Loading…
Loading…
Tender Value
₹13.7 L
EMD Value
₹27,340
Closing Date
29 Jun 2026, 12:00 pm
EE
VIKAS BHAWAN VARANASI
Ward akatha me kshetra stith kashi inklev colony me janmanas ki suvidha hetu samudaic haal nirman karya
2026_REDUP_1155535_1
521 DATE 16-05-2026
Open Tender
Civil Works
90 days
EE RED VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹27,340
Yes
1 Jun 2026
1 Jun 2026
29 Jun 2026
1 Jun 2026
29 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. DSR -2.32 ( Rate For VNs =8.95*.735=6.58) | - | sqm | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: DSR 2.35.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration (Rate For VNS -310.05*.735=227.88) | - | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Earthwork in Excavation of foundation As Per DSR 2.80 dinary soil including lift upto 1.50 m and lead upt 30 m , and inculiding filling ,watring and ramming of Excavated earth in the space between building and the sides of foundation trenches or into the plinty and removal and disposal surplus warth as directed by Engineer -in-charge upto a sistance of 30 m from the foundation trenches as per(Rate For VNS -260.3*0.735=191.32) | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Concrete with 4 cm gauge Stone ballast , sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation AS Per DSR 4.1.8 and under floor including supply of all materials labour T & P etc. required for proper completion of the work.(Rate For VNS -6812*0.735=5006.80) | - | cum | 1 | - | BI01010001010000000000000515BI0100001116 |
| 5 | R.C.C work with cement approved coarse sand and 2 cm. Gauge approved stone grit proportion of 1:1½:3 in R.C.C up to plinth level all work AsPer DSR 5.1.2 (Rate For VNS -9045.75*0.735=6648.62) | - | cum | 1 | - | BI01010001010000000000000515BI0100001117 |
| 6 | Centering and shuttering including strutting, Footing propping etc. and removal DSR 5.9.1 (Rate For VNS -392.15*0.735=288.23) | 1 | sqm | 1 | ₹1 | BI01010001010000000000000515BI0100001118 |
| 7 | Centering and shuttering including strutting, column propping etc. and removal DSR 5.9.6 (Rate For VNS -961.3*0.735=706.55) | - | sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Centering and shuttering including strutting, Lintel,Beam,Plinth propping etc. and removal DSR 5.9.5 (Rate For VNS -734.4*0.735=540.0) | - | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Centering and shuttering including strutting, For Roof,Slab,sunshade propping etc. and removal DSR 5.9.3&4(Rate For VNS -927.25*0.735=681.53) | - | sqm | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | R.C.C Work with cement approved coarse sand & 20 mm guage approved stone grit in proportion of 1:1½:3 in superstructure, beam and slab roof and loumn including supply of all materials labour T & P etc. required for proper completion of the work. as per DSR 5.2.2 (Rate For VNS -10852.95*0.735=7976.92) | - | cum | 1 | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
sbd.pdf
Tender Documents • 1.23 MB
BOQ_2164714.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid