| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC 35 P C SEN STADIUM BUILDING JANNAGAR ROAD MAHESH SERAMPORE HOOGHLY 712202 | SERAMPORE | HOOGHLY | WEST BENGAL | 712202 | ₹2.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.9 L+₹3,599.35 (1.25%)Rejected-Finance | ₹2.9 L+₹3,599.35 (1.25%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.9 L+₹6,968.34 (2.42%)Rejected-Finance | ₹2.9 L+₹6,968.34 (2.42%) | L3 | Rejected-Finance L3 |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
6 Mar 2026, 2:00 pmClosed
EXECUTIVE ENGINEEER BR XIII XIV SSU
THE KOLKATA MUNICIPAL CORPORATION OFFICE OF THE EXECUTIVE ENGINEEER WATER SUPPLY DEPARTMENT 516, D.H. ROAD KOLKATA-700034
MENDING AND MAINTENANCE WORKS OF DIFFERENT DIA. F/W PIPE LINE LEAKAGES, WITH ALLIED WORKS NEAR 876, HO-CHI-MINH SARANI, 16 FT. RD.NEAR SAPTARSHI CLUB , 2/1, KALIPUR RD., 85/4, L.N. MOTILAL RD. ETC. IN WD. NO. 128 (BR. XIV)..
2026_KMC_1009591_1
KMC/WS/EE/SSU/W- 128/21/25-26/M-50/235
Open Tender
CIVIL WORKS
Percentage
21 days
KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,800
9 Sept 2026
19 Feb 2026
9 Mar 2026
19 Feb 2026
6 Mar 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 12 | Daily | 202 | ₹2,424 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 20.4 | CUBIC METER | 636 | ₹12,974.4 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 96.8 | CUBIC METER PERCENT | 119.27 | ₹11,545.34 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation | 117.2 | CUBIC METER PERCENT | 77.54 | ₹9,087.69 |
| 5 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.4 Lead jointing to C.I pipes and specials excluding cost of lead and spun yarn all complete to make the joint watertight at required hydraulic pressure as per specification and direction of the Engineer-in-charge,[Lead shall be supplied departmentally to the Agency at free of cost as per availability]Diameter in mm 100mm dia. | 4 | EACH | 304 | ₹1,216 |
| 6 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.4 Lead jointing to C.I pipes and specials excluding cost of lead and spun yarn all complete to make the joint watertight at required hydraulic pressure as per specification and direction of the Engineer-in-charge,[Lead shall be supplied departmentally to the Agency at free of cost as per availability]Diameter in mm 150mm dia. | 6 | EACH | 440 | ₹2,640 |
| 7 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.4 Lead jointing to C.I pipes and specials excluding cost of lead and spun yarn all complete to make the joint watertight at required hydraulic pressure as per specification and direction of the Engineer-in-charge,[Lead shall be supplied departmentally to the Agency at free of cost as per availability]Diameter in mm 200mm dia. | 4 | EACH | 581 | ₹2,324 |
| 8 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.21 Supply of Pig Lead 99.999% purity | 36.9 | KILOGRAM | 220 | ₹8,118 |
| 9 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 1. Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (A) For Exposed Work (a) (ii) 15 mm dia. medium quality | 8.3 | METER | 192 | ₹1,593.6 |
| 10 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (i) 15 mm dia. medium quality | 6.5 | METER | 214 | ₹1,391 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
TECHNICAL_BID_128_21_M-50_235.pdf
Tender Documents • 1.21 MB
BOQ_2478547.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .