| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.7 LAccepted-AOC | ₹22.7 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹23.7 LRejected-Finance | ₹23.7 L | 2 | Rejected-Finance L1 Lowest Tenderer can only be accepted. L2 is Rejected |
| Sl No | Description | Qty | Unit | ESWARI CONTRACTOR L2 | THILAGAVATHI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Renovation of Hostel Buidling at Puliyur Middle School of Melpattu Range | |||||
| 1.10 | Chipping the Floor Concret Roofing The Surface including All Charges | 223.98 | Square Metre | 60 ₹13,438.80 | 56 ₹12,542.88 |
| 2.00 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) | 223.98 | Square Metre | 2,200 ₹4.9 L | 2,117 ₹4.7 L |
| 3.00 | Colour Washing with best Distempering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other Old surface and including clearing,preparing the surface and etc.,complete. | 864.5 | Square Metre | 350 ₹3.0 L | 315 ₹2.7 L |
| 4.00 | Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (Old) including cost and all labour charges etc. complete | 337.82 | Square Metre | 410 ₹1.4 L | 383 ₹1.3 L |
| 5.00 | Painting two coats over Old Iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete | 92.16 | Square Metre | 250 ₹23,040 | 214 ₹19,722.24 |
| 6.00Provision For Electrical Arrangments Ground Floor & First Floor | |||||
| 6.10 | Light point (SD20) | 2 | Number | 1,338 ₹2,676 | 1,338 ₹2,676 |
| 6.20 | Fan point (SD20) | 2 | Number | 1,338 ₹2,676 | 1,338 ₹2,676 |
| 6.30 | Fan (SD110) | 2 | Number | 2,424 ₹4,848 | 2,424 ₹4,848 |
Tender Value
₹23 L
EMD Value
₹23,000
Closing Date
24 Dec 2025, 5:30 pmClosed
District Forest Officer
District Forest Office 112 Chinnakadai Street Thiruvannamalai Thiruvannamalai District. 606601
Construction and Maintenance of buildings at Forest Middle School, Puliyur of Thiruvannamalai Forest Division during 2025-26
2025_TNFD_626734_2
9266/ 2025 / D
Open Tender
Civil Works - Buildings
60 days
Puliyur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹23,000
Tiruvannamalai
29 Jan 2026
19 Dec 2025
26 Dec 2025
19 Dec 2025
24 Dec 2025
19 Dec 2025
22 Dec 2025
Amount
Renovation of Hostel Buidling at Puliyur Middle School of Melpattu Range
Chipping the Floor Concret Roofing The Surface including All Charges
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Colour Washing with best Distempering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other Old surface and including clearing,preparing the surface and etc.,complete.
Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (Old) including cost and all labour charges etc. complete
Painting two coats over Old Iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Provision For Electrical Arrangments Ground Floor & First Floor
Light point (SD20)
Fan point (SD20)
Fan (SD110)
CFL lamp (SD83)
TUBE Light Fittings (SD 88)
Renovation of Class room Building in Forest Middle School, Puliyur of Melpattu Range
Chipping the Floor Concret Roofing The Surface including All Charges
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Colour Washing with best Distempering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other Old surface and including clearing,preparing the surface and etc.,complete.
Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (Old) including cost and all labour charges etc. complete
Painting two coats over Old Iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Provision For Electrical Arrangments Ground Floor & First Floor
Light point (SD20)
Fan point (SD20)
Fan (SD110)
Plug point (SD36)
CFL lamp (SD83)
TUBE Light Fittings (SD 88)
Construction of New Toilet Building in Forest Middle School at Puliyur in Melpattu Range during 2025-26
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.
Centring Below GL
Column up to base
Roof &Roof beam
Sunshade
Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete.
RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.
Towards the cost of steel door of size 1.00 mx1.80 m including all charges etc.
Towards the cost of steel door of size 0.75mx1.80 m including all charges etc.
Towards cost and fixing of RCC Jolly of size 0.90x0.45m including cost and conveyance and labour for fixing etc
Cost & Supply For Indian Type W.C including cost and conveyance of all materials to work site and labor charges etc complete.
Cost & Supply For European Type W.C including cost and conveyance of all materials to work site and labor charges etc complete.
Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc.
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
Floor finishing with ceromic tiles of size 20cmx20cm including costand conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Painting two coat with approved quality of distemper with colour over one coat of white cement for primier coat for the base including preparing surface and all materials cost labour etc
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc.
Provision for Citizen Informantion board
Provision for Water supply and Sanitary Arrangements
Water supply
32mm pvc pipe 40ksc
32mm pvc Bend
32mm pvc Tee
32mm x 25mm pvc Reducer
25mm pvc Pipe 40ksc
25mm pvc Tap
500 Liters Hdpe Tank
Sanitary supply
110mm pvc pipe 6KSC
110mm pvc Bend
110mm pvc Tee
Calculation of SubTotal, GST and Total carried out by system automatically
Sub Total Amount for above all items
GST 18% for the above SubTotal Amount
ESWARI CONTRACTOR (BID ID -1543191)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
TenderDocumentPuliyur.pdf
Tender Documents • 1.20 MB
BOQ_758893.xls
BOQ • 0.31 MB
RetenderPuliyur.pdf
Additional Documents • 0.38 MB
Download all tender documents and submit your bid