Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.5 L Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | L1 | - | |
| 2 | L2₹24.5 L+₹1.0 L (4.29%) Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | L2 | - | |
| 3 | L3₹25.7 L+₹2.2 L (9.26%) Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | L3 | - | |
| 4 | L4₹27.0 L+₹3.5 L (14.7%) Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | L4 | - | |
| 5 | L5₹29.6 L+₹6.1 L (26.0%) Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24 | L5 | - |
| Sl No | Description | Qty | Unit | Chetna Electrical L8 | K Arjun Kumar L3 | MALLI KHARJUN REDDY KOLAN L11 | NURUL HAK L6 | OMKAR TRADERS L1 | M/s Aggarwal Auto & Steel Mfg Co L9 | T R Constructions L7 | Mohd Salman L4 | SI CONSTRUTION L10 | IQRA CONSTRUCTIONS L5 | UTKAL PLUMBING SYSTEM L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil work | - | - | -18.99 ₹31,20,348.04 | -33.34 ₹25,67,613.88 | -6.89 ₹35,86,416.57 | -20.99 ₹30,43,311.92 | -38.99 ₹23,49,986.84 Lowest | -18.9 ₹31,23,814.67 | -19 ₹31,19,962.86 | -30 ₹26,96,264.2 | -18.15 ₹31,52,703.21 | -23.11 ₹29,61,653.63 | -36.37 ₹24,50,904.16 |
Tender Value
₹38.5 L
EMD Value
₹77,036
Closing Date
19 Jun 2023, 4:00 pmClosed
EE(PE)
Vaibhav Jain
President Estate
Replacement of old rusted G I Pipe line at Main Campus and C 2 Campus of Rashtrapati Nilayam, Bolarum, Hyderabad during 2023-24
44474
NIT32/EE/PE/2023-24
OPEN
Maintenance
NCB
3 months
Hyderabad, Telangana
10 documents required · 10 mandatory
₹77,036
Not Applicable
19 Jun 2023
12 Jun 2023
19 Jun 2023
19 Jun 2023
19 Jun 2023
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+32.pdf
document • 8.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .