| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.0 L+₹14,922 (2.56%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K.S.Kandhasamy L1 | R.Gopal L2 |
|---|---|---|---|---|---|
| 1.001.) Providing CC Road at Amman Kovil Kadu Arunachalam House to Kutti House H/o Kanagagiri Length of the road 112 in meter, Width of the road 3.00 in meter In Magudanchavadi Block Salem District Work No 15 | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers | 20.16 | cum | 112 ₹2,257.92 Lowest | 112 ₹2,257.92 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 35.17 | cum | 4,924 ₹1,73,177.08 Lowest | 5,124 ₹1,80,211.08 |
| 4.00 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon. | 134.4 | Sqm | 476.5 ₹64,041.6 Lowest | 476.5 ₹64,041.6 Lowest |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 28.45 | cum | 273 ₹7,766.85 Lowest | 273 ₹7,766.85 Lowest |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 15.46 | cum | 5,635 ₹87,117.1 Lowest | 5,835 ₹90,209.1 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 25.2 | cum | 6,293 ₹1,58,583.6 Lowest | 6,393 ₹1,61,103.6 |
| 8.00 | Provision for Bitumen Pad | 3 | Sqm | 479 ₹1,437 Lowest | 479 ₹1,437 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 88,730 ₹88,730 Lowest | 91,006 ₹91,006 |
Tender Value
₹6.0 L
EMD Value
₹5,980
Closing Date
8 Mar 2024, 3:00 pmClosed
Block Development Officer (VP)
Magudanchavadi
Providing CC Road at Amman Kovil Kadu Arunachalam House to Kutti House H/o Kanagagiri Length of the road 112 in meter, Width of the road 3.00 in meter In Magudanchavadi Block Salem District Work No 15
2024_RDTN_433047_1
ROC NO.2398/2023/P1
Open Tender
Civil Works
Item Wise
90 days
Magudanchavadi
Providing CC Road at Amman Kovil Kadu Arunachalam House to Kutti House H/o Kanagagiri Length of the road 112 in meter, Width of the road 3.00 in meter In Magudanchavadi Block Salem District Work No 15
2 documents required · 2 mandatory
₹0
₹5,980
10 Oct 2025
2 Mar 2024
8 Mar 2024
2 Mar 2024
8 Mar 2024
2 Mar 2024
2 Mar 2024 - 8 Mar 2024
Amount
1.) Providing CC Road at Amman Kovil Kadu Arunachalam House to Kutti House H/o Kanagagiri Length of the road 112 in meter, Width of the road 3.00 in meter In Magudanchavadi Block Salem District Work No 15
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Provision for Bitumen Pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.Gopal
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .