of Work / Item(s)
New 22KV single circuit over head line ( for provision of new DTs)
9.144 Mtrs RCC pole.
42 feet RSJ pole
Base Plates for RCC poles
Base Plates for RSJ poles
GI Back Clamps
GI 5.5' V Cross Arm
GI HT Top insulator fittings
22 KV pin insulators with pin
GI Tapping channel cross arm 5.5'
GI Doubel channel cross arm 5.5'
11KV strain disc insulator (including metal parts) (2 nos= 1 set)
GI D.P. cross arm 10' centre
GI Cross bracing set 10' centre
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Raccoon ACSR Conductor 7/4.09 mm
Earthing (Coil) and other accessaries (complete set for each pole)
GI Bolts, Nuts and Binding wire etc.(complete set for each pole)
Name board & Cation/ Danger board
New 11 KV over head line ( for provision of new DTs, for HVDS)
9.144 Mtrs RCC pole.
Base Plates
GI Back Clamps
GI 5' V Cross Arm
GI HT Top insulator fittings
11 KV pin insulators with pin
GI Tapping channel cross arm
GI Doubel channel cross arm
11 KV strain sets
GI D.P. cross arm 10' centre
GI Cross bracing set 10' centre
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
7/4.09 mm ACSR (Raccoon)
Earthing (Coil) and other accessaries (complete set for each pole)
GI Bolts, Nuts and Binding wire etc.(complete set for each pole)
Name board & Caution/ Danger board
New LT over head S/C line with 3.35 & 2.09 conductors ( for provision of new DTs, for HVDS)
7.32 mtrs RCC pole
Base Plates
GI Back Clamps
GI LT 3 phase cross arms (Channel)
GI LT 1 phase for street light feeder fittings set
LT pin insulator with pin
Earthing device
GI knobs
LT shackle with hardware set
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair) (all GI)
Guy insulators
7/3.35 mm ACSR
7/2.09 mm ACSR
Distribution box with pole mounting arrangements, 3 phase, (1-incomming, 4 out going)
PVC Insulated wire 16/25 Sqmm for line to DB connection with suitable connectors for main line tapping and copper lugs/ ferruiles for DB
Earthing (Coil) and other accessaries (complete set for each pole)
3 phase Line spacer/ line seperator(complete set for each pole)
GI Bolts, Nuts and Binding wire etc.(complete set for each pole)
Name board & Caution/ Danger board
New 11KV ABC system
9.144 Mtrs RCC pole.
Base palte
Single core removable & re-use TEE/straight Joints for 11KV ABC
Special channel GI cross arm 2.4m set for fixing the TEE with GI Bolt & Nuts
11KV ABC termination Kits individual for 3 phase of size 150sq.mm
Heat Shrinkable tube
Suspension Clamp Assembly suitable for 11KV ABC
Dead End Clamp/Anchor Clamp Assembly including brackets, pole clamps (all GI)
Stainless steel strap
Stainless steel buckles
Spiral Earthing set with all accessaries ( complete set for each poles)
Earth connector
End cap for 3x95+70 Sqmm, 3x150+95 sqmm ABC cables. 50% qty each
Stay Set Complete
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the messenger wire
9KV, 5kA surge arrestor
Cable ties U V Plast heavy duty, 250mm long
Miscellaneous materials such as steel grip tape, kerosine, waste,soap,etc
11 kV Class 3 Phase Aerial Bunched Cable of size 3x95+1x70 Sqmm (insulated Messenger)
11 kV Class 3 Phase Aerial Bunched Cable of size 3x150+1x95 Sqmm (insulated Messenger)
GI Bolts, Nuts and Binding wire etc.(complete set for each pole)
Name board & Caution/ Danger board
New LT ABC system
9.144 Mtrs RCC pole.
Distribution box with pole mounting arrangements, 3 phase, (1-incomming, 4 out going)
Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - for DB connection from main ABC to DB
Piercing connector suitable for 16 Sqmm Street Light Connections
Piercing connector for ABC to ABC Tee connection
Suspension Clamp Assembly including pole clamps
Dead End Clamp/Anchor Clamp Assembly including brackets, pole clamps suitable for LT ABC
GI Universal Hook, Bolts & nuts
T-connector for 95 sqmm, 70 sqmm ( 50% qty each)
Pre insulated Cable Straight thru' joint kits suitable for 95 Sqmm, 70 sqmm messenger, 16 sqmm street light ABC cable)(Each one comprising total 3 nos= 1set)
Pre insulated Cable Straight thru' joint kits suitable for 70 Sqmm, 50 sqmm messenger, 16 sqmm street light ABC cable)(Each one comprising total 3 nos= 1set)
Pre-Insulated lugs-CPTAU for 95 Sqmm, 70 sqmm ( 50% each)
End cap for 95sqmm, 70 sqmm(50% qty each) cable
Stay Set Complete
PVC Insulated wire 16/25 Sqmm for ABC to DB connection
Earthing (Coil) and other accessaries (complete set for each pole)
Cable tie (each packet contains 100 nos)
Satellite connectors for consumer connection
Insulation tape (red / yellow / black)
Staiinless Steel strap
Stainless steel Buckles
1.1 kV Class 3 Phase Aerial Bunched Cable of size 3x50 + 1x16 + 1x35 Sqmm insulated messenger
1.1 kV Class 3 Phase Aerial Bunched Cable of size 3x70 + 1x16 + 1x50 Sqmm insulated messenger
1.1 kV Class 3 Phase Aerial Bunched Cable of size 3x95 + 1x16 + 1x70 Sqmm insulated messenger
GI Bolts, Nuts and Binding wire etc.(complete set for each pole)
Name board & Caution/ Danger board
Provision of New DTs - New 11KV 630KVA DTs associated RMU switch gears and HT/LT cable laying works
630 kVA, 11/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Level 2, Distribution Transformers with BIS certification as per IS 1180/2014(Part-I)
11 KV, 3 Pole, Modular extensible type outdoor SCADA compatible SF6 insulated Ring main units comprising of 4 Way Ring Main Units with 1 Potential Transformer and 1 FRTU and MODEM and CTs (3 Nos of Load break switch and 1 No of Circuit Breaker) and allied accessories as per the tender specifications.
Supply and delivery of Lucy Electric Make 11 KV, 1 Pole, Modular extensible type outdoor SCADA compatible SF6 insulated Ring main units comprising of 1 Way Ring Main Units for coupling with the existing Lucy Electric Make 11KV RMUs
3 core 95 sq.mm XLPE insulated Armoured Screened Type 11KV Al UG cable for interconnections between RMUs and DTs with in the RMS yards.
3 core 400 sq.mm XLPE insulated Armoured Screened Type 11KV Al UG cable
Heat shrinkable end termination suitable for 3 core 400 sq.mm XLPE insulated Armoured Screened Type 11KV Al UG cable for providing termination at the proposed RMU side terminations
Heat shrinkable straight through joint suitable for 3 core 400 sq.mm XLPE insulated Armoured Screened Type 11KV Al UG cable for
400 Sqmm XLPE Insulated (HEAVY DUTY) Armoured PVC Sheathed 3 ½ core 1100V Al UG cable for connecting the DT LT side with SS pillar Boxes in the yard and arround it.
Heat shrinkable indoor end termination suitable for 3 core 95 sq.mm XLPE insulated Armoured Screened Type 11KV Al UG cable for providing termination at the proposed RMU side Circuit Breakers.
Heat shrinkable Boot type indoor end termination suitable for 3 core 95 sq.mm XLPE insulated Armoured Screened Type 11KV Al UG cable for providing termination at the proposed DT's HT side.
800Amps 6 way LT Pillar boxes with 4 nos of CTs of appropriate capacities for 630KVA DT's LT side interconnections with provision for mouting Smart Trivector Energy meter and modem inside this Pillar box with provision for mounting antena outside the pillar box.
Pipe in Pipe Earth Electrode with chemical back fill compound and FRP cover for earthing the CSS and its equipments (confirming to IS 3043: 1987)
50 x 6mm GI flat (with necessary bolt&nuts) for linking various equipments with the earth pits
150mm dia C.I Pipe confirming to relevant Standards for general use.
200 mm HDPE pipe for laying under ground for drawing the 11KV 400 sqmm UG Cable through it
Name board & Caution/ Danger board
Provision of New DTs - New 11KV 315 KVA DTs
9.144 Mtrs RCC pole.
Base Plates
Transformer structure materials including of structure clamps (all GI)
11 KV AB switch with PT insulator
11 KV HG fuse set (with 6 Nos. pin & pin insulator)
11 KV LAs
Structure Earthing
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire, stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 2x9 KVAR unit with fittings
GI Bolts, Nuts and Binding wire etc.
315kVA, 11/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Distribution Transformers
Name board & Cation/ Danger board
Anti-Climbing Device GI Barbed Wire Lumpsum
Provision of New DTs - New 22 KV 315 KVA DTs
9.144 Mtrs RCC pole.
Base Plates
Transformer Double pole structure materials including of structure clamps ( all GI)
22 KV AB switch with PT insulator
22 KV HG fuse set with 6 Nos.pin & pin insulators
22 KV LAs
Structure Earthing
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 2x9 KVAR unit with fitting
GI Bolts, Nuts and Binding wire etc.
Name board & Cation/ Danger board
Anti-Climbing Device GI Barbed Wire Lumpsum
315kVA, 22/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Distribution Transformers
Provision of New DTs - New 11 KV 200 KVA DTs
9.144 Mtrs RCC pole.
Base Plates
Transformer Double pole structure materials including of structure clamps ( all GI)
11 KV AB switch with PT insulator
11 KV HG fuse set (with 6 Nos. pin & pin insulator)
11 KV LAs
Structure Earthing (Complete set for each DP
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 2x9 KVAR unit
GI Bolts, Nuts and Binding wire etc.
Name board & Cation/ Danger board
Anti-Climbing Device GI Barbed Wire Lumpsum
200kVA, 11/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Distribution Transformers
Provision of New DTs - New 22 KV 200 KVA DTs
9.144 Mtrs RCC pole.
Base Plates
Transformer Double pole structure materials including of structure clamps (all GI)
22 KV AB switch with PT insulator
22 KV HG fuse set with 6 Nos.pin & pin insulators
22 KV LAs
Structure Earthing (Complete set for each DP
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 2x9 KVAR unit
GI Bolts, Nuts and Binding wire etc.
Name board & Cation/ Danger board
Anti-Climbing Device GI Barbed Wire Lumpsum
200kVA, 22/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Distribution Transformers
Provision of New DTs -New 11 KV 63 KVA DTs for HVDS
9.144 Mtrs RCC pole.
Base Plates
Transformer Double pole structure materials including of structure clamps ( all GI)
11 KV AB switch with PT insulator
11 KV HG fuse set (with 6 Nos. pin & pin insulator)
11 KV LAs
Structure Earthing (Complete set for each DP
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 9 KVAR unit
GI Bolts, Nuts and Binding wire etc.
Name board & Cation/ Danger board
Anti-Climbing Device GI Barbed Wire Lumpsum
63 KVA,11 KV /433Volts Energy Efficient Distribution Transformer
Replacement of non star rated DTs into Star rated DTs
9.144 Mtrs RCC pole.
Base Plates
11 KV AB switch with PT insulator
22 KV AB switch with PT insulator
Replacement of 11 KV 315 KVA DTs
315kVA, 11/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Distribution Transformers
Transformer structure materials including of structure clamps ( all GI)
11 KV HG fuse set (with 6 Nos. pin & pin insulator)
11 KV LAs
Structure Earthing (Complete set for each DP
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 2x9 KVAR unit
GI Bolts, Nuts and Binding wire etc.
Writing of name board and Caution/Danger Board
Anti-Climbing Device (12mtrs/1Kg GI Barbed Wire Lumpsum
Replacement of 22 KV 315 KVA DTs
315kVA, 22/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Distribution Transformers
Transformer structure materials including of structure clamps ( all GI)
22 KV HG fuse set with 6 Nos.pin & pin insulators
22 KV LAs
Structure Earthing (Complete set for each DP
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 2x9 KVAR unit
Bolts, Nuts and Binding wire etc.
Writing of name board and Caution/Danger Board
Anti-Climbing Device (12mtrs/1Kg GI Barbed Wire Lumpsum
Replacement of 11 KV 200 KVA DTs
200kVA, 11/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Distribution Transformers
Transformer structure materials including of structure clamps ( all GI)
11 KV HG fuse set (with 6 Nos. pin & pin insulator)
11 KV LAs
Structure Earthing (Complete set for each DP
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 2x9 KVAR unit
GI Bolts, Nuts and Binding wire etc.
Writing of name board and Caution/Danger Board
Anti-Climbing Device (12mtrs/1Kg GI Barbed Wire Lumpsum
Replacement of 22 KV 200 KVA DTs
200kVA, 22/0.433 KV, 3 phase, OIL Immersed, Air Natural (ONAN) Energy Efficient, Distribution Transformers
Transformer structure materials including of structure clamps ( all GI)
22 KV HG fuse set with 6 Nos.pin & pin insulators
22 KV LAs
Structure Earthing (Complete set for each DP
Pipe earthing and allied acessaries and materials confirming to IS 3043. GI Pipe shall be 40mm dia and 3000 mm long (GI pipe congirming to IS 1161) complete set and making earth grid using 50x6mm GI Flat and riser as required for earthing the DT and equipments(6 nos electrods and acessaries complete= 1 set)
Stay set complete incl. GI wire (5kg), stay plate & stay clamp (pair)
Guy insulators
Jumpering materials copmlete set.
L.T. LAs
L.T. open type fuse units (630Amps HRC fuse base)with 6 Nos. LT pin & insulators
LT fixed capacitor 2x9 KVAR unit
GI Bolts, Nuts and Binding wire etc.
Description of Work / Item(s)
Erection, testing and Commissioning of New 22 KV lines
Survey, route alignment & pole spotting, preparation of survey report with route maps and obtaining approval of Electricity Department.
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 9.144 mtrs RCC poles
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 42 feet RSJ poles
Erection of 9.144 Mtrs RCC poles in the excavated pole pits for 22 KV overhead line by providing and installing base plate, Earthings, pole numbering including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection of 42 feet RSJ poles in the excavated pole pits for 22 KV overhead line by providing and installing base plate, Earthings, pole numbering including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing & commissioning of pre-fabricated GI materials items on the following poles like V cross arm or any other cross arms as requierd, brackets, all clamps and supports, GI Nuts, bolts & washers as required for mounting the pin insulators or strain discs insulators, as the case may be, as requiered per site conditions which also includes all other civil and other materials, labor and transport for 9.144 Mtrs RCC poles
Erection, testing & commissioning of pre-fabricated GI materials items on the following poles like V cross arm or any other cross arms as requierd, brackets, all clamps and supports, GI Nuts, bolts & washers as required for mounting the pin insulators or strain discs insulators, as the case may be, as requiered per site conditions which also includes all other civil and other materials, labor and transport for 42 feet RSJ poles
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing and commissioning of 22 kV Pin insulators including their hardware fittings. which also includes all other materials, labor and transport as required per site conditions.(3 nos=1set)
Erection, testing and commissioning of Disc insulators for 22KV line including their hardware fittings.which also includes all other civil and other materials, labor and transport as required per site conditions. (6 nos=1set)
Paying out, tensioning, binding of conductor and tightening of stays and stringing, testing and commissioning of 7/4.09 mm ACSR (Raccoon) Conductor including jointing sleeves, helical formed fittings, jumpering, etc as required on the 9.144mtrs RCC poles. which also includes all other materials, labour and transport as required per site conditions.
Fixing of name board wherever required
Erection, testing and Commissioning of New 11 KV lines:
Survey, route alignment & pole spotting, preparation of survey report with rout maps and obtaining approval of Electricity Department.
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 9.144 Mtrs RCC poles
Erection of 9.144 Mtrs RCC poles in the excavated pole pits for 11 KV overhead line by providing and installing base plate, Earthings, pole numbering including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing & commissioning of pre-fabricated GI materials items on 9.144 M RCC poles like V cross arm or any other cross arms as requierd, brackets, all clamps and supports, GI Nuts, bolts & washers as required for mounting the pin insulators or strain discs insulators, as the case may be, as requiered per site conditions which also includes all other civil and other materials, labor and transport.
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing and commissioning of 11 kV Pin insulators including their hardware fittings. which also includes all other materials, labor and transport as required per site conditions. (3 nos=1set)
Erection, testing and commissioning of 11 kV Disc insulators including their hardware fittings.which also includes all other civil and other materials, labor and transport as required per site conditions.(6 nos=1set)
Paying out, tensioning, binding of conductor and tightening of stays and stringing, testing and commissioning of 7/4.09 mm ACSR (Raccoon) Conductor including jointing sleeves, helical formed fittings, jumpering, etc as required on the 9.144 mtrs RCC poles. which also includes all other materials, labor and transport as required per site conditions.
Fixing of name board wherever required
Erection, testing and Commissioning of New 3 phase LT lnes with 1 pahse street light feeder:
Survey, route alignment & pole spotting, preparation of survey report with rout maps and obtaining approval of Electricity Department.
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 7.32 Mtrs RCC poles
Erection of 7.32 Mtrs RCC poles in the excavated pole pits for LT overhead line by providing and installing base plate, Earthings, pole numbering including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing & commissioning of pre-fabricated GI materials items on 7.32 M RCC poles like cross arm as requierd, brackets, all clamps and supports, GI Nuts, bolts & washers as required for mounting the pin insulators or strain insulators, as the case may be, as requiered per site conditions which also includes all other civil and other materials, labor and transport.
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing and commissioning of LT Pin insulators including their hardware fittings. which also includes all other materials, labor and transport as required per site conditions. (4 nos=1set)
Erection, testing and commissioning of LT shakcle insulators including their hardware fittings.which also includes all other civil and other materials, labor and transport as required per site conditions.(8 nos=1set)
Paying out, tensioning, binding of conductor and tightening of stays and stringing, testing and commissioning of 7/4.09 mm ACSR (Raccoon) Conductor including jointing sleeves, helical formed fittings, jumpering, strret light connections, mounting of Distribution boxes and termination of the DB with main line, etc as required on the 7.32 mtrs RCC poles. which also includes all other materials, labor and transport as required per site conditions.
Fixing of name board wherever required
Erection, testing and Commissioning of New 11KV Arial Bounched cable feeder:
Survey, route alignment & pole spotting, preparation of survey report with rout maps and obtaining approval of Electricity Department.
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 9.144 Mtrs RCC poles
Erection of 9.144 Mtrs RCC poles in the excavated pole pits for 11 KV Arial bunched cable feeder by providing and installing base plate, Earthings, pole numbering including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions.
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions.
Fabrication & Erection of GI materials like Channels, Angles, Flats complete (the cost inclusive of Supply of GI Nuts, Bolts,washer , etc. as required
Fixing of single suspension clamp with Eye hook
Fixing of Dead-end/Anchor clamp with eye hook
Suitable whether proof take off arrangement for the ABC cable from the DT or at the tapping point of the existing OH line
Erection of 11KV Aerial Bunched cable (3x150+1x95 Sqmm insulated Messenger +3x95+1x70 Sqmm insulated Messenger) including hoisting, stringing, jointing, sagging, tensioning & route clearance with fixing of cable end caps etc.
Erection, fixing & termination of suitable tapping arrangement along with associated accessories complete (1set= 3 nos)
Erection of Heat shrinkable termination kit along with accessories/ Erection of Heat shrinkable straight through Jointing Kit (1 complete set = 3 nos)
Erection, testing and Commissioning of pipe earthing (as per IS 3043) complete set using 40mm dia GI pipe 3000 mm long and making earth connection for messenger wire using suitable GI Flat and riser as required for 11KV ABC cable
Earthing complete with G.I. wire.
Fixing of name board wherever required
Erection, testing and Commissioning of New LT Arial Bounched cable feeder:
Survey, route alignment & pole spotting, preparation of survey report with rout maps and obtaining approval of Electricity Department.
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 7.32 Mtrs RCC poles
Erection of 7.32 Mtrs RCC poles in the excavated pole pits for LT ABC feeder by providing and installing base plate, Earthings, pole numbering including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions.
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions.
Fabrication & Erection of GI materials like Channels, Angles, Flats complete (the cost inclusive of Supply of Nuts, Bolts,washer , paints etc. as required) as per TS
Erection of 1.1 kV Aerial Bunched Conductor 3x95 + 1x16 + 1x70 Sqmm , 3x70 + 1x16 + 1x50 Sqmm and 3x50 + 1x16 + 1x35 Sqmm, including Hoisting, stringing, jointing, sagging, tensioning & route clearance with fixing of cable end caps etc. and providing whether proof take-off arragements from DTs or the tapping points of the existing lines
Fixing of Suspension clamp/Dead-end/ Anchor clamp with Pole bracket and steel strap
Erection of Three Phase Distribution Box on the poles and thier termination with main ABC cable with insulation Piercing connectors.
Fixing of Insulation Piercing Connector for Street Light Connection including connection with AB Cable.
Staying complete (LT)
Earthing complete with earth spike and G.I. wire.
Fixing of name board wherever required
Erection, testing and Commissioning of New 11KV 630KVA DTs associated RMU switch gears and HT/LT cable laying works
Installation, testing and commissioning of 11KV 4 way RMU on the plinth foundation . Which also includes local transportation, Crane charges, construction of suitable civil plinth foundation to house the 11 KV 4 way RMU, which also includes supply of all civil and other materials and labour
Installation, coupling by bus extension, testing and commissioning of Lucy Electric Make 11 KV, 3 Pole, Modular extensible type outdoor SCADA compatible SF6 insulated Ring main units comprising of 1Way Ring Main Unit ( 1 Nos of Load Break switch) on the plinth foundation Which also includes local transportation, Crane charges, construction of suitable civil plinth foundation by extension of existing foundation to house the LBS unit, which also includes supply of all civil and other materials and labour.
Installation, testing and commissioning of 11/.433 KV, 630KVA DT on the plinth foundation. Which also includes local Transportations, Crane charges, construction of suitable civil plinth foundation to house the 11/.433 KV, 630KVA DT which also includes supply of all civil and other materials and labour
Installation, testing and commissioning of 800Amps 6 way LT SS Pillar Boxes on the plinth foundation. Which also includes local transportations, Crane charges, Cable terminations(Supply of ferrules included), construction of suitable civil plinth foundation, which also includes supply of all civil and other materials and labour
Laying of 3 core 95 sq.mm XLPE insulated Armoured Screened type 11KV Al UG cable with end looses within the proposed RMS yards trenches for providing interconnections between RMUs and DTs. Suitable support with clamping arrangements to be provided on the DT side cable to be raised for the terminations
Laying (2 runs for each pillar boxes) of 400 Sqmm XLPE Insulated (HEAVY DUTY) Armoured PVC Sheathed 3 ½ core 1100V Al UG cable in the cable trench within the yard and its allied terminations with Al. lugs (Supply of 400sqmm long barrel Alluminium Lugs and insulation tape included) for interconnection between DT's LT side and LT SS Pillar boxes in the yard and around it. Suitable support with clamping arrangements to be provided on the DT side cable to be raised for the terminations.
Labour for provision of Cable end termination (indoor and out door depending on the site conditions) for 3 core 95 sq.mm XLPE insulated Armoured Screened type 11KV Al UG cable at the RMUs Breaker sides and at DT HT side (for interconnection from RMUs to DTs) at various proposed RMS yards.
Laying of one run of HDPE Pipe of size 200 mm dia direct in ground and drawing of 3 core 400 sq.mm XLPE insulated Armoured Screened Type 11KV Al UG cable through the laid HDPE pipe between various yards to yards for providing 11KV power supply. Which includes, excavation of trench of size 0.5 m (W) x 1.2 m (D), sand cushioning and refilling the trench, disposal of unserviceable materials as required in Bituminous Road or concreate roads as per site conditions (supply of sand included). Provision of 2 runs of end loose at each end of cable terminations. middel ring pits of suitable size to be provided wherever required to house 3 runs of UG cable rings and the draw pits to be provided wherever required for easing the drawl of UG cable through the HDPE pipe. Supply and provision of straight through joints in suitable size pits wherever necessary. Supply of civil and other materials, labour and transportations for the various pits to be constructed are included. Various pits with top RCC covers to be provided should be capable of withstanding continuous heavy vehicular traffics. The bottom of the pits to be hollow to prevent water stagnations. All the pits to be covered with sand. Each entry and exist hole of UG cable to be properly covered by suitable means to prevent the entry of rats or solid materials.
Labour for provision of Cable end termination for 3 core 400 sq.mm XLPE insulated Armoured Screened Type 11KV Al UG cable at the proposed RMU side (for interlinking between existing and proposed RMS yards).
Provision of Pipe in Pipe Earth Electrode with chemical back fill compound and FRP cover as required for various equipments to be erected within the yard and connecting this Earth Electrode with all the equipments (as per relevant standards) with 50 x 6m GI flat.
Design and Provision of fencing with hood, provision of HT and LT cable trenches and lighting for the 11KV RMS yard at various proposed RMS yard locations. which includes the construction of new wall of required height from the ground level around the yard, provision of fencing with wicket gate, provision of lighting. Provision of RCC slab floor in the proposewd RMS yard. Which also included supply of all the required civil and other materials and labour for these works
Fixing of name board
Erection, Testing and Commissioning of new Distribution Transformers ( 22KV 315KVA & 200 KVA capacity DTs)
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 9.144 Mtrs RCC poles for DP structre (2 pits=1set)
Erection of 9.144 Mtrs RCC poles in the excavated pole pits for 22 KV Double pole structure by providing and installing base plate, Earthings, including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions. (2 poles=1set)
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing, commissioning of Pre-fabricated GI material items like DC cross arm, back clamps, pole clamp, items mounting channels and transformer mounting channel, transformer clamping set, transformer belting set, 22KV HG fuse set, LT feedering arrangement and GI nuts, bolts & washers as required
Erection, testing & commissioning of new 22KV, 3-ph, single contact, Gang Operated, Horizantal AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete set as required
Erection, testing and commissioning of 22 kV insulator including their hardware fittings as required for DP structure
Erection, testing and Commissioning of pipe earthing (as per IS 3043) (6 nos = 1 set) using 40mm dia GI pipe 3000 mm long making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as required for DP structure. Fixing of Anti climbing device
Erection, testing and commissioning of 8 SWG GI wires as required for 22KV DP structure
Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering including PG Clamps, bi- metallic connectors, hardware etc as required for 22KV DP structure
Erection, Testing and Commissioning of 22KV, 315KVA, 200 KVA capacity Distribution Transformers with all accessories as required.
Fixing of name board
Erection, Testing and Commissioning of new Distribution Transformers ( 11KV 315KVA, 200 KVA capacity DTs)
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 9.144 Mtrs RCC poles for DP structre (2 pits=1set)
Erection of 9.144 Mtrs RCC poles in the excavated pole pits for 11 KV Double pole structure by providing and installing base plate, Earthings, including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions. (2poles=1set)
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing, commissioning of Pre-fabricated GI material items like DC cross arm, back clamps, pole clamp, items mounting channels and transformer mounting channel, transformer clamping set, transformer belting set, 11KV HG fuse set, LT feedering arrangement and GI nuts, bolts & washers as required
Erection, testing & commissioning of new 11KV, 3-ph, single contact, Gang Operated, Horizantal AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete set as required
Erection, testing and commissioning of 11 kV insulator including their hardware fittings as required for DP structure
Erection, testing and Commissioning of pipe earthing (as per IS 3043) (6 nos = 1 set) using 40mm dia GI pipe 3000 mm long, making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as required for DP structure. Fixing of Anti climbing device
Erection, testing and commissioning of 8 SWG GI wires as required for 11KV DP structure
Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering including PG Clamps, bi- metallic connectors, hardware etc as required for 11KV DP structure
Erection, Testing and Commissioning of 11KV, 315KVA, 200 KVA capacity Distribution Transformers with all accessories as required.
Fixing of name board
Erection, Testing and Commissioning of new HVDS 11KV 63KVA capacity Distribution Transformers mounted on single pole
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 9.144 Mtrs RCC poles for DP structre (2 pits=1set)
Erection of 9.144 Mtrs RCC poles in the excavated pole pits for 11 KV single pole DT structure by providing and installing base plate, Earthings, including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions. (2 poles=1set)
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions.
Erection, testing, commissioning of Pre-fabricated GI material items like cross arm, back clamps, pole clamp, items mounting channels and transformer mounting channel, transformer clamping set, transformer belting set, 11KV HG fuse set, LT feeding arrangement and GI nuts, bolts & washers as required for mounting the 63KVA DT on the single pole
Erection, testing & commissioning of new 11KV, 3-ph, single contact, Gang Operated, Horizantal AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete set as required
Erection, testing and commissioning of 11 kV insulator including their hardware fittings as required
Erection, testing and Commissioning of pipe earthing (as per IS 3043) (6 nos = 1 set) using 40mm dia GI pipe 3000 mm long, making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as required for DP structure. Fixing of Anti climbing device
Erection, testing and commissioning of 8 SWG GI wires as required
Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering including PG Clamps, bi- metallic connectors, hardware etc as required
Erection, Testing and Commissioning of 11KV, 63KVA capacity Energy efficient Distribution Transformers with all accessories on double pole structure as required.
Fixing of name board
Replacement of Existing non star rated DTs with Energy efficient DTs (22KV 315KVA & 200KVA capacity DTs)
Dismantling of existing DP structure fittings, AB switch,Distribution Transformer and other items (excluding RCC poles) from the existing Double pole structure and depositing to Employer's store and Erection, testing, commissioning of AB switch, Complete set of Pre-fabricated GI structure items/materials, 22KV HG fuse set, 22KV insulators with metal parts, LT feedering arrangement and GI nuts, bolts & washers including white washing of existing RCC pole and fixing of anti climbing device and name board as required for DP structure.
Dismantling of Distribution Transformer alone from the existing Double pole structure and depositing to Employer's store and cleaning and servicing of AB switch(supply of spars included), replacing the damaged insulators wherever required, painting of existing structure fittings/materials with red oxide and aluminium paints, white washing of RCC poles and providing GI nuts, bolts & washers as required for 22KV DP structure
Dismantling of total existing double pole structure, fittings, AB switch and the Distribution Transformer and depositing to Employer's store
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 9.144 Mtrs RCC poles for DP structre(2 pits= 1 set)
Erection of 9.144 Mtrs RCC poles in the excavated pole pits for 22 KV Double pole structure by providing and installing base plate, Earthings, including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions. (2 poles=1 set)
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions and for each DP structure.
Erection, testing, commissioning of Pre-fabricated GI material items like DC cross arm, back clamps, pole clamp, items mounting channels and transformer mounting channel, transformer clamping set, transformer belting set, 22KV HG fuse set, LT feedering arrangement and GI nuts, bolts & washers as required
Erection, testing & commissioning of new 22KV, 3-ph, single contact, Gang Operated, Horizantal AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete set as required
Erection, testing and commissioning of 22 kV insulator including their hardware fittings as required for DP structure
Erection, testing and commissioning of 8 SWG GI wires as required for 22KV DP structure
Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering including PG Clamps, bi- metallic connectors, hardware etc as required for 22KV DP structure
Erection, testing and Commissioning of pipe earthing (as per IS 3043) (6 nos = 1 set) using 40mm dia GI pipe 3000 mm long, making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as required for DP structure. Fixing of Anti climbing device
Erection, Testing and Commissioning of 22KV class 315KVA and 200KVA capacity Energy efficient Distribution Transformers with all accessories as required.
Fixing of name board
Replacement of Existing non star rated DTs with Energy efficient DTs (11KV 315KVA & 200KVA capacity DTs)
Dismantling of existing DP structure fittings, AB switch,Distribution Transformer and other items (excluding RCC poles) from the existing Double pole structure and depositing to Employer's store and Erection, testing, commissioning of AB switch, Complete set of Pre-fabricated GI structure items/materials, 22KV HG fuse set, 22KV insulators with metal parts, LT feedering arrangement and GI nuts, bolts & washers including white washing of existing RCC pole and fixing of anti climbing device and name board as required for DP structure.
Dismantling of Distribution Transformer alone from the existing Double pole structure and depositing to Employer's store and cleaning and servicing of AB switch(supply of spars included), replacing the damaged insulators wherever required, painting of existing structure fittings/materials with red oxide and aluminium paints, white washing of RCC poles and providing GI nuts, bolts & washers as required for 22KV DP structure
Dismantling of total existing double pole structure, fittings, AB switch and the Distribution Transformer and depositing to Employer's store
Excavation of pole pit (of depth 1/6th of pole length) for the erection of 9.144 Mtrs RCC poles for DP structre(2 pits= 1 set)
Erection of 9.144 Mtrs RCC poles in the excavated pole pits for 22 KV Double pole structure by providing and installing base plate, Earthings, including cement concreting (Supply of civil materials included) etc, which also includes all other civil and other materials, labor and transport as required per site conditions. (2 poles=1 set)
Excavation of stay pit and erection of complete stay set with all accessaries and fittings with GI stay wire, binding of stay wire, by providing Guy stay insulators and provion of concreting ( Supply of civil material included). which also includes all other civil and other materials, labor and transport as required per site conditions and for each DP structure.
Erection, testing, commissioning of Pre-fabricated GI material items like DC cross arm, back clamps, pole clamp, items mounting channels and transformer mounting channel, transformer clamping set, transformer belting set, 22KV HG fuse set, LT feedering arrangement and GI nuts, bolts & washers as required
Erection, testing & commissioning of new 22KV, 3-ph, single contact, Gang Operated, Horizantal AB Switch along with Support Insulators, Base Channel down Pipe, Arcing Horns etc. complete set as required
Erection, testing and commissioning of 22 kV insulator including their hardware fittings as required for DP structure
Erection, testing and commissioning of 8 SWG GI wires as required for 22KV DP structure
Erection, testing and commissioning of ACSR Rabbit Conductor for jumpering including PG Clamps, bi- metallic connectors, hardware etc as required for 22KV DP structure
Erection, testing and Commissioning of pipe earthing (as per IS 3043) (6 nos = 1 set) using 40mm dia GI pipe 3000 mm long, making earth grid using 50x6mm GI Flat and riser and connecting risers to various equipment as required for DP structure. Fixing of Anti climbing device
Erection, Testing and Commissioning of 22KV class 315KVA and 200KVA capacity Energy efficient Distribution Transformers with all accessories as required.
Fixing of name board
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx