| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-Finance HIMACHAL PRADESH HP | BILASPUR | HIMACHAL PRADESH | 174001 | ₹2.7 Cr | L1 | Accepted-Finance ok |
| 2 | L2₹2.8 Cr+₹5.5 L (2.02%)Rejected-Finance | ₹2.8 Cr+₹5.5 L (2.02%) | L2 | Rejected-Finance Reject |
| 3 | L3₹2.8 Cr+₹11.0 L (4.04%)Rejected-Finance | ₹2.8 Cr+₹11.0 L (4.04%) | L3 | Rejected-Finance Reject |
Tender Value
₹2.7 Cr
EMD Value
₹5.5 L
Closing Date
1 Jul 2026, 9:00 amClosed
Executive Engineer HPPWD Shimla Division No. III
E.E. Shimla DIVISION NO. III, HPPWD, Shimla-3
Construction of 18 No. Servant Qtrs at Brock Hurst Chotta Shimla. SH Civil works WS SI, rain water Harvesting tank, and site development etc.
2026_PWD_137385_1
SD-III-4931-44dt.23-06-2026
Open Tender
Civil Works - Buildings
Percentage
365 days
Brock Hurst
As per SBD
12 documents required · 12 mandatory
₹7,000
₹5.5 L
1 Jul 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tiled floors laid in mortar upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within 20 metres lead For thickness of tiles upto 25mm | 22.95 | Per Square metre | 120 | ₹2,754 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | Per Cubic metre | 1,050 | ₹1,048.95 |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 7.48 | Per Cubic metre | 1,250 | ₹9,350 |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 28.33 | Per Cubic metre | 1,050 | ₹29,746.5 |
| 5 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: | 144.4 | Per Square metre | 120 | ₹17,328 |
| 6 | Dismantling wooden ballies in posts and struts including stacking within 50metres lead. | 17.5 | Per running metre | 9.4 | ₹164.5 |
| 7 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead :Thickness above 10 mm up to 25 mm | 22.68 | Per Square metre | 36.5 | ₹827.82 |
| 8 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : Of sectional area 40 square centimetres and above | 3.61 | Per Cubic metre | 2,099.4 | ₹7,578.83 |
| 9 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :Of area 3 sq. metres and below | 30 | Each | 67.05 | ₹2,011.5 |
| 10 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : | 40.77 | Per Cubic metre | 520.3 | ₹21,212.63 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
SBD27491159.pdf
Tender Documents • 2.06 MB
BOQ_203296.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .