| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.0 CrAccepted-AOC | ₹17.0 Cr | L-1 | Accepted-AOC Awarded for being L-1 bidder as per approved TCR |
| 2 | L-2₹17.0 Cr+₹6,894.74 (<0.01%)Rejected-Finance | ₹17.0 Cr+₹6,894.74 (<0.01%) | L-2 | Rejected-Finance Rejected for not being L-1 bidder |
| 3 | L-3₹18.6 Cr+₹1.6 Cr (9.31%)Rejected-Finance | ₹18.6 Cr+₹1.6 Cr (9.31%) | L-3 | Rejected-Finance Rejected for not being L-1 bidder |
| 4 | L-4₹24.1 Cr+₹7.1 Cr (41.5%)Rejected-Finance 2 9 SUNITY CHATTERJEE PATH CITY CENTRE DURGAPUR 713216 | DURGAPUR | BURDWAN | WEST BENGAL | 713216 | ₹24.1 Cr+₹7.1 Cr (41.5%) | L-4 | Rejected-Finance Rejected for not being L-1 bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected in work experience and local supplier status |
| Sl No | Description | Qty | Unit | M/s. V P Jain L1 | Subir Engineering Works (P) Ltd L4 | MECO TECHNOLOGIES PVRIVATE LIMITED L3 | M/s TULASI CONSTRUCTION (JV) L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Surveying, planning, Designing and drawing of Auditorium Complex at the specified location | 1 | Lumpsum | 40,00,000 ₹40,00,000 Lowest | 43,00,000 ₹43,00,000 | 1,29,00,000 ₹1,29,00,000 | 52,05,190 ₹52,05,190 |
| 2.00 | Civil Work for Construction of Auditorium building
Details - As per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis.
Minimum Area of Auditorium Building - 2075 Sqm including both the floors | 1 | Lumpsum | 5,67,06,000 ₹5,67,06,000 | 6,09,00,000 ₹6,09,00,000 | 4,00,00,000 ₹4,00,00,000 Lowest | 6,95,24,792 ₹6,95,24,792 |
| 3.00 | Plumbing works of Auditorium as per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis. | 1 | Lumpsum | 25,50,000 ₹25,50,000 | 91,12,500 ₹91,12,500 | 25,00,000 ₹25,00,000 | 10,27,120 ₹10,27,120 Lowest |
| 4.00 | Internal electrification at Auditorium as per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis. | 1 | Lumpsum | 53,25,000 ₹53,25,000 | 2,43,00,000 ₹2,43,00,000 | 70,00,000 ₹70,00,000 | 13,38,990 ₹13,38,990 Lowest |
| 5.00 | External sanitary and water supply at Auditorium Complex as per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis. | 1 | Lumpsum | 8,00,000 ₹8,00,000 | 25,00,000 ₹25,00,000 | 15,00,000 ₹15,00,000 | 7,20,340 ₹7,20,340 Lowest |
| 6.00 | External electrification at Auditorium Complex as per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis. | 1 | Lumpsum | 15,50,000 ₹15,50,000 | 15,00,000 ₹15,00,000 | 13,00,000 ₹13,00,000 | 5,50,850 ₹5,50,850 Lowest |
| 7.00 | Fire fighting with wet riser and sprinkler system at Auditorium - Minimum Area of Auditorium Building 2075 Sqm
Details : Details - As per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis. | 1 | Lumpsum | 25,00,000 ₹25,00,000 | 45,00,000 ₹45,00,000 | 45,00,000 ₹45,00,000 | 10,84,750 ₹10,84,750 Lowest |
| 8.00 | Automatic fire alarm system at Auditorium - Minimum Area of Auditorium Building 2075 Sqm
Details : Details - As per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis. | 1 | Lumpsum | 9,25,000 ₹9,25,000 | 40,00,000 ₹40,00,000 | 9,00,000 ₹9,00,000 | 6,90,680 ₹6,90,680 Lowest |
| 9.00 | Overhead tanks in Auditorium building - Minimum Quantity - 15000 Ltrs
Details - Water tank of 15,000 litres capacity without staging including necessary plumbing work for connection with the rising mains from existing supply network, as per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis. | 1 | Lumpsum | 3,00,000 ₹3,00,000 | 5,00,000 ₹5,00,000 | 3,50,000 ₹3,50,000 | 2,92,370 ₹2,92,370 Lowest |
| 10.00 | Internal roads and footpath in Auditorium Complex - Minimum Area 2000 Sqm
Details - As per Technical specification and Scope of work enclosed, including Planning, Surveying, Design and execution of work on turnkey basis. | 1 | Lumpsum | 45,10,000 ₹45,10,000 | 81,50,000 ₹81,50,000 | 34,00,000 ₹34,00,000 Lowest | 40,42,370 ₹40,42,370 |
Tender Value
₹20.6 Cr
EMD Value
₹25.7 L
Closing Date
9 May 2025, 5:00 pmClosed
GM(Civil),/HOD, TAD, ECL HQ.
Eastern Coalfields Limited, Sanctoria, PO Dishergarh Dist Paschim Burdwan Pin 713332
Survey, Planning, Designing, Drawing and Construction of 500 seat capacity Auditorium at Dishergarh Club premises in Jhalbagan, ECL HQ including 05 (five) years Comprehensive Operation and maintenance work on Turn-Key Basis
2025_ECL_333569_1
ECL/HQ/TAD/e-Tender/24-25/29 DATED 29.03.2025
Turnkey
Civil Works - Buildings
Item Rate
2365 days
Eastern Coalfields Limited, Jhalbagan Sanctoria
As per tender documents.
8 documents required · 8 mandatory
₹25.7 L
OFFICE OF GM (CIVIL) HOD TAD ECL HQ
24 Oct 2025
29 Mar 2025
12 May 2025
29 Mar 2025
9 May 2025
9 Apr 2025
29 Mar 2025 - 2 May 2025
7 Apr 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
BOQ_345772.xls
BOQ • 0.30 MB
167133776.pdf
Tender Documents • 1.18 MB
167133777.pdf
Tender Documents • 0.79 MB
167133778.pdf
Tender Documents • 1.46 MB
167133779.pdf
Tender Documents • 1.03 MB
167133780.pdf
Tender Documents • 1.75 MB
167133781.pdf
Tender Documents • 6.34 MB
167133783.html
Tender Documents • 0.07 MB
EvaluationsheetUpdated.xls
Tender Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .