| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAccepted-Finance AT PO PATRAPADA PS KHANDAGIRI DIST KHURDHIA 751019 | KHANDAGIRI | KHURDA | ODISHA | 751019 | ₹2.9 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.0 Cr+₹6.8 L (2.35%)Rejected-Finance | ₹3.0 Cr+₹6.8 L (2.35%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 Cr+₹11.5 L (3.96%)Rejected-Finance AT KUNCHAPADA PO BANAMALIPUR DIST KHURDHA PIN 752103 | KHURDHA | ODISHA | 752103 | ₹3.0 Cr+₹11.5 L (3.96%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.0 Cr+₹12.2 L (4.22%)Rejected-Finance AT KHARIAR PO KHARLAR DIST NUAPADA | ₹3.0 Cr+₹12.2 L (4.22%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.0 Cr+₹14.2 L (4.92%)Rejected-Finance | ₹3.0 Cr+₹14.2 L (4.92%) | L5 | Rejected-Finance L5 |
Tender Value
₹4.0 Cr
EMD Value
₹4.0 L
Closing Date
2 Apr 2026, 5:00 pmClosed
CGM PC
IDCO TOWER, JANPATH, BHUBANESWAR
Construction of dedicated RCC Cable Trench along the SEZ road (back side of the Infosys building) to EMC Park Main Gate
2026_IDCO_127469_1
PC/EST/E-44/2025-26
National Competitive Bid
Civil Works - Others
Percentage
180 days
infovalley-II
please check Tender documents for details.
2 documents required · 2 mandatory
₹11,800
₹4.0 L
Yes
10 Jul 2026
20 Mar 2026
4 Apr 2026
20 Mar 2026
2 Apr 2026
20 Mar 2026
20 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in hard soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.3m in depth and as per direction of the department. | |||||
| 2Filling in foundation and plinth with Sand including quarring. collecting, conveying, supplying and watering incuding cost, conveyance, roylaty & taxes of all materials & cost of all labour, t & p etc. complete. S/R P-8 item No.15 | |||||
| 3Providing & laying cement concrete (1:3:6) using 12mm size black hard crusher broken granite chips of approved quality from approved quarry & cleaned sharp river sand for mortar to be mixed in concrete mixturer with approved quality of cement including hoisting, lowering and laying concrete in layers and compacting concrete by using vibrator, watering and curing for 28 days, finishing the exposed surface smooth including cost, conveyance, royalties and taxes of all materials, cost of all labour, scaffolding and T&P etc. required for the work complete excluding cost of centering and shuttering.as directed by the Engineer in charge. | |||||
| 4R.C.C. work M-25 grade with 20mm and down grade black hard granite crusher broken stone chips including centering, shuttering, hoisting and laying etc. complete. | |||||
| 5Providing strong, rigid, leveled and plumbed centering and shuttering to required shape and size for all kinds of R.C.C. works in the items mentioned below with wooden | |||||
| 6Cutting, Straightening coiled or bent up HYSD/ TMT Reinforcement Bars welding or jointing if necessary, bending, binding, tying the grills as required for R.C.C. works, providing Fan Hooks where necessary and hoisting, lowering and placing the same in proper position according to the approved designs and drawings in all floors at all height including cost, coveyance, loading, unloading,stacking & taxes of HYSD/TMT Reinforcement Bars and Binding Wires of 18 to 20 Gauge as required for the work, cost of all Labour Sundries, T&P, Staging and Scaffolding complete in all respect as directed by Engineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement. No payment will be made for overlap, couplings, welded joints spacer bars,stays, hangers and wastage. Cost of these items shall be deemed to be included in the rates for reinforcement) | |||||
| 7Providing, fitting, fixing & erection of Structural Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position all Structural Steel to be used & the fabrication work to be done is to be as per the relevent IS code. The bidder is to take all saftey measures during execution all complete in all floors at all height including cost, coveyance, loading. unloading.stacking of all scaffolding. hire charges Materials, crection, of crane welding. bolting.riveting, cost of all Labour, Sundries, T&P required for the work etc. complete excluding GST in all respect as directed by the Engineer-in-charge. | |||||
| 8Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge of the work. | |||||
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_585764.xls
BOQ • 0.34 MB
DTCN.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .