Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC C O ZAMA MASZID GALI NO 3 MIDDLE BAZAR SHIMLA 171001 H P | SHIMLA | HIMACHAL PRADESH | 171001 | L1 | Accepted-AOC lowest rate quoted | |
| 2 | L2₹3.7 L+₹10,651.21 (2.94%)Rejected-Finance | L2 | Rejected-Finance Highest rate quoted | |
| 3 | L3₹3.8 L+₹21,302.41 (5.88%)Rejected-Finance BHAROTA NIWAS SANGTI SANJAULI SHIMLA HP 171006 | SHIMLA | HIMACHAL PRADESH | 171006 | L3 | Rejected-Finance Highest rate quoted |
Tender Value
Refer Docs
EMD Value
₹8,876
Closing Date
12 Feb 2024, 10:00 amClosed
Er.Pratap Singh
ED. No. 1 Kasumpti Shimla 171009
Estimate for Re-earthing of DTR in various section, Augmentation of 1Phase to 3Phase LT line from 630kVA/250kVA, 11/0.4kV S/stn Sector-4/Rajhana 2nd in ES New shimla and Strengthening of LT line by reducing lengthy span from 250kVA,11/0.4kV S/st
2024_HPSEB_85203_1
SED/SP- Tender No-90/2023-24
Limited
Electrical Works
Percentage
90 days
Khallini
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹8,876
5 Mar 2024
5 Feb 2024
12 Feb 2024
5 Feb 2024
12 Feb 2024
5 Feb 2024
eProcurement System Government of Himachal Pradesh Created By: pratap Singh Sidholi Created Date/Time: 12-Feb-2024 02:28 PM Tender Title: Estimate for Re-earthing of DTR in various section, Augmentation of 1Phase to 3Phase LT line from 630kVA/250kVA, 11/0.4kV S/stn Sector-4/Rajhana 2nd in ES New shimla and Strengthening of LT line by reducing lengthy span from 250kVA,11/0.4kV S/stn K Tender ID: 2024_HPSEB_85203_1
Tender Inviting Authority: Addl. Superintending Engineer, Shimla Elect. Division No.1,HPSEB Ltd., Shimla-171009.
Name of work: Estimate for Re-earthing of DTR's in various section, Augmentation of 1Phase to 3Phase LT line from 630kVA/250kVA, 11/0.4kV S/stn Sector-4/Rajhana 2nd in ES New shimla and Strengthening of LT line by reducing lengthy span from 250kVA,11/0.4kV S/stn Kamlahi under ESD HPSEBL Khalini under Electrical Division No. 1
Contract No: SED/SP- Tender No-90/2023-24
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Nishant Bharota (GSTN-02BERPB0382J1ZO) BID ID -404070 355040.11 8.00 383443.32 Three Lakh Eighty Three Thousand Four Hundred and Fourty Three
2.00 fayaz Ahmad(GSTN-NA)--402853 355040.11 2.00 362140.91 Three Lakh Sixty Two Thousand One Hundred and Fourty
3.00 NAZIR AHMAD(GSTN-NA)--403170 355040.11 5.00 372792.12 Three Lakh Seventy Two Thousand Seven Hundred and Ninty Two
Lowest Amount Quoted BY: fayaz Ahmad(362140.91)
BOQ Summary Details Tender Title: Estimate for Re-earthing of DTR in various section, Augmentation of 1Phase to 3Phase LT line from 630kVA/250kVA, 11/0.4kV S/stn Sector-4/Rajhana 2nd in ES New shimla and Strengthening of LT line by reducing lengthy span from 250kVA,11/0.4kV S/stn K Tender ID: 2024_HPSEB_85203_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 fayaz Ahmad 362140.91 L1
2 NAZIR AHMAD 372792.12 L2
3 Nishant Bharota 383443.32 L3
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_126765.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .