Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.1 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹59.0 L+₹2.9 L (5.18%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | L3₹61.9 L+₹5.8 L (10.3%)Accepted-Finance | L3 | Accepted-Finance Accepted | |
| 4 | L4₹62.0 L+₹5.9 L (10.5%)Accepted-Finance | L4 | Accepted-Finance Accepted | |
| 5 | Not Admitted-Fee/PreQual/Technical 6 VISHNU SHREYA COMPLEX PLOT NO 87 87 A SECTOR 50 E OFF PALM BEACH ROAD SEAWOODS NERUL WEST NAVI MUMBAI 400706 | THANE | MAHARASHTRA | 400706 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹53.9 L
EMD Value
₹1.3 L
Closing Date
31 Jul 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SA ASI Mumbai Circle, Mumbai
O/o the Superintending Archaeologist, Archaeological Survey of India, Sion Fort, Sion (E) Mumbai- 400 022.
EXECUTION OF WORKS UNDER MW (CONSERVATION) TO REPAIRS THE FORTIFICATION WALL AND BASTION OF SION FORT, SION E MUMBAI. (F.Y.2022-2023). AS SPECIFIED IN THE BOQ. (RECALL-III).
2023_ASI_762149_1
West/Mumb/Mumb/Whol/11390327
Open Tender
Miscellaneous Works
Works
SION FORT
As per NIT
2 documents required · 2 mandatory
₹0
₹1.3 L
Yes
3 Aug 2023
15 Jul 2023
1 Aug 2023
15 Jul 2023
31 Jul 2023
15 Jul 2023
Amount
Execution of works
Removal of thick rank vegetation consisting of thorny bushes of girth 15 -20 cm grown over and surrounding of the Ancient Portuguese Structure, removing the penetrated roots of trees carefully without damages to the ancient structures, including applying tree killer to avoid the further growth of vegetation of shrubs, disposing the unwanted stuff and stacking useful material etc., complete as per the direction of site incharge.
Provision for strengthening the masonry by filling up cracks and gaps developed in the fortification wall and ancient structure including pointing to the entire surface of the structure with the lime surkhi mortar 1:1:1 to prevent the further development of the vegetation including scaffolding, curing etc. complete as per the directions of the site incharge.
Provision for carefully removing of fallen portion of fortification wall which consisting of random stone blocks and deposited foreign material at the base of fortification wall, segregating all the material, screening all the loose soil to obtaining any archaeological members, antiquities if any including stacking the useful material and dispose the unwanted stuff as per the direction of archaeological officer/ official etc., complete as per the direction of site incharge.
Provision for excavation for foundation in hard rock by wedging, chiseling by manual means with taking proper care for avoiding any further damages including getting out and disposal of excavated material up to a distance of 50 meters beyond the work site as per the direction of the archaeological officer/ official etc., complete as per the direction of site incharge.
Provision for laying 20 mm soling in foundation with 15-20 cm oversize trap metal with 15 % sand, laying on the prepared surface, laying the sand for filling cavities packing properly in position, the interstices between them should be carefully filled with quarry spoils or pebbles and stone chips, including watering, compaction etc. complete as per the direction of site incharge.
Provision for laying lime surkhi concrete 1:1:1 with 0.20 mm stone aggregate in foundation by admixture the traditional ingredients for additional strengthening, by mixing pebbles, herbal plants extracts etc. complete as per the direction of the site incharge.
Reconstruction of fortification wall with 40 % available basalt stone block and 60 % new basalt stone block masonry of (size 0.50 x 0.70 x 0.40 meters) setting in specially prepared traditional lime surkhi mortar 1:1:1 (unslacked lime: Surkhi: sand) with ingredients of lady finger juice, hirda fruit and cactus leaves etc. to accelerate the setting time of mortar including dressing the stone, placing in position with the help of chain pulley and tripod, carrying, lifting etc., complete as per the direction of the archaeological officer/officials.
Reconstruction of battlements over the fortification wall with basalt stone block of size 0.40 x 0.30 x 0.25 meters) setting in specially prepared traditional lime surkhi mortar 1:1:1 (unslacked lime: Surkhi: sand) with ingredients of lady finger juice, hirda fruit and cactus leaves etc. to accelerate the setting time of mortar including dressing the stone, placing in position with the help of chain pulley and tripod, carrying, lifting etc., complete as per the direction of the archaeological officer/ officials.
Corefilling of bastion with stone boulder with minimum size of 300 mm obtain from approved quarry, setting in specially prepared traditional lime surkhi mortar 1:1:1 (unslacked lime: Surkhi: sand) with ingredients of lady finger juice, hirda fruit and cactus leaves etc. to accelerate the setting time of mortar including dressing the stone, placing in position with the help of chain pulley and tripod, carrying, lifting etc., complete as per the direction of the archaeological officer/ officials.
Provision for fixing MS grill fencing in between the channel 100 x 50 mm and grill of size 2.00 x 1.60 meter by using 16 mm square bar of 24 Nos. to a height of 1.70 meter welded by M.S. iron L angle of size 50 x 50 x 6 mm for frame all around and supported with MS flat 50 x 8 mm hold fast three nos. at equal interval as per the drawing (enclosed) and applying two coats of smoke gray colour enamel paint after applying single coat of iron primer etc. complete. Note: Total proposed length for MS gill is 84.00meters. Hence, 33 Nos. grill will be required etc complete as per the direction of site incharge.
Provision for water tightening the ancient water tank by plastering the lime surkhi mortar 1:1:1 after removal of weathered existing plaster of the walls and floor etc. complete as per the direction of site incharge.
SHAIKH_RIYAZ_IJAJ_GOVT.CONTRACTOR
YOGESH ASHOK BHOPALE
A S WADGAONKAR
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .