| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.2 LAccepted-AOC | 1 | Accepted-AOC As Per AOC | |
| 2 | 2₹19.6 L+₹34,955.03 (1.82%)Rejected-Finance GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | 2 | Rejected-Finance As Per Financial | |
| 3 | 3₹20.2 L+₹97,398.66 (5.06%)Rejected-Finance TUNDLA FIROZABAD UTTAR PRADESH | TUNDLA | FIROZABAD | UTTAR PRADESH | 3 | Rejected-Finance As Per Financial | |
| 4 | 4₹20.5 L+₹1.2 L (6.40%)Rejected-Finance | 4 | Rejected-Finance As Per Financial | |
| 5 | 5₹20.7 L+₹1.4 L (7.43%)Rejected-Finance ALIGARH | UTTAR PRADESH | 202001 | 5 | Rejected-Finance As Per Financial |
| Sl No | Description | Qty | Unit | DEVENDRA KUMAR SHARMA L5 | Aditya Constructions L4 | M/s CHANDRA PAL SINGH L3 | MANVENDRA PRATAP SINGH CONTRACTOR AND SUPPLIER L2 | M/s AMAN MACHINERY STORE L1 | M/S SHREE JEE CONSTRUCTIONS L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismentling of brick masonary in cement with mechanicl and mannual means and Disposal of debris witin a distance of 60m or as per engineer-in -charge. | 19.1 | Cum | 100 ₹1,910 | 50 ₹955 | 200 ₹3,820 | 336.7 ₹6,430.97 | 10 ₹191 Lowest | 100 ₹1,910 |
| 2.00 | Dismentling of reinforced cement concrete work with mechanicl and mannual means and Disposal of debris witin a distance of 60m or as per engineer-in -charge. | 2.89 | Cum | 100 ₹289 | 50 ₹144.5 | 400 ₹1,156 | 411.45 ₹1,189.09 | 5 ₹14.45 Lowest | 100 ₹289 |
| 3.00 | Earthwork in excavation foundation in ordinary soil including all lead and lift with all cost of labour and T&P etc. | 254.2 | Cum | 25 ₹6,355 | 50 ₹12,710 | 50 ₹12,710 | 43.55 ₹11,070.41 | 30 ₹7,626 | 20 ₹5,084 Lowest |
| 4.00 | Providing & Laying C.C. M-15(1:2:4mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete. | 39.37 | Cum | 3,300 ₹1,29,921 | 4,500 ₹1,77,165 | 3,200 ₹1,25,984 Lowest | 3,700 ₹1,45,669 | 3,800 ₹1,49,606 | 4,000 ₹1,57,480 |
| 5.00 | Providing and Laying C.C. M-20(1:1.5:3mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete. | 88.01 | Cum | 5,400 ₹4,75,254 | 4,500 ₹3,96,045 | 4,700 ₹4,13,647 | 4,400 ₹3,87,244 Lowest | 4,486 ₹3,94,812.86 | 5,000 ₹4,40,050 |
| 6.00 | Providing and laying R.C.C 1:1:2 with coarse sand & aggregate of size 10 to 25 mm including mechanical mixing and all cost of material,labour and T&P etc. But excluding cost of steel reinforcement. | 119.44 | Cum | 6,400 ₹7,64,416 | 5,500 ₹6,56,920 | 5,500 ₹6,56,920 | 4,900 ₹5,85,256 Lowest | 5,232 ₹6,24,910.08 | 6,000 ₹7,16,640 |
| 7.00 | Centering and shuttering for R.C.C. work including all cost of material, labour and T&P etc. for completion of work | 263.63 | Sqm | 150 ₹39,544.5 Lowest | 200 ₹52,726 | 250 ₹65,907.5 | 523.25 ₹1,37,944.4 | 485 ₹1,27,860.55 | 600 ₹1,58,178 |
| 8.00 | Centering and shuttering for C.C. work including all cost of material, labour and T&P etc. for completion of work | 260.53 | Sqm | 100 ₹26,053 Lowest | 200 ₹52,106 | 300 ₹78,159 | 523.25 ₹1,36,322.32 | 300 ₹78,159 | 400 ₹1,04,212 |
| 9.00 | Steel reinforcement with bending, binding, cutting and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P etc. for completion of work. | 9.43 | M.T. | 65,000 ₹6,12,950 | 70,000 ₹6,60,100 | 68,000 ₹6,41,240 | 56,000 ₹5,28,080 | 55,275 ₹5,21,243.25 Lowest | 80,000 ₹7,54,400 |
| 10.00 | Earth work for making & removal of diversion & Bundha up to 100 m. including Cost of all labour and T&P etc as per instruction of Engineer-in-Charge . | 296.95 | Cum | 20 ₹5,939 | 50 ₹14,847.5 | 20 ₹5,939 | 43.55 ₹12,932.17 | 43.55 ₹12,932.17 | 10 ₹2,969.5 Lowest |
Tender Value
₹30.2 L
EMD Value
₹60,320
Closing Date
25 May 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
IRRIGATION DIVISION HATHRAS
CONSTRUCTION OF VRB OF BARHAN DY. AT CH- KM-15.758
2026_UPIDC_1147326_1
01/EE/2026-27
Open Tender
Civil Works - Bridges
Item Rate
90 days
HATHRAS
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹60,320
14 Oct 2026
13 May 2026
25 May 2026
13 May 2026
25 May 2026
13 May 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of brick masonary in cement with mechanicl and mannual means and Disposal of debris witin a distance of 60m or as per engineer-in -charge. | - | Cum | 1.25 | - |
| 2 | Dismentling of reinforced cement concrete work with mechanicl and mannual means and Disposal of debris witin a distance of 60m or as per engineer-in -charge. | - | Cum | 2.25 | - |
| 3 | Earthwork in excavation foundation in ordinary soil including all lead and lift with all cost of labour and T&P etc. | 1 | Cum | 3.25 | ₹3.25 |
| 4 | Providing & Laying C.C. M-15(1:2:4mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete. | 1 | Cum | 4.25 | ₹4.25 |
| 5 | Providing and Laying C.C. M-20(1:1.5:3mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete. | - | Cum | 5.25 | - |
| 6 | Providing and laying R.C.C 1:1:2 with coarse sand & aggregate of size 10 to 25 mm including mechanical mixing and all cost of material,labour and T&P etc. But excluding cost of steel reinforcement. | 1 | Cum | 6.25 | ₹6.24 |
| 7 | Centering and shuttering for R.C.C. work including all cost of material, labour and T&P etc. for completion of work | 1 | Sqm | 7.25 | ₹7.24 |
| 8 | Centering and shuttering for C.C. work including all cost of material, labour and T&P etc. for completion of work | 1 | Sqm | 8.25 | ₹8.24 |
| 9 | Steel reinforcement with bending, binding, cutting and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P etc. for completion of work. | 1 | M.T. | 9.25 | ₹9.24 |
| 10 | Earth work for making & removal of diversion & Bundha up to 100 m. including Cost of all labour and T&P etc as per instruction of Engineer-in-Charge . | 1 | Cum | 10.25 | ₹10.24 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
BOQ_2146371.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .