Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical KORZOK LEH | LEH LADAKH | LADAKH | 194101 | Accepted-Technical qualified |
| 2 | Accepted-Technical | Accepted-Technical qualified |
| 3 | Accepted-Technical | Accepted-Technical qualified |
| 4 | Accepted-Technical MUDH LADAKH AUTONOMOUS HILL DEVELOPMENT COUNCIL LEH OFFICE OF THE EXECUTIVE ENGINEER RURAL ENGINEERING WING LEH | LEH LADAKH | LADAKH | 194101 | Accepted-Technical qualified |
| 5 | Accepted-Technical CHUSHUL | LEH LADAKH | LADAKH | 194101 | Accepted-Technical qualified |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
4 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Enginner Nyoma Division
office of the Executive Engineer Nyoma Division
Construction of internal road tukla by way of construction of limb from Shingo house to yaklay gang rd 0to130 mtr including 2mtr span rcc culvert limb to za marpo gang to youlgong rd 0 to 180 mtr limb from dam to chang chumik rd0to 160 mtr and costr
2026_PWD_19789_1
NIT96 RnB Nyoma
Open Tender
Civil Works - Roads
Percentage
90 days
Nyoma Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Executive Engineer RnB div. Nyoma
₹2.3 L
6 Nov 2026
26 Oct 2026
5 Nov 2026
26 Oct 2026
4 Nov 2026
26 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil 70% | 711.33 | Cum | 208.42 | ₹1,48,255.4 |
| 2 | Ordinary rock 25% | 254.04 | Cum | 383.89 | ₹97,523.42 |
| 3 | Hard rock (blasting prohibited) 5% | 50.81 | Cum | 1,095.42 | ₹55,658.29 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil 80% | 654.28 | Cum | 278.09 | ₹1,81,948.73 |
| 5 | Ordinary rock 20% | 163.56 | Cum | 504.48 | ₹82,512.75 |
| 6 | Dumping stone including cost of stones. in Horizontal on level | 90.63 | Cum | 953.03 | ₹86,373.11 |
| 7 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : All kinds of soil | 1,467.37 | Cum | 722.66 | ₹10,60,409.6 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 44.57 | Cum | 5,725.33 | ₹2,55,177.96 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 197.48 | Cum | 6,606.08 | ₹13,04,568.68 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 135 | Cum | 7,839.48 | ₹10,58,329.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_46682.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .