Loading…
Loading…
Tender Value
₹2.7 Cr
EMD Value
₹5.5 L
Closing Date
1 Jul 2026, 9:00 am2d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer HPPWD Shimla Division No. III
E.E. Shimla DIVISION NO. III, HPPWD, Shimla-3
Construction of 18 No. Servant Qtrs at Brock Hurst Chotta Shimla. SH Civil works WS SI, rain water Harvesting tank, and site development etc.
2026_PWD_137385_1
SD-III-4931-44dt.23-06-2026
Open Tender
Civil Works - Buildings
365 days
Brock Hurst
As per SBD
12 documents required · 12 mandatory
₹7,000
₹5.5 L
23 Jun 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling tiled floors laid in mortar upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within 20 metres lead For thickness of tiles upto 25mm | 22.95 | Per Square metre | 120 | ₹2,754 | BI01010001010000000000000515BI0100001113 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | Per Cubic metre | 1,050 | ₹1,048.95 | BI01010001010000000000000515BI0100001114 |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 7.48 | Per Cubic metre | 1,250 | ₹9,350 | BI01010001010000000000000515BI0100001115 |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 28.33 | Per Cubic metre | 1,050 | ₹29,746.5 | BI01010001010000000000000515BI0100001116 |
| 5 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: | 144.4 | Per Square metre | 120 | ₹17,328 | BI01010001010000000000000515BI0100001117 |
| 6 | Dismantling wooden ballies in posts and struts including stacking within 50metres lead. | 17.5 | Per running metre | 9.4 | ₹164.5 | BI01010001010000000000000515BI0100001118 |
| 7 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead :Thickness above 10 mm up to 25 mm | 22.68 | Per Square metre | 36.5 | ₹827.82 | BI01010001010000000000000515BI0100001119 |
| 8 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : Of sectional area 40 square centimetres and above | 3.61 | Per Cubic metre | 2,099.4 | ₹7,578.83 | BI01010001010000000000000515BI0100001120 |
| 9 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :Of area 3 sq. metres and below | 30 | Each | 67.05 | ₹2,011.5 | BI01010001010000000000000515BI0100001121 |
| 10 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : | 40.77 | Per Cubic metre | 520.3 | ₹21,212.63 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
SBD27491159.pdf
Tender Documents • 2.06 MB
BOQ_203296.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid