Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.0 L
EMD Value
₹9,017
Closing Date
3 Jun 2026, 5:00 pmClosed
Commissioner,
Brahmapur Municipal Corporation, Brahmapur
Construction of steps and bathing ghat at Ainaa Bandha in wn - 10
2026_ORULB_129358_10
BMC(BAM)/327/2026-2027
Open Tender
Civil Works - Others
Percentage
75 days
Commissioner, Brahmapur Municipal Corporation
Please refer tender documents
2 documents required · 2 mandatory
₹4,720
₹9,017
Yes
4 Jun 2026
18 May 2026
4 Jun 2026
18 May 2026
3 Jun 2026
18 May 2026
18 May 2026 - 28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all materials, labour, T & P 5.00HP diesel pump set with POL, Pump operatoretc and de-waterng the clear water etc all complete as per the required secification and direction of EIC. | - | Hrs | 200.7 | - |
| 2 | Earth work excavation in slushy soil within initial lead of 50 m and initial lift of 1.50 m including rough dressing and breaking the clods, etc all complete as per direction of engineer- in-charge. | - | cum | 236.1 | - |
| 3 | Supply and filling the F & P with filling sand of approved quality with well watered & rammed including cost, conveyance, royalty & all taxes, etc., complete. | - | cum | 1,555.11 | - |
| 4 | SSupplying all materials, labour, T&P for C.C. (1:4:8) using 40 mm size HG HAND BROKEN metal including laying, compacting, curing, with all cost, conveyance, royalty & taxes, etc., complete. | - | cum | 5,573.23 | - |
| 5 | R.C.C work of M-20 grade with 10mm to 20mm & down grade BHG C/B chips including hoisting, laying & all cost, conveyance, royalty & taxes etc. comp. to work site as per the specification approved by the deptt. & direction of EIC. | - | cum | 6,295.38 | - |
| 6 | Supplying fitting and placing uncoated HYSD steel reinforcement including cutting bending binding and placing the steel rods in position with cost binding wire 18 to 20 gauge | - | Qntl | 9,269.08 | - |
| 7 | Rigid & smooth centering & shuttering for R.C.C. and C.C. works including false works, dismantling and removing them from the site after casting, curing including cost of materials etc complete. | - | Sqm | 251.22 | - |
| 8 | 6mm thick cement plester (1:4) to RCC surface finish smooth including all cost conveyance royalty and taxes etc. comp. | - | Sqm | 185.37 | - |
| 9 | Laterite stone masonary in CM(1:6) in F&P etc complete. | - | cum | 6,011.49 | - |
| 10 | 20mm thick C:P (1:6) over stone masonry etc complete. | - | Sqm | 303.27 | - |
stage.html
html • 0.02 MB
finance_591517.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
DTCN.pdf
Tender Documents • 2.71 MB
BOQ_591517.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .