| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC NO 1A 1 SHALOM VALLUVAR STREET SIVANANDHA COLONY COIMBATORE TAMIL NADU 641 012 | COIMBATORE | TAMIL NADU | 641012 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹26.7 L+₹3.7 L (16.2%)Rejected-Finance | L2 | Rejected-Finance Not being L1 | |
| 3 | L3₹27.9 L+₹4.9 L (21.5%)Rejected-Finance | L3 | Rejected-Finance Not being L1 | |
| 4 | L4₹30.2 L+₹7.3 L (31.6%)Rejected-Finance E 37 CWE AF SOUTH BANGALORE A I A II B I | BENGALURU URBAN | KARNATAKA | 560001 | L4 | Rejected-Finance Not being L1 | |
| 5 | L5₹33.9 L+₹11.0 L (47.8%)Rejected-Finance THE JEHOVAH SHALOM 21 THIRUMALAISAMY STREET LAKSHMI NAGAR EXTN KAVUNDAMPALAYAM COIMBATORE 641030 | COIMBATORE | COIMBATORE | TAMIL NADU | 641030 | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | SEMBA ELECTRICALS L4 | shalom constructions L1 | eurekaenterprises L2 | KUMAR AGENCIES L5 | V.R.Enterprises L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m deep and getting out in hard/dense soil for laying of UG cables all as specified and as directed.
Note - During the time of excavation any damge in existing structure / pipes / cables the contractor rectify the same without any extra cost | 322 | CUM | 220 ₹70,840 Lowest | 320 ₹1,03,040 | 300 ₹96,600 | 315 ₹1,01,430 | 350 ₹1,12,700 |
| 2.00 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thickness with hard/dense soil all as specified and as directed. | 167 | CUM | 80 ₹13,360 | 60 ₹10,020 | 70 ₹11,690 | 90 ₹15,030 | 50 ₹8,350 Lowest |
| 3.00 | Removing excavated materials (soils) to a distance not exc 50m and depositing where directed at a level not exceeding 1.5 m above the starting point all as specified and as directed. | 155 | CUM | 120 ₹18,600 | 80 ₹12,400 Lowest | 90 ₹13,950 | 125 ₹19,375 | 100 ₹15,500 |
| 4.00 | Earth cushioning to UG cables using excavated soil riddled by using large sieve to separate the composite particles/roots etc and refilling in trenches all as specified and as directed.
Note: Punned thickness will be measured for payment. | 123 | CUM | 150 ₹18,450 | 250 ₹30,750 | 200 ₹24,600 | 240 ₹29,520 | 100 ₹12,300 Lowest |
| 5.00 | Material and labour for Plain Cement Concrete (1:2:4) type B-2 (using 40 mm graded crushed stone aggregate) for filling in foundation & mass concrete, complete all as specified and directed. | 2 | CUM | 7,000 ₹14,000 | 4,500 ₹9,000 Lowest | 4,500 ₹9,000 Lowest | 4,500 ₹9,000 Lowest | 7,500 ₹15,000 |
| 6.00 | Supply and lay burnt bricks sub-class 'B' designation 75 for cable protection, all as specified and as directed. | 12.5 | 1000 Nos | 10,000 ₹1,25,000 | 10,500 ₹1,31,250 | 9,000 ₹1,12,500 | 8,000 ₹1,00,000 Lowest | 12,000 ₹1,50,000 |
| 7.00 | Horizonal boring holes under road,pavement, hard standing by trncheles technology using ultra sounding technique and necessary machine including HDPE pipe of dia 80 mm suitable for 0.4 Mpa working pressure, all as specified and as directed. | 30 | RM | 2,200 ₹66,000 | 1,700 ₹51,000 Lowest | 2,000 ₹60,000 | 3,200 ₹96,000 | 2,000 ₹60,000 |
| 8.00 | Material and labour for dismantling / cutting of existing road / path / hard standing cement concrete (unreinforced) in ground floors and pavings not exceeding 15 cm thickness (below or above ground level) suitable for laying cable protection pipe 80 / 50 mm dia under the road / path / hard standing complete including removing the debris from site upto a distance of 50m, complete all as specified and as directed.
Note - Pipe shall be measured & paid separately. | 2 | CUM | 1,000 ₹2,000 | 800 ₹1,600 | 1,000 ₹2,000 | 650 ₹1,300 Lowest | 650 ₹1,300 Lowest |
| 9.00 | Supply and laying GI pipe light grade 80 mm bore including all type fitting such as bends, elbows, tee etc fixed on walls/to poles/laid in trenches as cable protection, all as specified and as directed. | 18 | RM | 550 ₹9,900 Lowest | 750 ₹13,500 | 700 ₹12,600 | 980 ₹17,640 | 600 ₹10,800 |
| 10.00 | Supply and laying GI pipe light grade 50 mm bore including all type fitting such as bends, elbows, tee etc fixed on walls/to poles/laid in trenches as cable protection, all as specified and as directed. | 24 | RM | 350 ₹8,400 Lowest | 550 ₹13,200 | 350 ₹8,400 Lowest | 450 ₹10,800 | 350 ₹8,400 Lowest |
Tender Value
₹24.8 L
EMD Value
₹49,660
Closing Date
28 Jul 2025, 6:00 pmClosed
Ranjeet Kumar, IDSE, CWE
Commander Works Engineers AF South Gangamma Circle Opp Guard Room 410 AFS Jalahalli Bangalore 560013
SPECIAL REPAIR AND REPLACEMENT OF LT UG CABLES AT POCKET A AND B AT AFAC COIMBATORE
2025_MES_717536_1
84290/E8
Open Tender
Civil Works
Item Rate
180 days
AGE (I) (AF) Coimbatore
As per tender documents
7 documents required · 7 mandatory
₹500
Yes
AGE (I) AF Coimbatore
₹49,660
Yes
18 Aug 2025
30 Jun 2025
4 Aug 2025
30 Jun 2025
28 Jul 2025
14 Jul 2025
30 Jun 2025 - 5 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .