| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹8.2 L+₹81,538.90 (11.1%)Accepted-Finance | L2 | Accepted-Finance Admitted | |
| 3 | L3₹8.2 L+₹83,806.40 (11.4%)Accepted-Finance | L3 | Accepted-Finance Admitted | |
| 4 | L4₹8.5 L+₹1.1 L (15.1%)Accepted-Finance | L4 | Accepted-Finance Admitted | |
| 5 | L5₹9.3 L+₹1.9 L (26.4%)Accepted-Finance | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | ASHWANI SHARMA GOVT CONTRACTOR L6 | Renu Bala Contractor L1 | HOSHIAR NAAG L5 | M/S AMIT MANHAS L4 | SAHIL SHARMA L3 | MOHD SADAK L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil. | 74.77 | cum | 200 ₹14,954 | 120 ₹8,972.4 | 90 ₹6,729.3 Lowest | 250 ₹18,692.5 | 200 ₹14,954 | 100 ₹7,477 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | 6.55 | cum | 3,000 ₹19,650 | 2,050 ₹13,427.5 Lowest | 3,500 ₹22,925 | 2,800 ₹18,340 | 3,000 ₹19,650 | 4,000 ₹26,200 |
| 3.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 73.6 | cum | 7,000 ₹5,15,200 | 5,050 ₹3,71,680 | 6,000 ₹4,41,600 | 4,200 ₹3,09,120 Lowest | 4,500 ₹3,31,200 | 5,500 ₹4,04,800 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 433.49 | sqm | 200 ₹86,698 | 75 ₹32,511.75 | 90 ₹39,014.1 | 150 ₹65,023.5 | 200 ₹86,698 | 50 ₹21,674.5 Lowest |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 30.37 | cum | 100 ₹3,037 | 125 ₹3,796.25 | 70 ₹2,125.9 Lowest | 80 ₹2,429.6 | 300 ₹9,111 | 100 ₹3,037 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,598.75 | Kg | 130 ₹3,37,837.5 | 83.99 ₹2,18,269.01 Lowest | 100 ₹2,59,875 | 100 ₹2,59,875 | 90 ₹2,33,887.5 | 100 ₹2,59,875 |
| 7.00 | Carriage of materials (sand) from source to site of work by M.T. /HL including all lead and lift - complete job | 42.44 | cum | 120 ₹5,092.8 | 50 ₹2,122 Lowest | 330 ₹14,005.2 | 400 ₹16,976 | 50 ₹2,122 Lowest | 100 ₹4,244 |
| 8.00 | Carriage of materials (Bajri) from source to site of work by M.T. /HL including all lead and lift - complete job | 83.94 | cum | 160 ₹13,430.4 | 50 ₹4,197 Lowest | 330 ₹27,700.2 | 400 ₹33,576 | 50 ₹4,197 Lowest | 100 ₹8,394 |
| 9.00 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil. | 31.15 | cum | 170 ₹5,295.5 | 125 ₹3,893.75 | 90 ₹2,803.5 Lowest | 100 ₹3,115 | 200 ₹6,230 | 100 ₹3,115 |
| 10.00 | Supplying and placing of Boulders at the bottom for soling size ranges from 50 mm to 200 mm - complete job | 9.06 | cum | 120 ₹1,087.2 | 499 ₹4,520.94 | 700 ₹6,342 | 400 ₹3,624 | 700 ₹6,342 | 50 ₹453 Lowest |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
5 Aug 2025, 2:00 pmClosed
Wildlife Warden Jammu
Manda Jammu
Completion of Turtle Pond by way of construction of retaining wall
2025_FD_281397_1
NIT 13 Completion of Turtle Pond by way of construction of retaining wall
Open Tender
Civil Works
Item Wise
Gharana Wetland
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildife Warden Jammu
₹24,000
12 Aug 2025
15 Jul 2025
6 Aug 2025
16 Jul 2025
5 Aug 2025
16 Jul 2025
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Carriage of materials (sand) from source to site of work by M.T. /HL including all lead and lift - complete job
Carriage of materials (Bajri) from source to site of work by M.T. /HL including all lead and lift - complete job
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil.
Supplying and placing of Boulders at the bottom for soling size ranges from 50 mm to 200 mm - complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (Concrete 80%)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (Boulder 20%)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. 1000 mm dia. R.C.C. pipe (laying by manual/mechanical means)
Providing and fixing PVC Supreme brand heavy pipes 100 mm for weep holes place at a horizontal/vertical distance of 1.0 m - complete job
Carriage of materials (Carriage of 1 m dia NP3 pipe) from source to site of work by M.T. /HL including all lead and lift - complete job
Carriage of materials (Stone (50 mm to 200 mm)) from source to site of work by M.T. /HL including all lead and lift - complete job
Carriage of materials (Stone) from source to site of work by M.T. /HL including all lead and lift - complete job
MOHD SADAK (BID ID -2433967)
SAHIL SHARMA (BID ID -2433934)
M/S AMIT MANHAS (BID ID -2433720)
HOSHIAR NAAG (BID ID -2433757)
ASHWANI SHARMA GOVT CONTRACTOR (BID ID -2431424)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .