Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.8 LAccepted-Finance 1ST FLOOR GURJEET MARKET DHANGU ROAD | ₹41.8 L | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L2₹47.4 L+₹5.6 L (13.5%)Rejected-Finance | ₹47.4 L+₹5.6 L (13.5%) | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| 3 | Rejected-Technical | - | - | Rejected-Technical Adverse remarks in WLR of HQ CE Pathankot Zone for the QE Mar 26. |
| Sl No | Description | Qty | Unit | Vijay Kumar Contractor and Engineers L1 | Ashoka Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Material & labour for rewinding of electric motor of Cap 7.5HP- 12.5 HP (Condensor and Chilled water Motor) three phase 415 volts by removing old u/s burnt copper winding wire, cleaning of slots and insertion of insulating paper in the slots in appropriate size and rewinding with super enameled copper wire ISI marked of suitable size along with insertion of superior quality of insulating material, winding, varnishing and drying, including dismantling of electric motors connections and refixing back after rewinding, replacement of connection plate and making necessary electric connection and testing complete all as specified and directed by Engineer -in-Charge. | 2 | Each Job | 6,000 ₹12,000 Lowest | 7,000 ₹14,000 |
| 2.00 | Material & labour for rewinding of electric motor of Cap 3HP-5HP (Condensor and Chilled water Motor) three phase 415 volts by removing old u/s burnt copper winding wire, cleaning of slots and insertion of insulating paper in the slots in appropriate size and rewinding with super enameled copper wire ISI marked of suitable size along with insertion of superior quality of insulating material,winding, varnishing and drying, including dismantling of electric motors connections and refixing back after rewinding including, of connection plate and making necessary electric connection and testing complete all as specified and directed by Engineer -in-Charge. | 12 | Each Job | 5,000 ₹60,000 Lowest | 5,000 ₹60,000 Lowest |
| 3.00 | Decoupling of monoblock pump from electric motor, dismantling from the foundation and shifting to local workshop for Repair/ Overhauling of mono block pumping set 7.5 to 12.5 HP (Condensor and Chilled water Pump) taking out impeller bush bearing shaft stuffing box reassembling the same after replacing the defective parts & carrying out the necessary repair remetalling turning polishing the pump shaft replacement including replacement of steel studs and unserviceable nuts and bolts repair/replacement of ball bearing impellor stuffing box greasing etc and testing on completion and commisioning & installation at site complete all as specified and directed by Engineer -in-Charge.
Note:-
(i) The complete job includes making good the existing pumps water leakage proof ,including gland/ packing etc.
(ii) Cost of the Spare parts except GM bush, Impeller, stuffing box and ball bearing shall be included in the quoted rate by the contractorfor repair the pumpset. | 2 | Each Job | 4,000 ₹8,000 Lowest | 5,000 ₹10,000 |
| 4.00 | Supply & fix bearing for 7.5 to 12.5 HP pump sets complete all as specified and directed by Engineer -in-Charge. | 3 | Each Set | 1,200 ₹3,600 | 500 ₹1,500 Lowest |
| 5.00 | Supply & fix bronze/GM Impeller of pump set of cap 7.5 to 12.5 HP complete all as specified and directed by Engineer -in-Charge. | 3 | Each | 1,000 ₹3,000 | 500 ₹1,500 Lowest |
| 6.00 | Supply & fix stuffing box alongwith pressure plate and hexa nuts studds etc required for Gland packing and Pump shaft as per existing make complete all as specified and directed by Engineer -in-Charge. | 3 | Each | 700 ₹2,100 | 300 ₹900 Lowest |
| 7.00 | Supply & fix gun metal bush of pumpset of cap 7.5 to 12.5 HP complete all as specified and directed by Engineer -in-Charge. | 3 | Each Set | 400 ₹1,200 | 300 ₹900 Lowest |
| 8.00 | Decoupling of monoblock pump from electric motor, dismantling from the foundation and shifting to local workshop for Repair/Overhauling of mono block pumping set 3 to 5 HP (Condensor and Chilled water Pump) taking out impeller bush bearing shaft stuffing box reassembling the same after replacing the defective parts & carrying out the necessary repair remetalling turning polishing the pump shaft replacement including replacement of steel studs and unserviceable nuts and bolts repair/replacement of ball bearing impellor stuffing box greasing etc and testing on completion and commisioning & installation at site complete all as specified and directed by Engineer -in-Charge.
Note:-
(i) The complete job includes making good the existing pumps water leakage proof including gland/ packing etc.
(ii) Cost of the Spare parts except GM bush, Impeller, stuffing box and ball bearing shall be included in the quoted rate by the contractorfor repair the pumpset. | 12 | Each Job | 3,000 ₹36,000 Lowest | 3,000 ₹36,000 Lowest |
| 9.00 | Supply & fix bearing for 3 to 5 HP pumpsets complete all as specified and directed by Engineer -in-Charge. | 8 | Each Set | 1,200 ₹9,600 | 450 ₹3,600 Lowest |
| 10.00 | Supply & fix bronze/GM Impeller of pump set of cap 3 to 5 HP complete all as specified and directed by Engineer -in-Charge. | 8 | Each | 1,000 ₹8,000 | 400 ₹3,200 Lowest |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
29 Jun 2026, 6:00 pmClosed
HQ CWE AF Jammu
HQ CWE AF Jammu Air Force Station Jammu
CA NO CWEAFJ-14/2026-27 REPAIR AND MAINT OF AC PLANTS, COOLING APPLIANCES AT AF STATION PATHANKOT UNDER GE (AF) PATHANKOT
2026_MES_768467_1
CA NO CWEAFJ-14/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Pathankot
As per NIT and Tender documents
9 documents required · 9 mandatory
₹500
GE AF Pathankot
₹90,000
Yes
25 Aug 2026
29 May 2026
2 Jul 2026
29 May 2026
29 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material & labour for rewinding of electric motor of Cap 7.5HP- 12.5 HP (Condensor and Chilled water Motor) three phase 415 volts by removing old u/s burnt copper winding wire, cleaning of slots and insertion of insulating paper in the slots in appropriate size and rewinding with super enameled copper wire ISI marked of suitable size along with insertion of superior quality of insulating material, winding, varnishing and drying, including dismantling of electric motors connections and refixing back after rewinding, replacement of connection plate and making necessary electric connection and testing complete all as specified and directed by Engineer -in-Charge. | 2 | Each Job | 1.25 | ₹2.5 |
| 2 | Material & labour for rewinding of electric motor of Cap 3HP-5HP (Condensor and Chilled water Motor) three phase 415 volts by removing old u/s burnt copper winding wire, cleaning of slots and insertion of insulating paper in the slots in appropriate size and rewinding with super enameled copper wire ISI marked of suitable size along with insertion of superior quality of insulating material,winding, varnishing and drying, including dismantling of electric motors connections and refixing back after rewinding including, of connection plate and making necessary electric connection and testing complete all as specified and directed by Engineer -in-Charge. | 12 | Each Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
TENDERDOC14.pdf
Tender Documents • 1.03 MB
BOQ_860596.xls
BOQ • 0.80 MB
DATECORR14.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .