Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 47 EZHIL NAGAR PUDUKKOTTAI 622 005 | PUDUKKOTTAI | TAMIL NADU | 622005 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
28 Aug 2023, 3:00 pmClosed
Block Development Officer(VP)
Panchayat Union Office
TN-05-14-31-AGAMT-2022-23- Construction of Culvert 2Nos at Kudappam panchayat
2023_RDTN_361675_1
6315/2022/A10
Open Tender
Civil Works
Item Rate
30 days
Vedasandur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
30 Aug 2023
21 Aug 2023
28 Aug 2023
21 Aug 2023
28 Aug 2023
21 Aug 2023
Amount
Part 1 : Construction of 1.5m Span Culvert at Krishnapuram near burial ground in Kudappam panchayat Estimate Amount Rs. 3.75 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and Fabrication of Steel rod including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering and shuttering charges etc.,complete.
Provision for Name Board arrangements
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2 : Construction of 1.5m Span Culvert at Krishnapuram near Sundharapandi Thottam in Kudappam panchayat Estimate Amount Rs. 3.75 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and Fabrication of Steel rod including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering and shuttering charges etc.,complete.
Provision for Name Board arrangements
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MURUGAN G
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .