Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | L1 | Accepted-AOC Successful | |
| 2 | L2₹10.5 L+₹9,975 (0.96%)Rejected-AOC | L2 | Rejected-AOC Unsuccessful |
Tender Value
₹10.5 L
EMD Value
₹10,500
Closing Date
27 Apr 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer, Talcher Municipality
At - Municipal Office, P.O. Talcher Town, Dist.Angul
Construction of CC drain from Deulbera Village UP school towards Village Club in W.No.17
2026_ORULB_128172_2
TCRM-03/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Talcher Municipality Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,500
Yes
5 Sept 2026
16 Apr 2026
28 Apr 2026
16 Apr 2026
27 Apr 2026
16 Apr 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all kinds of soil with lead & lift etc., including leveling and dressing of bed etc., complete | 1 | cum | - | - |
| 2 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete | - | cum | - | - |
| 3 | P.C.C (1:3:6) using 4cm size b.h.g (HB) metal including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete | - | cum | - | - |
| 4 | RCC M-20 cement concrete with using 12mm to 20 mm down graded chips with all cost labour material complete including cost of all machinary such as conccrete mixture,vibrator etc | 1 | cum | - | - |
| 5 | Labor for M.S. reinforcement for RCC work including cutting, bending, binding with all cost of labour, T&P, cost of binding wire, etc. complete. | 1 | qntl | - | - |
| 6 | Rigid smooth centering & shuttering for CC or R.C.C. work including false work & dismentalling then after casting with all cost etc. complete. | - | sqm | - | - |
| 7 | Carrage of earth including all cost etc. complete | - | cum | - | - |
| 8 | Cost towards Transperency board, photograph, & other unforseen items | - | Nos | - | - |
| 9 | Add towards GST 18% | - | No. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_587947.xls
BOQ • 0.30 MB
DTCN.pdf
Tender Documents • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .