Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹31.0 L+₹1.6 L (5.31%)Rejected-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L2 | Rejected-Finance L2 bidder |
Tender Value
₹27.9 L
EMD Value
₹27,900
Closing Date
29 Nov 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2024_EB_503896_1
OT-028/2024-25 of SE/GCC-1/CHN
Open Tender
Civil Works
Works
120 days
Oragadam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹27,900
Yes
15 Feb 2025
22 Nov 2024
30 Nov 2024
22 Nov 2024
29 Nov 2024
22 Nov 2024
Amount
Engaging JCB for levelling the ups and downs of the location for making of foundation including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Dismantling of existing RCC transfomer gantry including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Dismantling of the existing brick work transformer gantry including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Dismantling of existing PCC plinth including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Providing and laying Sand filling for foundation and basement layer not more than 15cm thick including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site.
Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
R:C:C 1:1.5:3 using 12 to 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work
R.C.C. 1:1.5:3 using 12- 20mm metal with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
R.C.C. 1:1.5:3 using 12- 20mm metal for Wall with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
R.C.C. 1:1.5:3 using 12- 20mm metal for Cast in situ slab with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
R.C.C. 1:1.5:3 using 12- 20mm metal for Cover slab with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supplying and providing 110 lbs rails in transformer plint and labour charges for fixing in correct position and aligenment as directed by dept.Engineer at site including cost of Rail, cutting charges , transport to site, labour, lead, lift etc. Complete as directed by the department engineer at site.
Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as per standard specification and as directed by the department engineer at site.
Providing Anchor / Grip rod for foundation in the plinth surface with drilling of 20 mm dia holes and fixing fo 20 mm dia RTS rod 1.5m length inside the holes and 1m length out side the holes with L shape bending including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
Supplying, fabrication of MS angle including cost of angle, flats as per drawing and specification and galvanising, placing in position including cost of all materials, galvanizing charges, transportation, labour, lead etc., complete as directed by the department engineer at site.
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 40mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 32mm dia
Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 25mm dia
Supplying & fixing gunmetal wheel value including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site.
Labour charges for Filling with stone dust including watering and consolidation as per standard specification, including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Supplying and filling 20mm metal including cost of all materials, labour, lead and lift etc., complete as directed by the department at site.
Painting 2 coats with approved plastic emulsion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceilling and other new surface including cost of all materials, colur pigments labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K S CONSTRUCTION (BID ID -1197133)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .