| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.4 LAccepted-AOC 36 MAADI LINE SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹18.4 L Quoted ₹16.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹19.8 LRejected-AOC M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹19.8 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L2 | SabhariAndCo L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate and transporting of scrap to Central Stores/M.T.P.S-I. | 320 | M² | 1,318 ₹4,21,760 | 1,089 ₹3,48,480 Lowest |
| 2.00 | Labour charges for welding eroded initial welding joints in the flue gas duct below 2 metre. | 400 | Mtr | 168 ₹67,200 | 139 ₹55,600 Lowest |
| 3.00 | Labour charges for welding eroded initial welding joints in the flue gas duct above 2 metre . | 400 | Mtr | 210 ₹84,000 | 173.37 ₹69,348 Lowest |
| 4.00 | Charges for transporting of 6mm M.S/Chequered plates from Central Stores/MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions below 1.5 m of the flue gas duct and welding the same. | 140 | M² | 1,873 ₹2,62,220 | 1,547.07 ₹2,16,589.8 Lowest |
| 5.00 | Charges for transporting of 6mm M.S./Chequered plates from Central Stores/ MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions above 1.5 metres side wall portions of the flue gas ducts and welding the same. | 120 | M² | 2,234 ₹2,68,080 | 1,845.37 ₹2,21,444.4 Lowest |
| 6.00 | Charges for transporting of 6mm M.S./Chequered plates from Central Stores/MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the flue gas ducts and welding the same. | 60 | M² | 2,595 ₹1,55,700 | 2,143.67 ₹1,28,620.2 Lowest |
| 7.00 | Providing sampling points/temperature measuring points at various location of flue gas ducts | 12 | Nos | 6,350 ₹76,200 | 5,245.42 ₹62,945.04 Lowest |
| 8.00 | Charges for cutting and removal of the eroded portion of previously patched up plates at the flow entry direction in the flue gas duct plates and transporting of scrap to Central Stores/M.T.P.S-I. | 100 | Mtr | 264 ₹26,400 | 218.02 ₹21,802 Lowest |
| 9.00 | Charges for removal of wear resistance plate for patch up the eroded intricate portion and re fixing the same after completing the patch up. | 40 | M² | 1,438 ₹57,520 | 1,188.13 ₹47,525.2 Lowest |
| 10.00 | Charges for providing of frames and doors for the Flue Gas Duct | 2 | Nos. | 65,688 ₹1,31,376 | 54,264 ₹1,08,528 Lowest |
Tender Value
Refer Docs
EMD Value
₹18,300
Closing Date
20 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit I AOH 2026 27 Flue Gas duct A and B side Patch up works and other repair works between APH outlet to ESP inlet
2026_EB_652349_1
CE / MTPS-I / SE / M-I / BM /OT. 477 / 2025-26
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹18,300
Yes
20 Aug 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for cutting and removal of heavily eroded flue gas duct plates (Multilayer) from the parent plate and transporting of scrap to Central Stores/M.T.P.S-I. | 320 | M² | - | - |
| 2 | Labour charges for welding eroded initial welding joints in the flue gas duct below 2 metre. | 400 | Mtr | - | - |
| 3 | Labour charges for welding eroded initial welding joints in the flue gas duct above 2 metre . | 400 | Mtr | - | - |
| 4 | Charges for transporting of 6mm M.S/Chequered plates from Central Stores/MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions below 1.5 m of the flue gas duct and welding the same. | 140 | M² | - | - |
| 5 | Charges for transporting of 6mm M.S./Chequered plates from Central Stores/ MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded portions above 1.5 metres side wall portions of the flue gas ducts and welding the same. | 120 | M² | - | - |
| 6 | Charges for transporting of 6mm M.S./Chequered plates from Central Stores/MTPS-I. to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the flue gas ducts and welding the same. | 60 | M² | - | - |
| 7 | Providing sampling points/temperature measuring points at various location of flue gas ducts | 12 | Nos | - | - |
| 8 | Charges for cutting and removal of the eroded portion of previously patched up plates at the flow entry direction in the flue gas duct plates and transporting of scrap to Central Stores/M.T.P.S-I. | 100 | Mtr | - | - |
| 9 | Charges for removal of wear resistance plate for patch up the eroded intricate portion and re fixing the same after completing the patch up. | 40 | M² | - | - |
| 10 | Charges for providing of frames and doors for the Flue Gas Duct | 2 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_782213.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].