Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76,772Accepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹76,998+₹226 (0.29%)Rejected-Finance 3 210 PANDARAKADU KONASAMUTHIRAM POST EDAPPADI TALUK SALEM DISTRICT TAMIL NADU | EDAPPADI | SALEM | TAMIL NADU | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | KUMARS CONSTRUCTION L1 | SR CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 74 | M2 | 1,924 ₹1,924 Lowest | 1,998 ₹1,998 |
| 2.00 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5. | 4 | M3 | 41,944 ₹41,944 Lowest | 42,000 ₹42,000 |
| 3.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 Kg Shredded Plastic 10 % for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 3 | M3 | 32,904 ₹32,904 Lowest | 33,000 ₹33,000 |
Tender Value
₹93,000
Closing Date
22 Sept 2025, 3:00 pmClosed
Executive Officer
Needamangalam Town Panchayat
General Fund 2025 26 Resotration Of Pot Holes and other Repairs(Patch works) in BT Road at Vadakku veethi, Appavu pathar santhu, Sarvamaniya agraharam, Kamarajar nagar, vadaku mada vilakam, keezha veethi and royalcity in Needamangalam Town Panchayat
2025_DTP_606708_1
965-1/2025/A1
Open Tender
Civil Works - Roads
Works
Needamangalam Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Yes
6 Oct 2025
20 Sept 2025
22 Sept 2025
20 Sept 2025
22 Sept 2025
20 Sept 2025
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 Kg Shredded Plastic 10 % for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
SR CONSTRUCTION (BID ID -1467599)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .