| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹2.0 L+₹24,903 (14.3%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹2.0 L+₹25,509 (14.6%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
29 Jan 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
REPLACEMENT OF 420KV C.T./C.V.T. AND L.A. AT 400KV S/s SULTANPUR UNDER ELECTY. 400KV S/s DIVISION SULTANPUR
2021_UPTCL_544339_1
T. NO. 109/ETCS/2020-21
Open Tender
Electrical Works
Item Wise
30 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
SE ETC Sultanpur
₹2,000
19 Feb 2021
7 Jan 2021
30 Jan 2021
7 Jan 2021
29 Jan 2021
7 Jan 2021
7 Jan 2021 - 29 Jan 2021
180 days
Amount
Safe dismentling of 420KV C.T. by opening of nut bolts, opening of jumpers, dismentaling of side 4” IPS pipe, cable connection including disconnecting two point earthing with labour, T&P and crane shall be arranged by the contractor .
Erection of 420KV C.T. along with modification in 4” IPS pipe bus on both side by bending etc. for making hight adjustable to C.T. leads. Mounting & tightening of jumpers, nuts and bolts at appropriate places, making required connection in C.T. juction box with all labour, T&P and crane to be arrange by the contractor.
Safe carriage of 420KV C.T. for 400KV S/S Divisonal store, Sultanpur to 400KV S/S switchyard Sultanpur including loading at store and unloading in switchyard and carriage of old CT from switchyard to store including loading and unloading with all required labour T&P and crane.
Modification in support structure by providing channel for base adjustment for erection of 420KV CT for making adjustment in hight by cutting, grinding and welding works properly and providing proper path way for two point earthing through copper bands with labur, T&P.
Fixing of CT junction box (size 600x500x300) suitable for terminating CT cores of all 3 Phases and extending further to 400KV Control room. The work includes digging of earth, making pit of suitable size, casting foundation with the help of cement, concreat, coarse sand in ratio 1:2:3 and grouting CT junction box in 400KV Tanda Thermal Bay in switchyard and fixing the box with the help of nut and bolts & other associated work.
Proper cable laying of 4Cx2.5mm2 XLPE Aluminium power cable (approx 07Mtr.) from CT core box to CT junction box by digging earth, keeping bricks over the cable and poring snad over it. (Cable provided by department)
Providing & fixing of suitable size lugs and cable gland for 4Cx2.5mm2 cable size at both ends and proper termination of end including of all materail labour and T&P.
Safe dismentling of 198KV LA by opeing of nut bolts, opeing of jumpers, cable connecton including disconnection from two point earthing with labour, T&P and crane.
Erection of 198KV LA along with their support structure at 400KV S/S, Sultanpur with all required labour, T&P and crane including jumering from bus.
Modification in support structure for erection of 198KV LA for making adjustment in hight by cutting, grinding and welding works and providing channel for base adjustment properly with labur, T&P.
Safe carriage of 198KV LA for 400KV S/S Divisonal store, Sultanpur to 400KV S/S switchyard Sultanpur including loading at store and unloading in switchyard and carriage of old LA from switchyard to store including loading and unloading with all required labour T&P and crane.
Safe dismentling of 420KV Post Insulator by opeing of nut bolts, opeing of jumpers, cable connecton including disconnection from two point earthing with labour, T&P and crane.
Erection of 420KV Post Insulator along with their support structure at 400KV S/S, Sultanpur with all required labour, T&P and crane including jumering from bus.
DEEPAK ENGINEERING
SHRI SAI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .