Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | ₹2.2 L | L1 | Accepted-AOC Work Order |
| 2 | L2₹3.5 LRejected-Finance | ₹3.5 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SAI SRI THIRUMALA CONTRACTOR L2 | SRI RANGA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 33.75 | M3 | 247 ₹8,336.25 | 247 ₹8,336.25 |
| 2.00 | Cement Concrete 1:4;8 Mix (one part cement, four part sand and eight part of aggrigate) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 1.04 | M3 | 5,087 ₹5,290.48 | 5,087 ₹5,290.48 |
| 3.00 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86
Drain | 8.1 | m2 | 460 ₹3,726 | 460 ₹3,726 |
| 4.00 | Culvert | 3.6 | M2 | 1,227 ₹4,417.20 | 1,227 ₹4,417.20 |
| 5.00 | Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 2.03 | M3 | 6,537 ₹13,270.11 | 6,537 ₹13,270.11 |
| 6.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 2 | M3 | 8,084 ₹16,168 | 8,084 ₹16,168 |
| 7.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 1,900 | kg | 155 ₹2.9 L | 89.5 ₹1.7 L |
| 8.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 2.7 | M2 | 158 ₹426.60 | 158 ₹426.60 |
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
11 Nov 2025, 3:30 pmClosed
Executive Officer
Karimangalam Town Panchayat
GF 2025 26 Construction of Culvert at Ward No 12 Government Boys School backside in Karimangalam Town Panchayat
2025_DTP_620863_1
GF 2025 26
Open Tender
Civil Works - Others
Karimangalam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,400
Yes
10 Feb 2026
7 Nov 2025
12 Nov 2025
7 Nov 2025
11 Nov 2025
7 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_742422.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid