| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC | ₹19.3 L | L1 | Accepted-AOC Accept |
| 2 | L2₹19.3 LRejected-AOC | ₹19.3 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Krishnan N L1 | A.Settu L2 |
|---|---|---|---|---|---|
| 1.001) Construction of Drain from Suba Ravi house to Parvathi Nagar end H/o Sarvoy | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundati | 241.68 | Cum | 175 ₹42,294 | 180 ₹43,502.40 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 42.24 | Cum | 5,577.52 ₹2.4 L | 5,577.52 ₹2.4 L |
| 4.00 | Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete | 728.44 | Sqm | 547 ₹4.0 L | 550 ₹4.0 L |
| 5.00 | Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing, laying, etc complete | 99.72 | Cum | 6,328.57 ₹6.3 L | 6,328.57 ₹6.3 L |
| 6.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. | 1.62 | MT | 91,858.5 ₹1.5 L | 91,858.5 ₹1.5 L |
| 7.00 | Cement concrete 1 : 1.5 : 3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3 | 14.28 | Cum | 9,188.35 ₹1.3 L | 9,188.35 ₹1.3 L |
| 8.00 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. | 158.4 | Sqm | 287.89 ₹45,601.78 | 287.89 ₹45,601.78 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,93,900 ₹2.9 L | 2,94,511 ₹2.9 L |
Tender Value
₹19.5 L
EMD Value
₹19,500
Closing Date
13 Jan 2026, 3:00 pmClosed
Block Development officer
Union office , Thalaivasal
Construction of Drain from Suba Ravi house to Parvathi Nagar end H/o Sarvoy
2026_RDTN_640053_1
Roc.1310/2025/A-2
Open Tender
Civil Works
Items
Construction of Drain from Suba Ravi house to Parvathi Nagar end H/o Sarvoy
3 documents required · 3 mandatory
₹0
₹19,500
Yes
19 Jan 2026
7 Jan 2026
13 Jan 2026
7 Jan 2026
13 Jan 2026
7 Jan 2026
7 Jan 2026 - 13 Jan 2026
Amount
1) Construction of Drain from Suba Ravi house to Parvathi Nagar end H/o Sarvoy
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundati
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing, laying, etc complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Cement concrete 1 : 1.5 : 3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A.Settu (BID ID -1561110)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
03.pdf
Tender Documents • 0.49 MB
BOQ_766321.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid