Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC Works contract awarded |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
16 Oct 2023, 2:00 pmClosed
SE/EEDC/Erode
948, EVN Road, Erode- 638 009.
Works Contract to carry out the erection of poles, distribution transformers and allied extension works using private contractor in Town/Erode and Karungalpalayam sections Central Erode Sub division of Urban Erode Division
2023_EB_375686_1
050/23-24 DT 29.09.2023
Open Tender
Electrical and Maintenance Works
Works
365 days
Erode
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
2 Jan 2024
4 Oct 2023
16 Oct 2023
4 Oct 2023
16 Oct 2023
4 Oct 2023
Amount
Excavation f Pole pit size of 2'x2'x6' upto 27' (8.0m) pole by using JCB or Manual
Stay pit 4.5' to 5' depth by using JCB of Manual
Excavation of Pole pit size above 8Mtr PSC / RCC /RSJ pole by using JCB or Manual
Excavation of pole pit in Hard Rock requies without blasting (where houses are blasting)
Erection of RCC poles / PSC Poles upto 27" (8.0m)pole by using JCB or Manual
Erection of RCC poles / PSC Poles above 27" (8.0m)pole by using JCB or Manual
Erection of RSJ.Rail, and Fabricated poles above 9.0m pole by using JCB or Manual
Erection of Stay set complete
Fixing of HT "V" cross arms / Channel cross arms / Guarding cross arms
Fixing of LT 3 phase cross arms
Fixing of LT 1 phase cross arms
Fixing of HT /LT TI Fittings
Fixing of HT Pin Insulators 11/22 KV
Fixing of HT 11 KV stain Disc
Fixing of LT Pin Insulator
Fixing of LT Shackle with MP
Fixing of Aluminiuam Knob
Earthing of Pole with pin including burying looping and binding
Paving of Conductor, Stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/4.09 mm.
Paving of Conductor, Stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/3.35 mmACSR or 7/3.0 AAAC
Paving of Conductor, Stringing, binding, jumpering etc., complete with ACSR for both HT/LT lines with 7/2.59 mm ACSR or 7/2.50 AAAC
Structure Concreting, Concreting of poles with size (2'x2'x6') including cost of cement, jelly and sand with a mixture of 1:3:6 and platering of concrete with ratio 1:2
Sleeve Concreting, with size (2'x2'x6') including cost of excavation cement, jelly and sand with a mixture of 1:3:6 and platering of concrete with ratio 1:2 including materials
Stay Concreting of stay with size (1.5'x1.5'x3.0') including cost of 40mm cement, jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and platering of concrete portion above the ground level with ratio 1:2
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LTLAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Dismantling of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LTLAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Dismantling of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Dismantling of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Guarding arrangements with flat guarding including fixing of 2Nos. Cross arms HT/LT
Transport of poles / Materials condsuctors /DT / Metering set and other material (excluding loading and unloading Charges ) below 8.0KM
Transport of poles / Materials condsuctors /DT / Metering set and other material (excluding loading and unloading Charges ) above 8.0KM for addl. KMs (irrespective in Tonage / KM)
Loading of Metal Poles ( all size)
Loading of poles upto 8.0m PSC & RCC
Loading of poles above 8.0m PSC & RCC
Unloading of poles upto 8.0m PSC & RCC
Unloading of poles above 8.0m PSC & RCC
Unloading of Metal Poles ( all size)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading or unloading of Transformer upto 200KVA for each
Loading or unloading of Transformer above 200KVA for each
Erection of New Transformer all capacity
Replacement of failed Transformer all capacity
Loading & erection of HT Metering set
Erection of street light including fixure fitting
Erection of street light service
Fixing of New SV/MV lamp fittings
Releasing grills from RCC poles
Releasing grills from PSC poles
Releasing of single phase service and re-fixing
Releasing of three phase service and re-fixing (upto 50 HP)
Releasing of three phase service and re-fixing (above 50 HP)
Labour charges for alteration of back clamps to suit for the works
Labour charges for alteration of stay clamps to suit for the works
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of Flat
Cutting of channel
Cutting of Angle
Cutting of pipe
Dismantling of pole upto 8.0mtr
Dismantling of pole above 8.0mtr
Dismantling of 'V' x arm 4'.6"
Dismantling of LT 3 phase x arm / LT single phase x arm
Dismantling of HT/LT TI fitting
Dismanlting of 11 KV strain disc
Dismantling of 22 KV strain disc
Dismantling of 22 KV Pin Insulator
Dismantling of LT shackle
Dismantling of LT Pin Insulator
Dismantling of Aluminium knob
Dismantling of stay set
Dismantling of ACSR 7/3.35mm conductor
Dismantling of ACSR 7/2.59mm/ 7/2.11mm conductor
Dismanting of MVL / SVL fitting
Dismantling of 1x40w FTL Fitting
Dismanting of Street light service
Provision of Earth pitcollar
Fixing of Danger Board
Painting of all clamps and other materials and painting of structure pole for double pole structure
Painting of all clamps and other materials and painting of structure pole for single pole structure
Painting of all clamps and other materials and painting of structure pole for DP structure
Base Concreting of transformer structure
LT cable arrangement
Provision of Distribution Transformer Name Board
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .