Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 CrAccepted-AOC PATHRA BARGO RUSTAMPUR GORAKHPUR UP 273016 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273016 | L1 | Accepted-AOC AS PER UPLOADED | |
| 2 | L2₹14.9 Cr+₹1.1 Cr (7.99%)Rejected-Finance | L2 | Rejected-Finance AS PER FINANCIAL EVALUATION | |
| 3 | L3₹16.3 Cr+₹2.5 Cr (18.4%)Rejected-Finance KH NO 17 B H U NO 74A KAUSHALPURI COLONY KHARGAPUR GOMTINAGAR LUCKNOW U P | L3 | Rejected-Finance AS PER FINANCIAL EVALUATION | |
| 4 | Rejected-Technical GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | - | Rejected-Technical AS PER TECHNICAL EVALUATION | |
| 5 | Rejected-Technical 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | - | Rejected-Technical AS PER TECHNICAL EVALUATION |
| Sl No | Description | Qty | Unit | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L1 | M/s Narayan Enterprises L3 | Mittal Brothers Engineers and Contractors Bharat LLP L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 1,435.5 | Cum | 99 ₹1,42,114.5 Lowest | 110 ₹1,57,905 | 250 ₹3,58,875 |
| 2.00 | Earth work in filling to recoup the canal section including cost of materials, T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 24,298.8 | Cum | 100 ₹24,29,880 Lowest | 110 ₹26,72,868 | 150 ₹36,44,820 |
| 3.00 | Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 37,820.93 | Cum | 70 ₹26,47,465.1 Lowest | 85 ₹32,14,779.05 | 150 ₹56,73,139.5 |
| 4.00 | Plain Cement Concrete in M-15 Toe Wall, Sleepers and Top/Cut-off Wall with Coarse Sand having F.M. > 2.0, Crushed Stone dalla grit of nominal size of 4.75 mm to 20 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 4,350.01 | Cum | 9,500 ₹4,13,25,095 Lowest | 10,500 ₹4,56,75,105 | 9,500 ₹4,13,25,095 Lowest |
| 5.00 | Laying CC Block (300x600x150) in M20 Grade of Concrete with Coarse sand, Crushed Stone dalla grit, Mechanically mixed, properly compacted and placed in proper position including cost of all materials (but excluding cost of steel), iucluding labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 153.34 | Cum | 9,700 ₹14,87,398 Lowest | 10,300 ₹15,79,402 | 10,000 ₹15,33,400 |
| 6.00 | Plain Cement Concrete in M-20 Lining 125 mm thick with Coarse Sand having F.M. > 2.0, Crushed Stone dalla grit of nominal size of 4.75 mm to 20 mm, Micro polymeric fibers ,Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 34,796.78 | Sqm | 1,400 ₹4,87,15,492 Lowest | 1,800 ₹6,26,34,204 | 1,600 ₹5,56,74,848 |
| 7.00 | Providing and laying steel reinforcement including bending, binding cutting placing in position rainforcement steel including cost of binding wire with material. and other accessories required for proper completion of work. | 0.66 | MT | 70,000 ₹46,200 Lowest | 75,000 ₹49,500 | 75,000 ₹49,500 |
| 8.00 | Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,430.79 | Cum | 3,600 ₹51,50,844 Lowest | 3,800 ₹54,37,002 | 4,800 ₹68,67,792 |
| 9.00 | Supplying and laying Stone dalla Grit 4.75 to 10 mm below Cement Concrete lining with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,430.79 | Cum | 3,400 ₹48,64,686 Lowest | 3,700 ₹52,93,923 | 4,800 ₹68,67,792 |
| 10.00 | Providing & Laying LDPE Sheet on slope, below Toe Wall, and Cut Off Wall including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 41,747.81 | Sqm | 30 ₹12,52,434.3 | 35 ₹14,61,173.35 | 25 ₹10,43,695.25 Lowest |
Tender Value
Refer Docs
EMD Value
₹34.9 L
Closing Date
7 Aug 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Rehabilitation Work of damaged portion of slope lining of left and right banks from Km 48.000 to Km 49.450 of of Main Western Gandak Canal in district Kushinagar
2026_UPIDC_1170924_2
03/SE/2026-27
Open Tender
Civil Works
Item Wise
485 days
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹34.9 L
Yes
21 Oct 2026
20 Jul 2026
7 Aug 2026
20 Jul 2026
7 Aug 2026
20 Jul 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 1,435.5 | Cum | - | - |
| 2 | Earth work in filling to recoup the canal section including cost of materials, T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 24,298.8 | Cum | - | - |
| 3 | Earth work in excavation in foundation for toe wall/top wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 37,820.93 | Cum | - | - |
| 4 | Plain Cement Concrete in M-15 Toe Wall, Sleepers and Top/Cut-off Wall with Coarse Sand having F.M. > 2.0, Crushed Stone dalla grit of nominal size of 4.75 mm to 20 mm, Mechanically mixed, placed in position and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 4,350.01 | Cum | - | - |
| 5 | Laying CC Block (300x600x150) in M20 Grade of Concrete with Coarse sand, Crushed Stone dalla grit, Mechanically mixed, properly compacted and placed in proper position including cost of all materials (but excluding cost of steel), iucluding labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 153.34 | Cum | - | - |
| 6 | Plain Cement Concrete in M-20 Lining 125 mm thick with Coarse Sand having F.M. > 2.0, Crushed Stone dalla grit of nominal size of 4.75 mm to 20 mm, Micro polymeric fibers ,Mechanically mixed, placed in position with Concrete Paver Machine and properly compacted including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 34,796.78 | Sqm | - | - |
| 7 | Providing and laying steel reinforcement including bending, binding cutting placing in position rainforcement steel including cost of binding wire with material. and other accessories required for proper completion of work. | 0.66 | MT | - | - |
| 8 | Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,430.79 | Cum | - | - |
| 9 | Supplying and laying Stone dalla Grit 4.75 to 10 mm below Cement Concrete lining with proper compaction and rolling including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. | 1,430.79 | Cum | - | - |
| 10 | Providing & Laying LDPE Sheet on slope, below Toe Wall, and Cut Off Wall including cost of all materials, labour, T&P etc required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification. | 41,747.81 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BID2.pdf
Tender Documents • 2.99 MB
BOQ_2197646.xls
BOQ • 0.29 MB
crr_dt.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .