Tender Value
₹13.5 Cr
EMD Value
₹27.1 L
Closing Date
12 Oct 2026, 3:30 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
BRIDGE
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-III, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar nature of works for the above work is as under: - Fabrication anderection of steel structure or launching/de-launching of any steelgirder/industrial shed/micro wave towers/transmission linetowers/platform shed/steel staging work/steel chimney works/etc.
22 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All rates quoted in the tender shall be deemed to be inclusive ofall Taxes royalties payable by the contractor's to theGovernment or public body or local authority and no additionalamount will be paid or claim entertained on this account by theRailway.
It is responsibility of the tenderer that they ensure to see anycorrigendum of the tender to check the corrigendum on thewebsite from time to time.
The tenderer shall inspect the proposed site of work andacquaint himself/themselves with the site conditions, workinghours, layout of laid trees and shrubs that he/they cut formaking stacking, space for aggregates approach road, path wayavailable working area, local conditions etc. and all otherrelevant items connected with the execution of the work. Noclaims shall been entertained from the contractors for makinghis/their own arrangement for approaches/approach roads etc.in and outside Rly Land and contractor will bear entire expensessuch as road taxes, payment for right of way etc. to outsidersand for constructions of approaches/approach road etc.
The tenderers shall not add any conditions on their own either intheir covering letter or in the tender documents while submittingtheir offer. Any such conditions if stated and if are in violation ofthe Railways tender conditions or having financial implicationmay lead to summary rejection of the offer. Railway reserves theright to rejects such tenders summarily without assigning anyreasons whatsoever.
JOINT VENTURE will not be permitted for the tenders valuing lessthan or equal to Rs 10 crore.
It is the responsibility of contractor to arrange the payment ofthe labour employed for the work through bank and to deduct PFas per the provisions of Minimum Wages Act.
In case of any wrong information submitted by tenderer, thecontract shall be terminated, Earnest money Deposit(EMD),Performance Guarantee(PG) and Security Deposit (SD) ofcontract forfeited and agency barred for doing business onentire Indian Railways for 5 (five) years.
The railway reserves the right of verify all statements,information and documents submitted by the bidder in histender offer, and the bidder shall, when so required by theRailway, make available all such information, evidence anddocuments as may be necessary for such verification. Any suchverification or lack of such verification, by the railway shall notbe relieve then bidder of its obligations or liabilities hereundernor will it affect any rights of the Railway thereunder.
General Arrangement drawing for the work can be seen in theoffice of the Dy. CE/Br Line/ WCR BPL's office at any time duringthe office hours. These drawing are only for the guidance for thecontractor. Detail working drawing if required based generallyon the drawing mentioned above and various conditionmentioned in tender documents shall be submitted by thetenderer for approval of the same by railway.
The tenderer(s) / Contractor(s)shall upload along with the tenderphoto state copy of credentials for having successfully executedworks of similar nature and required magnitude in the recentpast. Tenders not accompanying with these documents areliable to be rejected.
The tenderer(s) / Contractor (S) shall upload a list of works which are currently being executed by them, their contact value and date of completion.
As per Railway Board Letter No. 2022/CE-I/GCC-2022/POLICY/Pt.I (E-3320424) dated 13.03.2026 and Indian Railways Standard General Conditions of Contract, April 2022 (Advance Correction SIip No. 11) para 5 "For tenders having advertised value more than Rs 10 crore wherein eligibility criteria include Bid Capacity also, the tenderer will be qualified only if its available bid capacity is equal to or more than the total bid value of the present tender".
Bhopal Division-CHOKA-MIDGHAT section- Replacement of girder of Gadariya bridge to remove infringement for movement of DSDC trains.
DYCE-Br-L-BPL-OT-03-2026~WCR
DYCE-Br-L-BPL-OT-03-2026
Open
Works - General
18 Months
Bhopal, Madhya Pradesh
₹0
₹27.1 L
11 Sept 2026
11 Sept 2026
28 Sept 2026
31 items across 2 schedules · ₹14,76,65,287.59 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Fabrication and Supply at site various steelsection i.e. plates, angles, channels, RSJ,H.D. bolts, nuts, washer etc. conforming toIS:2062 and cut in required shape and sizeas per approved plans, specification andspecial condition including drilling of holeswith all contractor's tools, plants, labouretc. | MT | 92.00 | 83,032.92 | 76,39,028.64 |
| 2 | Erection/Assembly of fabricated steelstructure with all contractors labours,scaffolding, tools & plants includingprovision of service bolts and drilling holesas per requirement in existing members forerection as directed by Engineering incharge. | MT | 92.00 | 9,489.19 | 8,73,005.48 |
| 3 | Dismantling of steel work on bridge withoutdamaging any components of the spans.Note:- Member which are not to be reusedmay be cut gas/flame cutting. | MT | 80.00 | 4,694.84 | 3,75,587.2 |
| 4 | Fabricating, supplying and fixing of 6 to 8mm thick steel chequered plate conformingto IS: 3502 for pathway, trolley refuges,floor for the bridge including fixing thesame over steel channel sleepers bydrilling holes in channel sleepers andtrolley refuge including nuts and bolts,tools and plants, labour as a complete job.(Similar item vide USSOR-2011 item no.-211040) | MT | 17.00 | 91,469.11 | 15,54,974.87 |
| 5 | Supplying and driving snap head rivets of16to 23.5mm dia in the various member ofthe bridge complete with contractorslabour, tools, plants etc. as directed by theEngineer in-charge. Rivets should confirmto IS: 1149 &IS: 1148. | Numbers | 5000.00 | 179.97 | 8,99,850 |
| 6 | Accurate marking and then drilling of19.5mm to 23.5mm dia hole in the existinggirder member, with contractor, labour,tools and plants, equipments an otherresources etc. complete as perspecification, the detailed scope of worksand as directed by the engineer-in- charge.a) In Situ. | Numbers | 700.00 | 72.62 | 50,834 |
| 7 | Fabrication supplying and fixing H- beamsleepers with all fittings and fixture as perRDSO drawing number B-1696/4,5 &revision with latest alteration or approveddrawing supplied by railway andspecification complete including supply andriveting of canted bearing plate. the ratesshall be inclusive of removing of existingsleepers. all cost preparing and supplying Hbeam from (ISHB) from standard rulesrolled section confirming to IS 2062 gradeB including supplying complete set ofrequired fittings and fixture duly galvanizedat per specification and transporting thesleepers from contractors workshop toBridge site Railway depot including loadingunloading and stacking with all lead liftdecent crossing of a fraction Nala track etc.handling Re handling other incidentalWorks etc. As may be required andincluding all taxes duties octoroi, royaltyand inspection charges. | Each | 360.00 | 27,997.91 | 1,00,79,247.6 |
| 8 | Drilling of holes, insertion of bolts in ballastretainer and epoxy grouting the boltsincluding supply of bolts with nuts andwasher as per drawing and instruction ofrailway's Engineer with all contracor'slabour, tools, plants, etc. complete in allrespect. Note:- Item will also be applicablefor drilling hole in bed block. | Each | 144.00 | 609.84 | 87,816.96 |
| 9 | Rehabilitation of cracked/ spelled portionsof the existing PSC/RCC Girder and bedblock by Epoxy mortar including removingof loose and perished concrete andcleaning by hard steel wire brush beforeapplying Epoxy mortar etc. complete withcontractor's material. Epoxy mortar of laiddown specifications, consumable tools andplants, scaffolding, labour etc. complete asrequired as per specification, detailedscope of work as attached with the tenderand as directed by Engineer-in- charge. | Kg | 350.00 | 602.17 | 2,10,759.5 |
| Schedule total | ₹2,17,71,104.25 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocGadariyaBridge.pdf
ATTACHMENT
LetterForMaintanancePeriodof4years.pdf Maintenance Period 4 years
ATTACHMENT
GCC 2022
ATTACHMENT
GCC_April-2022_updateduptocorrectionslip7.pdf
ATTACHMENT
LetterForMaintanancePeriodof4years.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .