Executive Engineer Water Works Division Srinagar
Executive Engineer Water Works Division Srinagar Lal Chowk Exchange Road Srinagar
Construction of Sluice Chamber at Alamgari Bazar for 300,250mm dia Sluice Valves necessitated due to construction of drain by NBCC.
2020_PHE_92887_1
E-NIT No. 18/WWD of 2019-20
Open Tender
Civil Works - Water Works
Item Rate
20 days
Alamgari Bazar
As per NIT
3 documents required · 3 mandatory
₹150
Yes
Executive Engineer Water Works Division Srinagar
₹3,160
Yes
17 Oct 2020
15 Feb 2020
27 Feb 2020
15 Feb 2020
25 Feb 2020
15 Feb 2020
Amount
Earthwork in excavation by manual means in trenches of foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth up to 1.5 mts from cutting edge, disposed earth is to be leveled and neatly dressed in:(All kinds of soil)
Excavation in water bound macadam road including stacking of serviceable and unserviceable material separately and disposal of unserviceable material lead up to 50m and lift up to 1.5m disposed material to be neatly dressed.
Laying of stone soling on level (Horizontal) hand packed
Providing/laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work up to plinth level. 1:5:10 (1cement: 5 coarse sand: 10 graded stone aggregate, 40mm nominal size) crushed.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, finishing and reinforcement-All work up to plinth level. 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate, 20mm nominal size. 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate, 20mm nominal size) crushed.
Reinforced cement concrete work in beams, suspended floor, roofs having slope up to 15º landing, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral stair cases up to floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footing, bases of columns etc.
Walls (any thickness) incl. attached pilasters, buttresses, plinth & string courses etc.
Suspended floors, roofs, landings, balconies and access platform.
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete.(TMT bars)
12mm cement plaster of mix 1:4 (1 cement: 4 fine sand).
Steel work welded in built up sections/ framed work incl. cutting, hoisting, fixing in position & applying a priming coat of approved steel primer using structural steel etc as required. In gratings, frames, guard bar, ladders,railings, brackets, gates & similar works.
Carriage of materials from different sources up to the site of work including loading, un-loading and stacking complete.
Cement/Steel for an average Avg. of lead of 02 Km.
Sand from Ganderbal for an average Avg. of lead of 15 Km.
Aggregate from Athwajan for an Avg. lead of 12 Km.
Stone soling from Athwajan for an Avg. lead of 12 Km.
M/S ARSHID BASHIR KACHROO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .