| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC LONGAI T E CHANDKIRA PATHARKANDI SRIBHUMI ASSAM | SRIBHUMI | SRIBHUMI | ASSAM | ₹1.7 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹1.7 Cr+₹2,071.34 (0.01%)Rejected-AOC LONGAI TEA ESTATES PO CHANDKHIRA P S PATHARKANDI DIST KARIMGANJ ASSAM | ₹1.7 Cr+₹2,071.34 (0.01%) | L2 | Rejected-AOC Not Qualified for AOC |
| Sl No | Description | Qty | Unit | TAPAS BANIK L2 | BIHUL UPADHYAY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in embankment by Tractor-trailer carriage by mechanical means with locally available ordinary soil excluding rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22 cm. thick including ploughing or roughening or benching the seats, removing all debris, breaking clods up to 2.5 cm cube, dressing as per design section, etc. complete as directed.
(10% deduction will be made from the section measured quantities of the completed and compacted earth work on account of shrinkage).
For initial lead up to 1 Km and for all lifts
For every Km extra lead beyond initial lead of 1 Km & up to 10 Km. (For 6 Km lead) | 29,590.5 | Cum | 388.85 ₹1,15,06,265.93 | 388.78 ₹1,15,04,194.59 Lowest |
| 2.00 | Filling of geo-tubes (25m long and 4.3m circumference) with sand volume 32.265 cum by using mud pump not below the fill height of 0.70m as per drawing and technical specifications, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 2.5m c/c along both sides of the tube and at both ends to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 500m, etc. including setting up of the tube laying platform, complete as directed. | 96 | Nos | 22,618.53 ₹21,71,378.88 Lowest | 22,618.53 ₹21,71,378.88 Lowest |
| 3.00 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom ofpile cap) :
300 mm Dia piles | 36 | Rm | 3,139.17 ₹1,13,010.12 Lowest | 3,139.17 ₹1,13,010.12 Lowest |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 180.15 | Cum | 266.55 ₹48,018.98 Lowest | 266.55 ₹48,018.98 Lowest |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,891.36 | Kg | 110.44 ₹4,29,761.8 Lowest | 110.44 ₹4,29,761.8 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 311.84 | Sqm | 401.56 ₹1,25,222.47 Lowest | 401.56 ₹1,25,222.47 Lowest |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 173.1 | Cum | 9,262.85 ₹16,03,399.34 Lowest | 9,262.85 ₹16,03,399.34 Lowest |
| 8.00 | 15 mm cement plaster on the rough side of single or half brick wall of mix :
1:4 (1 cement: 4 fine sand) | 141.8 | Sqm | 409.04 ₹58,001.87 Lowest | 409.04 ₹58,001.87 Lowest |
| 9.00 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
1000 mm dia | 20 | mtr | 8,410.9 ₹1,68,218 Lowest | 8,410.9 ₹1,68,218 Lowest |
| 10.00 | Carriage of Geo Bags of size 2.00 × 1.50 m including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed.
(Distance to be calculated with respect to FOR Sribhumi)
Distance = 60 Km | 441 | Nos | 7.69 ₹3,391.29 Lowest | 7.69 ₹3,391.29 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
20 Jan 2026, 2:00 pmClosed
Chief Engineer, Water Resources Department, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Restoration of dyke on both bank of river Shingla at different reaches including restoration of existing culvert at Kapnar channel and Joyanagar.
2026_DoWR_50221_1
SRIBHUMI/2025-26/PDNA/WORK/VI
Open Tender
Civil Works
Works
180 days
SRIBHUMI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹3.4 L
Yes
26 May 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
20 Jan 2026
16 Jan 2026
Earth work in embankment by Tractor-trailer carriage by mechanical means with locally available ordinary soil excluding rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22 cm. thick including ploughing or roughening or benching the seats, removing all debris, breaking clods up to 2.5 cm cube, dressing as per design section, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted earth work on account of shrinkage). For initial lead up to 1 Km and for all lifts For every Km extra lead beyond initial lead of 1 Km & up to 10 Km. (For 6 Km lead)
Filling of geo-tubes (25m long and 4.3m circumference) with sand volume 32.265 cum by using mud pump not below the fill height of 0.70m as per drawing and technical specifications, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 2.5m c/c along both sides of the tube and at both ends to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 500m, etc. including setting up of the tube laying platform, complete as directed.
Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom ofpile cap) : 300 mm Dia piles
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand)
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 1000 mm dia
Carriage of Geo Bags of size 2.00 × 1.50 m including loading & unloading, stacking cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman, etc. completed as directed. (Distance to be calculated with respect to FOR Sribhumi) Distance = 60 Km
Carriage of Geo Bags of size 1.03 x 0.70 m including loading & unloading , Stacking, etc. complete and including hire charge of truck with driver and handyman cost of P.O.L etc. completed as directed. (Distance to be calculated with respect to FOR Sribhumi) Distance = 60 Km
Filling and laying of nonwoven Geo-textile bag of dimension 2.00m x 1.50m excluding excavation of sand from flood plain or adjacent chars within a distance of 90m of the work site, filling geo bags with sand having minimum volume 0.612 cum after filling, double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle machine, laying at proper site including all handling charges and local carriage within a distance of 100m complete as directed. (Sand, Geo Bag and Polypropylene thread will be supplied by the department free of cost). Without Boat
Filling and laying of Geo bags of size 1.03 m × 0.70 m excluding excavation of sand/silt from flood plain or adjacent chars within a distance of 90 m of the work site, filling geo bags with sand/silt having minimum weighing 126.00 Kg and minimum volume 0.084 Cum after filling , double locking chain stitching the mouth of the filled bags with polypropylene thread by power driven double needle double stitched machine, stacking the same in batches of 100, carrying the same to the dumping site including all handling charges and local carriage within a distance of 150 m and laying properly as directed. (Sand/silt, Geo Bag and Polypropylene thread will be supplied by the department free of cost) Without Boat
Collection and supply of sand from approved quarry of specified grade for construction work free from debries and other foreign material etc. complete as directed.
Carriage of boulder/metal /sand /gravel, etc. including loading & unloading cost of P.O.L. etc. complete and including hire charge of truck with driver and handyman etc., complete as directed. Gravel Road For 1st Km: (For every Km extra lead beyond initial lead of 1 Km & up to 10 Km.) Lead= 6 Km
Local carriage of boulder, metal, gravel/sand etc. from the approachable site beyond 150 m and up to 3.00 Km from the work site including loading from stack and unloading at work site with 10 (Ten) ton capacity truck, supplying P.O.L. etc. complete as directed.
Supply of Sewing Thread/Yarn PPMF Stitching Thread (2000 Den. Kaplon)
Construction of temporary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart, driven at least 0.75 m below ground and height above plinth of 2.5 m. Split Jatti bamboo/tarza wall 10 cm thick touch roofing over bamboo rua frame, placing at 0.15 m clear apart, fitted with bamboo kamies from binding doors and windows with Bamboo Chattai, strengthening with Bamboo frame binding with wire, roofing with TATA Shaktee roofing sheets etc., complete as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos./Rm & Jati Bamboo at the rate of 61.00 nos./Rm)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
joyanagar_bid.pdf
Tender Documents • 0.57 MB
BOQ_80008.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .